WisDOT contract 20250311015 bid tabulation
C Racine N Main Street; Goold St to Melvin Ave (LOC STR, Racine County C Racine N Main Street). Let by Wisconsin DOT on March 11, 2025, Racine. 4 bids received; low bid $2,501,263 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 118
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $2,501,263 | Low |
| 2 | A.W. Oakes & Son, Inc. | $2,713,148 | +8.0% |
| 3 | Stark Pavement Corporation | $2,720,000 | +9.0% |
| 4 | Zignego Company, Inc. | $2,779,443 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. A.W. Oakes & Son, Inc. | 3. Stark Pavement Corporation | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 26 | $60.00 | $75.00 | $60.00 | $60.00 |
| 2 | Grubbing (201.0220) | ID | 26 | $30.00 | $65.00 | $30.00 | $30.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 16,580 | $5.32 | $8.20 | $8.10 | $5.10 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 2,140 | $9.15 | $10.00 | $6.96 | $6.20 |
| 5 | Removing concrete bases (204.0195) | EACH | 24 | $355.00 | $375.00 | $355.00 | $350.00 |
| 6 | Removing inlets (204.0220) | EACH | 18 | $785.00 | $310.00 | $785.00 | $785.00 |
| 7 | Removing storm sewer (size) 01. 8- inch (204.0245) | LF | 64 | $20.00 | $12.00 | $20.00 | $20.00 |
| 8 | Removing storm sewer (size) 02. 12-inch (204.0245) | LF | 380 | $20.00 | $12.00 | $20.00 | $20.00 |
| 9 | Sealing pipes (204.0280) | EACH | 4 | $664.00 | $235.00 | $664.00 | $664.00 |
| 10 | Removing (item description) 01. street light poles (204.9060.S) | EACH | 18 | $328.00 | $350.00 | $328.00 | $328.00 |
| 11 | Excavation common (205.0100) | CY | 10,818 | $18.63 | $12.65 | $13.63 | $10.50 |
| 12 | Finishing roadway (project) 01. 2703-09-71 (213.0100) | EACH | 1 | $2,981.00 | $2,000.00 | $5,000.00 | $1,000.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 6,930 | $19.48 | $14.50 | $12.82 | $18.00 |
| 14 | Breaker run (311.0110) | TON | 4,171 | $23.05 | $17.50 | $15.39 | $18.00 |
| 15 | Concrete pavement 7-inch (415.0070) | SY | 13,800 | $46.34 | $57.00 | $49.50 | $65.05 |
| 16 | Concrete pavement gaps (415.0210) | EACH | 2 | $1,100.33 | $1,000.00 | $1,800.00 | $1,000.00 |
| 17 | Concrete pavement joint filling (415.4100) | SY | 15,250 | $1.54 | $2.00 | $2.20 | $1.00 |
| 18 | Drilled tie bars (416.0610) | EACH | 142 | $13.54 | $10.00 | $20.00 | $15.00 |
| 19 | Drilled dowel bars (416.0620) | EACH | 100 | $17.17 | $15.00 | $30.00 | $15.00 |
| 20 | Asphaltic surface driveways and field entrances (465.0120) | TON | 3 | $375.00 | $425.00 | $375.00 | $375.00 |
| 21 | Asphaltic surface temporary (465.0125) | TON | 23 | $250.00 | $300.00 | $250.00 | $250.00 |
| 22 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 6,070 | $26.62 | $22.00 | $22.75 | $19.29 |
| 23 | Concrete curb pedestrian (601.0600) | LF | 245 | $48.46 | $45.00 | $36.00 | $53.90 |
| 24 | Concrete sidewalk 5-inch (602.0410) | SF | 19,250 | $7.02 | $7.30 | $9.25 | $6.88 |
| 25 | Curb ramp detectable warning field yellow (602.0505) | SF | 456 | $41.78 | $55.00 | $44.00 | $49.84 |
| 26 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 28 | $68.56 | $75.00 | $55.00 | $82.47 |
