| 1 | Removing small pipe culverts (203.0100) | EACH | 27 | $150.00 | $325.00 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 893 | $0.01 | $0.10 |
| 3 | Removing asphaltic surface milling (204.0120) | SY | 104,834 | $0.50 | $0.10 |
| 4 | Excavation common (205.0100) | CY | 13,055 | $17.00 | $0.01 |
| 5 | Borrow (208.0100) | CY | 5,175 | $22.75 | $0.01 |
| 6 | Temporary lane shift during culvert work (208.1500.S) | EACH | 10 | $1,040.00 | $17,300 |
| 7 | Backfill granular grade 2 (209.2100) | CY | 375 | $21.00 | $36.50 |
| 8 | Prepare foundation for asphaltic paving (project) 01. 3697-05-70 (211.0101) | EACH | 1 | $1,000.00 | $28,008 |
| 9 | Finishing roadway (project) 01. 3697-05-70 (213.0100) | EACH | 1 | $1,000.00 | $4,738.47 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,210 | $24.50 | $32.50 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 6,560 | $18.50 | $11.50 |
| 12 | Shaping shoulders (305.0500) | STA | 311 | $1.00 | $8.91 |
| 13 | Tack coat (455.0605) | GAL | 6,560 | $2.50 | $2.80 |
| 14 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $780.00 | $3,500.00 |
| 15 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $13,000 | $3,500.00 |
| 16 | Incentive density PWL HMA pavement (460.2005) | DOL | 21,160 | $1.00 | $1.00 |
| 17 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 6,210 | $1.00 | $1.00 |
| 18 | Incentive air voids HMA pavement (460.2010) | DOL | 27,530 | $1.00 | $1.00 |
| 19 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 27,530 | $63.45 | $70.00 |
| 20 | Asphaltic surface (465.0105) | TON | 880 | $85.00 | $82.91 |
| 21 | Asphaltic surface driveways and field entrances (465.0120) | TON | 465 | $163.00 | $108.14 |
| 22 | Cleaning culvert pipes (520.8700) | EACH | 5 | $950.00 | $950.00 |
| 23 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 30 | $185.00 | $410.00 |
| 24 | Apron endwalls for culvert pipe steel 21-inch (521.1021) | EACH | 4 | $240.00 | $539.00 |
| 25 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 16 | $252.00 | $617.00 |
| 26 | Apron endwalls for culvert pipe steel 30-inch (521.1030) | EACH | 6 | $451.50 | $1,840.00 |
| 27 | Apron endwalls for culvert pipe steel 36-inch (521.1036) | EACH | 2 | $695.35 | $1,200.00 |
| 28 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 403 | $97.80 | $96.50 |
| 29 | Culvert pipe corrugated steel 21- inch (521.3121) | LF | 40 | $153.26 | $106.00 |
| 30 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 637 | $151.40 | $343.00 |
| 31 | Culvert pipe corrugated steel 30- inch (521.3130) | LF | 268 | $290.00 | $381.00 |
| 32 | Culvert pipe corrugated steel 36- inch (521.3136) | LF | 138 | $411.75 | $446.00 |
| 33 | Adjusting steel plate beam guard (614.0400) | LF | 725 | $12.00 | $12.00 |
| 34 | Replacing guardrail posts and blocks (614.0950) | EACH | 10 | $115.00 | $115.00 |
| 35 | Replacing guardrail rail and hardware (614.0951) | LF | 50 | $20.00 | $20.00 |
| 36 | Replacing guardrail reflectors (614.0952) | EACH | 10 | $15.00 | $15.00 |
| 37 | Mobilization (619.1000) | EACH | 1 | $9,000.00 | $50,000 |
| 38 | Topsoil (625.0100) | SY | 480 | $15.00 | $24.50 |
| 39 | Silt fence (628.1504) | LF | 2,750 | $2.75 | $2.75 |
| 40 | Silt fence maintenance (628.1520) | LF | 2,750 | $0.01 | $0.01 |
| 41 | Mobilizations erosion control (628.1905) | EACH | 2 | $100.00 | $100.00 |
| 42 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $100.00 |
| 43 | Erosion mat urban class I type B (628.2008) | SY | 480 | $3.00 | $3.00 |
| 44 | Culvert pipe checks (628.7555) | EACH | 39 | $25.00 | $25.00 |
| 45 | Fertilizer type A (629.0205) | CWT | 2 | $200.00 | $200.00 |
| 46 | Seeding mixture no. 20 (630.0120) | LB | 35 | $20.00 | $20.00 |
| 47 | Seeding temporary (630.0200) | LB | 35 | $10.00 | $10.00 |
| 48 | Markers culvert end (633.5200) | EACH | 26 | $65.00 | $65.00 |
| 49 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 46 | $90.00 | $90.00 |
| 50 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 11 | $95.00 | $95.00 |
| 51 | Signs type II reflective H (637.2210) | SF | 219.77 | $20.00 | $20.00 |
| 52 | Signs type II reflective F (637.2230) | SF | 159.50 | $22.00 | $22.00 |
| 53 | Removing signs type II (638.2602) | EACH | 63 | $30.00 | $30.00 |
| 54 | Removing small sign supports (638.3000) | EACH | 55 | $30.00 | $30.00 |
| 55 | Traffic control signs (643.0900) | DAY | 1,700 | $0.50 | $0.50 |
| 56 | Traffic control (643.5000) | EACH | 1 | $1,700.00 | $1,700.00 |
| 57 | Marking line epoxy 4-inch (646.1020) | LF | 124,200 | $0.35 | $0.35 |
| 58 | Marking stop line epoxy 18-inch (646.6120) | LF | 40 | $12.45 | $12.45 |
| 59 | Locating no-passing zones (648.0100) | MI | 5.88 | $371.00 | $371.00 |
| 60 | Construction staking pipe culverts (650.6000) | EACH | 11 | $150.00 | $200.00 |
| 61 | Construction staking resurfacing reference (650.8000) | LF | 31,030 | $0.20 | $0.12 |
| 62 | Construction staking supplemental control (project) 01. 3697-05-70 (650.9911) | EACH | 1 | $200.00 | $800.00 |
| 63 | Incentive iri ride (740.0440) | DOL | 23,510 | $1.00 | $1.00 |
| 64 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 600 | $5.00 | $5.00 |
| 65 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 |
| 66 | Special 01. proof rolling (SPV.0170) | STA | 311 | $1.00 | $25.90 |