| 1 | Removing small pipe culverts (203.0100) | EACH | 4 | $500.00 | $300.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 160 | $6.00 | $20.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 265 | $8.35 | $5.55 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 93,400 | $1.25 | $0.80 |
| 5 | Removing curb & gutter (204.0150) | LF | 615 | $10.00 | $10.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 265 | $8.00 | $10.00 |
| 7 | Removing guardrail (204.0165) | LF | 1,555 | $2.50 | $2.10 |
| 8 | Prepare foundation for asphaltic paving (project) 01. 3020-00-70 (211.0101) | EACH | 1 | $15,000 | $22,500 |
| 9 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 1 | $2,500.00 | $1,255.00 |
| 10 | Finishing roadway (project) 01. 3020-00-70 (213.0100) | EACH | 1 | $1,750.00 | $2,250.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,050 | $20.90 | $21.00 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,480 | $18.00 | $25.60 |
| 13 | Drilled tie bars (416.0610) | EACH | 60 | $6.68 | $15.50 |
| 14 | Tack coat (455.0605) | GAL | 13,620 | $3.25 | $2.25 |
| 15 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $3,250.00 | $1,340.00 |
| 16 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $4,250.00 | $2,480.00 |
| 17 | Incentive density PWL HMA pavement (460.2005) | DOL | 13,820 | $1.00 | $1.00 |
| 18 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 4,940 | $1.00 | $1.00 |
| 19 | Incentive air voids HMA pavement (460.2010) | DOL | 19,610 | $1.00 | $1.00 |
| 20 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 19,610 | $62.10 | $75.25 |
| 21 | Asphaltic surface (465.0105) | TON | 2,447 | $87.40 | $115.50 |
| 22 | Asphaltic surface driveways and field entrances (465.0120) | TON | 472 | $87.40 | $165.00 |
| 23 | Asphaltic rumble strips, centerline (465.0560) | LF | 18,700 | $0.30 | $0.27 |
| 24 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 512 | $315.00 | $300.00 |
| 25 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 8 | $3,200.00 | $3,000.00 |
| 26 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 615 | $59.48 | $64.00 |
| 27 | Concrete sidewalk 4-inch (602.0405) | SF | 3,380 | $9.82 | $8.25 |
| 28 | Curb ramp detectable warning field yellow (602.0505) | SF | 160 | $32.26 | $48.40 |
| 29 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 37 | $47.23 | $83.85 |
| 30 | Adjusting catch basin covers (611.8105) | EACH | 7 | $500.00 | $500.00 |
| 31 | Barrier system grading shaping finishing (614.0010) | EACH | 2 | $13,868 | $4,000.00 |
| 32 | MGS guardrail 3 (614.2300) | LF | 1,312.50 | $26.00 | $28.00 |
| 33 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,450.00 | $3,400.00 |
| 34 | Maintenance and repair of haul roads (project) 01. 3020-00-70 (618.0100) | EACH | 1 | $10.00 | $0.01 |
| 35 | Mobilization (619.1000) | EACH | 1 | $132,750 | $135,104 |
| 36 | Water (624.0100) | MGAL | 14 | $40.00 | $50.00 |
| 37 | Salvaged topsoil (625.0500) | SY | 5,294 | $3.50 | $3.00 |
| 38 | Silt fence (628.1504) | LF | 1,000 | $2.50 | $1.90 |
| 39 | Silt fence maintenance (628.1520) | LF | 1,000 | $0.05 | $0.10 |
| 40 | Mobilizations erosion control (628.1905) | EACH | 3 | $250.00 | $150.00 |
| 41 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $300.00 | $75.00 |
| 42 | Erosion mat class I type B (628.2004) | SY | 5,294 | $0.95 | $1.55 |