| 27 | Concrete driveway 6-inch (602.0810) | SY | 1,064 | $62.76 | $65.00 | $59.00 | $58.12 |
| 28 | Concrete driveway hes 6-inch (602.0860) | SY | 20 | $72.82 | $75.00 | $85.00 | $58.76 |
| 29 | Concrete steps (602.1500) | SF | 19 | $68.63 | $100.00 | $90.00 | $84.96 |
| 30 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 1,299 | $92.00 | $94.00 | $92.00 | $92.00 |
| 31 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 63 | $150.00 | $97.00 | $150.00 | $150.00 |
| 32 | Inlet covers type H (611.0624) | EACH | 15 | $1,045.00 | $850.00 | $1,045.00 | $1,045.00 |
| 33 | Inlet covers type H-S (611.0639) | EACH | 24 | $1,045.00 | $835.00 | $1,045.00 | $1,045.00 |
| 34 | Inlet covers type S (611.0651) | EACH | 1 | $1,039.00 | $835.00 | $1,039.00 | $1,039.00 |
| 35 | Inlets 4-FT diameter (611.3004) | EACH | 23 | $2,622.00 | $2,700.00 | $2,622.00 | $2,622.00 |
| 36 | Inlets 2X3-FT (611.3230) | EACH | 17 | $2,144.00 | $2,500.00 | $2,144.00 | $2,144.00 |
| 37 | Adjusting manhole covers (611.8110) | EACH | 11 | $791.00 | $520.00 | $791.00 | $791.00 |
| 38 | Mobilization (619.1000) | EACH | 1 | $84,927 | $195,000 | $305,987 | $282,000 |
| 39 | Dust control surface treatment (623.0200) | SY | 20,400 | $0.01 | $0.01 | $0.20 | $0.01 |
| 40 | Topsoil (625.0100) | SY | 4,710 | $5.05 | $6.00 | $5.05 | $5.05 |
| 41 | Mobilizations erosion control (628.1905) | EACH | 9 | $50.00 | $50.00 | $50.00 | $50.00 |
| 42 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $50.00 | $50.00 | $50.00 | $50.00 |
| 43 | Inlet protection type A (628.7005) | EACH | 51 | $50.00 | $60.00 | $50.00 | $50.00 |
| 44 | Inlet protection type B (628.7010) | EACH | 23 | $50.00 | $60.00 | $50.00 | $50.00 |
| 45 | Inlet protection type C (628.7015) | EACH | 18 | $67.00 | $75.00 | $67.00 | $67.00 |
| 46 | Inlet protection type D (628.7020) | EACH | 40 | $125.00 | $150.00 | $125.00 | $125.00 |
| 47 | Tracking pads (628.7560) | EACH | 6 | $0.01 | $500.00 | $500.00 | $100.00 |
| 48 | Fertilizer type B (629.0210) | CWT | 2.90 | $80.00 | $100.00 | $80.00 | $80.00 |
| 49 | Sod water (631.0300) | MGAL | 184 | $10.00 | $15.00 | $10.00 | $10.00 |
| 50 | Sod lawn (631.1000) | SY | 5,181 | $6.61 | $7.50 | $6.61 | $6.61 |
| 51 | Posts tubular steel 2X2-inch X 16- FT (634.0816) | EACH | 22 | $230.00 | $250.00 | $230.00 | $230.00 |
| 52 | Signs type II reflective H (637.2210) | SF | 123.94 | $22.00 | $25.00 | $22.00 | $22.00 |
| 53 | Removing signs type II (638.2602) | EACH | 12 | $15.00 | $20.00 | $15.00 | $15.00 |
| 54 | Removing small sign supports (638.3000) | EACH | 9 | $15.00 | $20.00 | $15.00 | $15.00 |
| 55 | Field office type B (642.5001) | EACH | 1 | $14,368 | $23,000 | $14,000 | $20,000 |
| 56 | Traffic control drums (643.0300) | DAY | 14,138 | $0.21 | $0.25 | $0.21 | $0.21 |
| 57 | Traffic control barricades type III (643.0420) | DAY | 3,936 | $0.53 | $0.60 | $0.53 | $0.53 |
| 58 | Traffic control warning lights type A (643.0705) | DAY | 9,672 | $0.07 | $0.10 | $0.07 | $0.07 |
| 59 | Traffic control warning lights type C (643.0715) | DAY | 2,720 | $0.18 | $0.20 | $0.18 | $0.18 |
