WisDOT contract 20250311015 bid tabulation

C Racine N Main Street; Goold St to Melvin Ave (LOC STR, Racine County C Racine N Main Street). Let by Wisconsin DOT on March 11, 2025, Racine. 4 bids received; low bid $2,501,263 by Lalonde Contractors Incorporated.

Owner
Wisconsin DOT
Letting
11 MAR 2025
Pay items
118
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lalonde Contractors Incorporated$2,501,263Low
2A.W. Oakes & Son, Inc.$2,713,148+8.0%
3Stark Pavement Corporation$2,720,000+9.0%
4Zignego Company, Inc.$2,779,443+11%
WisDOT contract 20250311015: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lalonde Contractors Incorporated2. A.W. Oakes & Son, Inc.3. Stark Pavement Corporation4. Zignego Company, Inc.
1Clearing (201.0120)ID26$60.00$75.00$60.00$60.00
2Grubbing (201.0220)ID26$30.00$65.00$30.00$30.00
3Removing concrete pavement (204.0100)SY16,580$5.32$8.20$8.10$5.10
4Removing concrete sidewalk (204.0155)SY2,140$9.15$10.00$6.96$6.20
5Removing concrete bases (204.0195)EACH24$355.00$375.00$355.00$350.00
6Removing inlets (204.0220)EACH18$785.00$310.00$785.00$785.00
7Removing storm sewer (size) 01. 8- inch (204.0245)LF64$20.00$12.00$20.00$20.00
8Removing storm sewer (size) 02. 12-inch (204.0245)LF380$20.00$12.00$20.00$20.00
9Sealing pipes (204.0280)EACH4$664.00$235.00$664.00$664.00
10Removing (item description) 01. street light poles (204.9060.S)EACH18$328.00$350.00$328.00$328.00
11Excavation common (205.0100)CY10,818$18.63$12.65$13.63$10.50
12Finishing roadway (project) 01. 2703-09-71 (213.0100)EACH1$2,981.00$2,000.00$5,000.00$1,000.00
13Base aggregate dense 1 1/4-inch (305.0120)TON6,930$19.48$14.50$12.82$18.00
14Breaker run (311.0110)TON4,171$23.05$17.50$15.39$18.00
15Concrete pavement 7-inch (415.0070)SY13,800$46.34$57.00$49.50$65.05
16Concrete pavement gaps (415.0210)EACH2$1,100.33$1,000.00$1,800.00$1,000.00
17Concrete pavement joint filling (415.4100)SY15,250$1.54$2.00$2.20$1.00
18Drilled tie bars (416.0610)EACH142$13.54$10.00$20.00$15.00
19Drilled dowel bars (416.0620)EACH100$17.17$15.00$30.00$15.00
20Asphaltic surface driveways and field entrances (465.0120)TON3$375.00$425.00$375.00$375.00
21Asphaltic surface temporary (465.0125)TON23$250.00$300.00$250.00$250.00
22Concrete curb & gutter 30-inch type A (601.0409)LF6,070$26.62$22.00$22.75$19.29
23Concrete curb pedestrian (601.0600)LF245$48.46$45.00$36.00$53.90
24Concrete sidewalk 5-inch (602.0410)SF19,250$7.02$7.30$9.25$6.88
25Curb ramp detectable warning field yellow (602.0505)SF456$41.78$55.00$44.00$49.84
26Curb ramp detectable warning field radial yellow (602.0605)SF28$68.56$75.00$55.00$82.47
27Concrete driveway 6-inch (602.0810)SY1,064$62.76$65.00$59.00$58.12
28Concrete driveway hes 6-inch (602.0860)SY20$72.82$75.00$85.00$58.76
29Concrete steps (602.1500)SF19$68.63$100.00$90.00$84.96
30Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF1,299$92.00$94.00$92.00$92.00
31Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF63$150.00$97.00$150.00$150.00
32Inlet covers type H (611.0624)EACH15$1,045.00$850.00$1,045.00$1,045.00
33Inlet covers type H-S (611.0639)EACH24$1,045.00$835.00$1,045.00$1,045.00
34Inlet covers type S (611.0651)EACH1$1,039.00$835.00$1,039.00$1,039.00