| 43 | Inlet protection type D (628.7020) | EACH | 10 | $125.00 | $90.00 |
| 44 | Culvert pipe checks (628.7555) | EACH | 25 | $20.00 | $29.00 |
| 45 | Rock bags (628.7570) | EACH | 50 | $20.00 | $9.50 |
| 46 | Fertilizer type B (629.0210) | CWT | 3.36 | $67.50 | $81.50 |
| 47 | Seeding mixture no. 30 (630.0130) | LB | 240 | $7.30 | $8.75 |
| 48 | Seeding temporary (630.0200) | LB | 145 | $3.50 | $3.15 |
| 49 | Markers culvert end (633.5200) | EACH | 8 | $55.00 | $58.00 |
| 50 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 6 | $75.00 | $85.10 |
| 51 | Signs type II reflective H (637.2210) | SF | 34.81 | $32.50 | $24.10 |
| 52 | Removing signs type II (638.2602) | EACH | 6 | $35.00 | $20.00 |
| 53 | Removing small sign supports (638.3000) | EACH | 6 | $35.00 | $20.00 |
| 54 | Field office type B (642.5001) | EACH | 1 | $9,250.00 | $12,225 |
| 55 | Traffic control drums (643.0300) | DAY | 6,330 | $0.18 | $0.18 |
| 56 | Traffic control barricades type III (643.0420) | DAY | 3,600 | $0.46 | $0.46 |
| 57 | Traffic control warning lights type A (643.0705) | DAY | 7,200 | $0.05 | $0.05 |
| 58 | Traffic control warning lights type C (643.0715) | DAY | 2,520 | $0.13 | $0.13 |
| 59 | Traffic control signs (643.0900) | DAY | 38,050 | $0.25 | $0.25 |
| 60 | Traffic control covering signs type II (643.0920) | EACH | 28 | $37.53 | $37.53 |
| 61 | Traffic control signs PCMS (643.1050) | DAY | 38 | $30.00 | $30.00 |
| 62 | Temporary marking line paint 6- inch (643.3165) | LF | 49,880 | $0.40 | $0.40 |
| 63 | Traffic control (643.5000) | EACH | 1 | $13,000 | $13,000 |
| 64 | Temporary pedestrian surface matting (644.1440) | SF | 600 | $2.27 | $2.27 |
| 65 | Temporary pedestrian curb ramp (644.1601) | DAY | 2,160 | $2.00 | $2.00 |
| 66 | Temporary pedestrian detectable warning field (644.1605) | SF | 190 | $9.60 | $9.60 |
| 67 | Temporary pedestrian barricade (644.1810) | LF | 780 | $4.00 | $4.00 |
| 68 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 92,500 | $1.25 | $1.25 |
| 69 | Marking stop line epoxy 18-inch (646.6120) | LF | 210 | $18.00 | $18.00 |
| 70 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 380 | $14.00 | $14.00 |
| 71 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 290 | $20.00 | $20.00 |
| 72 | Locating no-passing zones (648.0100) | MI | 4.67 | $650.00 | $650.00 |
| 73 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 615 | $0.67 | $2.00 |
| 74 | Construction staking pipe culverts (650.6000) | EACH | 4 | $109.27 | $235.00 |
| 75 | Construction staking resurfacing reference (650.8000) | LF | 24,660 | $0.09 | $0.12 |
| 76 | Construction staking curb ramps (650.9000) | EACH | 15 | $140.00 | $250.00 |
| 77 | Construction staking sidewalk (project) 01. 3020-00-70 (650.9500) | EACH | 1 | $452.92 | $100.00 |
| 78 | Construction staking supplemental control (project) 01. 3020-00-70 (650.9911) | EACH | 1 | $433.96 | $10.00 |
| 79 | Sawing asphalt (690.0150) | LF | 1,025 | $1.39 | $1.10 |
| 80 | Sawing concrete (690.0250) | LF | 185 | $2.25 | $2.10 |
| 81 | Incentive iri ride (740.0440) | DOL | 18,680 | $1.00 | $1.00 |
| 82 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 |
| 83 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 |
| 84 | Special 01. curb ramp grading shaping finishing (SPV.0060) | EACH | 15 | $1,950.00 | $1,225.00 |
| 85 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 9,340 | $1.70 | $5.50 |