| 60 | Traffic control signs (643.0900) | DAY | 29,597 | $0.18 | $0.20 | $0.18 | $0.18 |
| 61 | Traffic control signs PCMS (643.1050) | DAY | 28 | $36.15 | $40.00 | $36.15 | $36.15 |
| 62 | Temporary marking line paint 4- inch (643.3105) | LF | 1,441 | $0.40 | $0.50 | $0.40 | $0.40 |
| 63 | Temporary marking line removable tape 4-inch (643.3150) | LF | 1,721 | $1.75 | $2.00 | $1.75 | $1.75 |
| 64 | Traffic control (643.5000) | EACH | 1 | $15,682 | $17,000 | $15,682 | $15,682 |
| 65 | Temporary pedestrian surface matting (644.1440) | SF | 175 | $6.29 | $7.00 | $6.29 | $7.00 |
| 66 | Temporary pedestrian curb ramp (644.1601) | DAY | 376 | $4.69 | $5.00 | $4.69 | $5.00 |
| 67 | Temporary pedestrian detectable warning field (644.1605) | SF | 84 | $18.98 | $20.00 | $18.98 | $19.00 |
| 68 | Temporary pedestrian barricade (644.1810) | LF | 650 | $3.22 | $3.50 | $3.22 | $3.22 |
| 69 | Geotextile type SR (645.0135) | SY | 4,230 | $3.12 | $5.00 | $3.15 | $1.90 |
| 70 | Marking line epoxy 4-inch (646.1020) | LF | 13,109 | $0.84 | $1.00 | $0.60 | $0.60 |
| 71 | Marking line epoxy 8-inch (646.3020) | LF | 412 | $1.68 | $1.70 | $0.95 | $0.95 |
| 72 | Marking arrow epoxy (646.5020) | EACH | 18 | $200.00 | $200.00 | $305.00 | $305.00 |
| 73 | Marking word epoxy (646.5120) | EACH | 1 | $250.00 | $250.00 | $330.00 | $330.00 |
| 74 | Marking symbol epoxy (646.5220) | EACH | 12 | $210.00 | $230.00 | $255.00 | $255.00 |
| 75 | Marking stop line epoxy 18-inch (646.6120) | LF | 189 | $10.50 | $11.00 | $14.50 | $14.50 |
| 76 | Marking diagonal epoxy 12-inch (646.7120) | LF | 22 | $10.00 | $11.00 | $11.25 | $11.25 |
| 77 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,405 | $8.85 | $9.30 | $8.50 | $8.50 |
| 78 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 140 | $17.50 | $20.00 | $17.10 | $17.10 |
| 79 | Marking removal line 4-inch (646.9000) | LF | 660 | $1.50 | $2.00 | $1.50 | $1.50 |
| 80 | Construction staking storm sewer (650.4000) | EACH | 40 | $115.00 | $100.00 | $82.00 | $82.00 |
| 81 | Construction staking subgrade (650.4500) | LF | 2,800 | $0.01 | $0.01 | $1.50 | $1.50 |
| 82 | Construction staking concrete pavement (650.7000) | LF | 2,800 | $2.15 | $0.01 | $2.00 | $2.00 |
| 83 | Construction staking electrical installations (project) 01. 2703-09- 71 (650.8501) | EACH | 1 | $1,500.00 | $3,500.00 | $1,850.00 | $1,850.00 |
| 84 | Construction staking curb ramps (650.9000) | EACH | 40 | $125.00 | $150.00 | $129.00 | $129.00 |
| 85 | Construction staking sidewalk (project) 01. 2703-09-71 (650.9500) | EACH | 1 | $2,000.00 | $7,500.00 | $3,450.00 | $3,450.00 |
| 86 | Construction staking supplemental control (project) 01. 2703-09-71 (650.9911) | EACH | 1 | $2,000.00 | $1,500.00 | $2,100.00 | $2,100.00 |
| 87 | Construction staking slope stakes (650.9920) | LF | 2,800 | $0.70 | $1.00 | $0.90 | $0.90 |
| 88 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 5,207 | $9.65 | $10.00 | $9.65 | $9.65 |
| 89 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 794 | $11.74 | $13.00 | $11.74 | $11.74 |
| 90 | Pull boxes steel 24X42-inch (653.0140) | EACH | 22 | $1,201.00 | $1,250.00 | $1,201.00 | $1,201.00 |
| 91 | Removing pull boxes (653.0905) | EACH | 3 | $98.00 | $100.00 | $98.00 | $98.00 |
| 92 | Concrete bases type 5 (654.0105) | EACH | 19 | $1,232.00 | $1,300.00 | $1,232.00 | $1,232.00 |
| 93 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,442 | $1.00 | $1.10 | $1.00 | $1.00 |
| 94 | Electrical wire lighting 10 AWG (655.0615) | LF | 651 | $1.19 | $1.30 | $1.19 | $1.19 |
| 95 | Electrical wire lighting 8 AWG (655.0620) | LF | 18,222 | $1.57 | $1.75 | $1.57 | $1.57 |
| 96 | Electrical wire lighting 4 AWG (655.0630) | LF | 837 | $2.07 | $2.30 | $2.07 | $2.07 |
| 97 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 19 | $663.00 | $700.00 | $663.00 | $663.00 |
| 98 | Poles type 5-aluminum (657.0322) | EACH | 19 | $1,972.00 | $2,000.00 | $1,972.00 | $1,972.00 |
| 99 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 19 | $380.00 | $400.00 | $380.00 | $380.00 |
| 100 | Sawing asphalt (690.0150) | LF | 57 | $1.10 | $2.00 | $1.10 | $1.10 |
| 101 | Sawing concrete (690.0250) | LF | 3,358 | $2.15 | $2.00 | $2.15 | $2.15 |
| 102 | Incentive compressive strength concrete pavement (715.0720) | DOL | 4,140 | $1.00 | $1.00 | $1.00 | $1.00 |
| 103 | Incentive iri ride (740.0440) | DOL | 4,242 | $1.00 | $1.00 | $1.00 | $1.00 |
| 104 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 550 | $5.00 | $5.00 | $5.00 | $5.00 |
| 105 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,800 | $5.00 | $5.00 | $5.00 | $5.00 |
| 106 | Special 01. decorative gravel (SPV.0035) | CY | 2 | $150.00 | $500.00 | $500.00 | $500.00 |
| 107 | Special 02. coloring and stamping concrete custom (SPV.0035) | CY | 2 | $312.75 | $2,100.00 | $1,200.00 | $798.63 |
| 108 | Special 01. sealing manhole openings (SPV.0060) | EACH | 9 | $664.00 | $235.00 | $664.00 | $664.00 |
| 109 | Special 02. storm sewer tap (SPV.0060) | EACH | 16 | $500.00 | $235.00 | $500.00 | $500.00 |
| 110 | Special 03. luminaires utility LED 57 watts (SPV.0060) | EACH | 19 | $345.00 | $350.00 | $345.00 | $345.00 |
| 111 | Special 04. lighting control cabinet modifications (SPV.0060) | EACH | 1 | $2,277.00 | $2,500.00 | $2,277.00 | $2,277.00 |
| 112 | Special 05. maintenance of lighting (SPV.0060) | EACH | 1 | $3,812.00 | $4,500.00 | $3,812.00 | $3,812.00 |
| 113 | Special 06. adjusting sanitary sewer manhole covers (SPV.0060) | EACH | 8 | $790.00 | $520.00 | $790.00 | $790.00 |
| 114 | Special 07. utility line opening (SPV.0060) | EACH | 3 | $265.00 | $1,500.00 | $1,500.00 | $1,000.00 |
| 115 | Special 08. install existing circuit into new pull box (SPV.0060) | EACH | 3 | $355.00 | $400.00 | $355.00 | $355.00 |
| 116 | Special 01. temporary pedestrian barricade move and install (SPV.0090) | LF | 900 | $4.70 | $5.00 | $4.70 | $4.70 |
| 117 | Special 01. salvage and resetting existing bricks (SPV.0165) | SF | 80 | $10.00 | $20.00 | $10.00 | $10.00 |
| 118 | Special 01. concrete pavement hes 7-inch (SPV.0180) | SY | 75 | $87.09 | $63.00 | $65.00 | $85.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.