35Inlets 4-FT diameter (611.3004)EACH23$2,622.00$2,700.00$2,622.00$2,622.00
36Inlets 2X3-FT (611.3230)EACH17$2,144.00$2,500.00$2,144.00$2,144.00
37Adjusting manhole covers (611.8110)EACH11$791.00$520.00$791.00$791.00
38Mobilization (619.1000)EACH1$84,927$195,000$305,987$282,000
39Dust control surface treatment (623.0200)SY20,400$0.01$0.01$0.20$0.01
40Topsoil (625.0100)SY4,710$5.05$6.00$5.05$5.05
41Mobilizations erosion control (628.1905)EACH9$50.00$50.00$50.00$50.00
42Mobilizations emergency erosion control (628.1910)EACH5$50.00$50.00$50.00$50.00
43Inlet protection type A (628.7005)EACH51$50.00$60.00$50.00$50.00
44Inlet protection type B (628.7010)EACH23$50.00$60.00$50.00$50.00
45Inlet protection type C (628.7015)EACH18$67.00$75.00$67.00$67.00
46Inlet protection type D (628.7020)EACH40$125.00$150.00$125.00$125.00
47Tracking pads (628.7560)EACH6$0.01$500.00$500.00$100.00
48Fertilizer type B (629.0210)CWT2.90$80.00$100.00$80.00$80.00
49Sod water (631.0300)MGAL184$10.00$15.00$10.00$10.00
50Sod lawn (631.1000)SY5,181$6.61$7.50$6.61$6.61
51Posts tubular steel 2X2-inch X 16- FT (634.0816)EACH22$230.00$250.00$230.00$230.00
52Signs type II reflective H (637.2210)SF123.94$22.00$25.00$22.00$22.00
53Removing signs type II (638.2602)EACH12$15.00$20.00$15.00$15.00
54Removing small sign supports (638.3000)EACH9$15.00$20.00$15.00$15.00
55Field office type B (642.5001)EACH1$14,368$23,000$14,000$20,000
56Traffic control drums (643.0300)DAY14,138$0.21$0.25$0.21$0.21
57Traffic control barricades type III (643.0420)DAY3,936$0.53$0.60$0.53$0.53
58Traffic control warning lights type A (643.0705)DAY9,672$0.07$0.10$0.07$0.07
59Traffic control warning lights type C (643.0715)DAY2,720$0.18$0.20$0.18$0.18
60Traffic control signs (643.0900)DAY29,597$0.18$0.20$0.18$0.18
61Traffic control signs PCMS (643.1050)DAY28$36.15$40.00$36.15$36.15
62Temporary marking line paint 4- inch (643.3105)LF1,441$0.40$0.50$0.40$0.40
63Temporary marking line removable tape 4-inch (643.3150)LF1,721$1.75$2.00$1.75$1.75
64Traffic control (643.5000)EACH1$15,682$17,000$15,682$15,682
65Temporary pedestrian surface matting (644.1440)SF175$6.29$7.00$6.29$7.00
66Temporary pedestrian curb ramp (644.1601)DAY376$4.69$5.00$4.69$5.00
67Temporary pedestrian detectable warning field (644.1605)SF84$18.98$20.00$18.98$19.00
68Temporary pedestrian barricade (644.1810)LF650$3.22$3.50$3.22$3.22
69Geotextile type SR (645.0135)SY4,230$3.12$5.00$3.15$1.90
70Marking line epoxy 4-inch (646.1020)LF13,109$0.84$1.00$0.60$0.60
71Marking line epoxy 8-inch (646.3020)LF412$1.68$1.70$0.95$0.95
72Marking arrow epoxy (646.5020)EACH18$200.00$200.00$305.00$305.00
73Marking word epoxy (646.5120)EACH1$250.00$250.00$330.00$330.00
74Marking symbol epoxy (646.5220)EACH12$210.00$230.00$255.00$255.00
75Marking stop line epoxy 18-inch (646.6120)LF189$10.50$11.00$14.50$14.50
76Marking diagonal epoxy 12-inch (646.7120)LF22$10.00$11.00$11.25$11.25
77Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,405$8.85$9.30$8.50$8.50
78Marking crosswalk epoxy block style 24-inch (646.7520)LF140$17.50$20.00$17.10$17.10
79Marking removal line 4-inch (646.9000)LF660$1.50$2.00$1.50$1.50
80Construction staking storm sewer (650.4000)EACH40$115.00$100.00$82.00$82.00
81Construction staking subgrade (650.4500)LF2,800$0.01$0.01$1.50$1.50
82Construction staking concrete pavement (650.7000)LF2,800$2.15$0.01$2.00$2.00
83Construction staking electrical installations (project) 01. 2703-09- 71 (650.8501)EACH1$1,500.00$3,500.00$1,850.00$1,850.00
84Construction staking curb ramps (650.9000)EACH40$125.00$150.00$129.00$129.00
85Construction staking sidewalk (project) 01. 2703-09-71 (650.9500)EACH1$2,000.00$7,500.00$3,450.00$3,450.00
86Construction staking supplemental control (project) 01. 2703-09-71 (650.9911)EACH1$2,000.00$1,500.00$2,100.00$2,100.00
87Construction staking slope stakes (650.9920)LF2,800$0.70$1.00$0.90$0.90
88Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF5,207$9.65$10.00$9.65$9.65
89Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF794$11.74$13.00$11.74$11.74
90Pull boxes steel 24X42-inch (653.0140)EACH22$1,201.00$1,250.00$1,201.00$1,201.00
91Removing pull boxes (653.0905)EACH3$98.00$100.00$98.00$98.00
92Concrete bases type 5 (654.0105)EACH19$1,232.00$1,300.00$1,232.00$1,232.00
93Electrical wire lighting 12 AWG (655.0610)LF2,442$1.00$1.10$1.00$1.00
94Electrical wire lighting 10 AWG (655.0615)LF651$1.19$1.30$1.19$1.19
95Electrical wire lighting 8 AWG (655.0620)LF18,222$1.57$1.75$1.57$1.57
96Electrical wire lighting 4 AWG (655.0630)LF837$2.07$2.30$2.07$2.07
97Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH19$663.00$700.00$663.00$663.00
98Poles type 5-aluminum (657.0322)EACH19$1,972.00$2,000.00$1,972.00$1,972.00
99Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610)EACH19$380.00$400.00$380.00$380.00
100Sawing asphalt (690.0150)LF57$1.10$2.00$1.10$1.10
101Sawing concrete (690.0250)LF3,358$2.15$2.00$2.15$2.15
102Incentive compressive strength concrete pavement (715.0720)DOL4,140$1.00$1.00$1.00$1.00
103Incentive iri ride (740.0440)DOL4,242$1.00$1.00$1.00$1.00
104On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS550$5.00$5.00$5.00$5.00
105On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,800$5.00$5.00$5.00$5.00
106Special 01. decorative gravel (SPV.0035)CY2$150.00$500.00$500.00$500.00
107Special 02. coloring and stamping concrete custom (SPV.0035)CY2$312.75$2,100.00$1,200.00$798.63
108Special 01. sealing manhole openings (SPV.0060)EACH9$664.00$235.00$664.00$664.00
109Special 02. storm sewer tap (SPV.0060)EACH16$500.00$235.00$500.00$500.00
110Special 03. luminaires utility LED 57 watts (SPV.0060)EACH19$345.00$350.00$345.00$345.00
111Special 04. lighting control cabinet modifications (SPV.0060)EACH1$2,277.00$2,500.00$2,277.00$2,277.00
112Special 05. maintenance of lighting (SPV.0060)EACH1$3,812.00$4,500.00$3,812.00$3,812.00
113Special 06. adjusting sanitary sewer manhole covers (SPV.0060)EACH8$790.00$520.00$790.00$790.00
114Special 07. utility line opening (SPV.0060)EACH3$265.00$1,500.00$1,500.00$1,000.00
115Special 08. install existing circuit into new pull box (SPV.0060)EACH3$355.00$400.00$355.00$355.00
116Special 01. temporary pedestrian barricade move and install (SPV.0090)LF900$4.70$5.00$4.70$4.70
117Special 01. salvage and resetting existing bricks (SPV.0165)SF80$10.00$20.00$10.00$10.00
118Special 01. concrete pavement hes 7-inch (SPV.0180)SY75$87.09$63.00$65.00$85.00
WisDOT contract 20250311015: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy