WisDOT contract 20250311031 bid tabulation
Berlin-Oshkosh; Wcl-STH 44 (STH 091, Winnebago County Berlin - Oshkosh). Let by Wisconsin DOT on March 11, 2025, Winnebago. 2 bids received; low bid $9,093,823 by Northeast Asphalt, Inc.
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 96
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northeast Asphalt, Inc | $9,093,823 | Low |
| 2 | Relyco Plus, LLC | $9,523,953 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northeast Asphalt, Inc | 2. Relyco Plus, LLC |
|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 34 | $673.09 | $673.09 |
| 2 | Removing structure (structure) 01. sta 650+68 (203.0220) | EACH | 1 | $1,875.00 | $1,875.00 |
| 3 | Removing structure (structure) 02. sta 691+77 (203.0220) | EACH | 1 | $1,875.00 | $1,875.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 920 | $5.00 | $5.00 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 9,730 | $0.75 | $0.75 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 281,000 | $0.75 | $0.75 |
| 7 | Removing curb & gutter (204.0150) | LF | 298 | $6.00 | $6.00 |
| 8 | Excavation common (205.0100) | CY | 11,810 | $17.85 | $17.85 |
| 9 | Temporary lane shift during culvert work (208.1500.S) | EACH | 3 | $5,900.00 | $5,900.00 |
| 10 | Backfill granular grade 2 (209.2100) | CY | 1,180 | $34.66 | $34.66 |
| 11 | Prepare foundation for asphaltic paving (project) 01. 6540-08-71 (211.0101) | EACH | 1 | $92,500 | $92,500 |
| 12 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 1,357 | $65.50 | $65.50 |
| 13 | Finishing roadway (project) 01. 6540-08-71 (213.0100) | EACH | 1 | $2,250.00 | $2,000.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 26,000 | $10.15 | $30.80 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 8,560 | $11.80 | $11.80 |
| 16 | Drilled tie bars (416.0610) | EACH | 15 | $20.00 | $12.12 |
| 17 | Tack coat (455.0605) | GAL | 37,650 | $3.25 | $3.25 |
| 18 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $2,750.00 | $2,750.00 |
| 19 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 3 | $2,750.00 | $2,750.00 |
| 20 | Incentive density PWL HMA pavement (460.2005) | DOL | 46,650 | $1.00 | $1.00 |
| 21 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 43,390 | $1.00 | $1.00 |
| 22 | Incentive air voids HMA pavement (460.2010) | DOL | 73,010 | $1.00 | $1.00 |
| 23 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 36,410 | $62.50 | $62.50 |
| 24 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 36,600 | $69.50 | $69.50 |
| 25 | Asphaltic surface (465.0105) | TON | 3,130 | $120.00 | $120.00 |
| 26 | Asphaltic surface driveways and field entrances (465.0120) | TON | 106 | $230.00 | $230.00 |
| 27 | Asphaltic rumble strips, shoulder (465.0520) | LF | 127,700 | $0.27 | $0.27 |
| 28 | Asphaltic rumble strips, centerline (465.0560) | LF | 66,600 | $0.27 | $0.27 |
| 29 | Culvert pipe reinforced concrete class III 60-inch (522.0160) | LF | 86 | $457.43 | $457.43 |
| 30 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 516 | $136.31 | $136.31 |
| 31 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 394 | $170.79 | $170.79 |
| 32 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 17 | $1,857.09 | $1,857.09 |
| 33 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 12 | $2,386.25 | $2,386.25 |
| 34 | Apron endwalls for culvert pipe reinforced concrete 60-inch (522.1060) | EACH | 2 | $4,940.80 | $4,940.80 |
| 35 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 38X60-inch (522.2338) | LF | 56 | $364.45 | $364.45 |
| 36 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 43X68-inch (522.2343) | LF | 72 | $431.04 | $431.04 |
| 37 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 58X91-inch (522.2358) | LF | 238 | $759.86 | $759.86 |
| 38 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 402 | $220.80 | $220.80 |
| 39 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429) | LF | 140 | $290.74 | $290.74 |
| 40 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (522.2434) | LF | 168 | $317.53 | $317.53 |
| 41 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 14 | $2,394.75 | $2,394.75 |
| 42 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 4 | $3,382.34 | $3,382.34 |
| 43 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634) | EACH | 6 | $4,023.00 | $4,023.00 |
| 44 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638) | EACH | 6 | $4,781.88 | $4,781.88 |
| 45 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 43X68-inch (522.2643) | EACH | 6 | $5,193.42 | $5,193.42 |
| 46 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 58X91-inch (522.2658) | EACH | 6 | $7,805.60 | $7,805.60 |
| 47 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 298 | $55.00 | $65.00 |
| 48 | Riprap medium (606.0200) | CY | 50 | $157.00 | $157.00 |
| 49 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 18 | $121.24 | $121.24 |
| 50 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 310 | $114.94 | $114.94 |
| 51 | Inlet covers type F (611.0615) | EACH | 2 | $1,635.75 | $1,635.75 |
| 52 | Inlet covers type MS (611.0642) | EACH | 1 | $522.75 | $522.75 |
| 53 | Inlets 4-FT diameter (611.3004) | EACH | 2 | $3,841.06 | $3,841.06 |
| 54 | Inlets median 1 grate (611.3901) | EACH | 1 | $4,346.92 | $4,346.92 |
| 55 | Maintenance and repair of haul roads (project) 01. 6540-08-71 (618.0100) | EACH | 1 | $10.00 | $0.01 |
| 56 | Mobilization (619.1000) | EACH | 1 | $612,500 | $510,500 |
| 57 | Water (624.0100) | MGAL | 480 | $50.00 | $35.00 |
| 58 | Salvaged topsoil (625.0500) | SY | 5,750 | $1.86 | $1.86 |
| 59 | Silt fence (628.1504) | LF | 3,890 | $2.33 | $2.50 |
| 60 | Silt fence maintenance (628.1520) | LF | 3,890 | $0.01 | $0.10 |
| 61 | Mobilizations erosion control (628.1905) | EACH | 5 | $375.00 | $300.00 |
| 62 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $300.00 |
| 63 | Erosion mat urban class I type B (628.2008) | SY | 5,750 | $2.20 | $2.00 |
| 64 | Inlet protection type A (628.7005) | EACH | 1 | $120.00 | $150.00 |
| 65 | Inlet protection type B (628.7010) | EACH | 2 | $75.00 | $50.00 |
| 66 | Temporary ditch checks (628.7504) | LF | 495 | $8.40 | $10.00 |
| 67 | Culvert pipe checks (628.7555) | EACH | 385 | $15.00 | $15.00 |
| 68 | Fertilizer type B (629.0210) | CWT | 5.70 | $90.00 | $90.00 |
| 69 | Seeding mixture no. 30 (630.0130) | LB | 164 | $8.00 | $8.00 |
| 70 | Seed water (630.0500) | MGAL | 205 | $1.00 | $20.00 |
| 71 | Markers culvert end (633.5200) | EACH | 66 | $58.00 | $75.00 |
| 72 | Field office type B (642.5001) | EACH | 1 | $16,500 | $10,000 |
| 73 | Traffic control drums (643.0300) | DAY | 78 | $0.20 | $0.20 |
| 74 | Traffic control barricades type III (643.0420) | DAY | 1,200 | $0.75 | $0.75 |
| 75 | Traffic control warning lights type A (643.0705) | DAY | 1,760 | $0.20 | $0.20 |
| 76 | Traffic control signs (643.0900) | DAY | 7,922 | $0.29 | $0.29 |
| 77 | Traffic control covering signs type II (643.0920) | EACH | 7 | $115.00 | $115.00 |
| 78 | Traffic control signs PCMS (643.1050) | DAY | 28 | $45.00 | $45.00 |
| 79 | Temporary marking line paint 6- inch (643.3165) | LF | 325,695 | $0.25 | $0.25 |
| 80 | Traffic control (643.5000) | EACH | 1 | $18,950 | $18,950 |
| 81 | Geotextile type HR (645.0120) | SY | 165 | $5.00 | $5.00 |
| 82 | Marking line epoxy 4-inch (646.1020) | LF | 162 | $3.00 | $3.00 |
| 83 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 219,770 | $1.21 | $1.21 |
| 84 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 4,595 | $2.49 | $2.49 |
| 85 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $2,830.80 | $2,830.80 |
| 86 | Construction staking storm sewer (650.4000) | EACH | 4 | $41.31 | $85.00 |
| 87 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 298 | $0.65 | $0.70 |
| 88 | Construction staking pipe culverts (650.6000) | EACH | 36 | $106.09 | $85.00 |
| 89 | Construction staking resurfacing reference (650.8000) | LF | 76,801 | $0.08 | $0.07 |
| 90 | Construction staking supplemental control (project) 01. 6540-08-71 (650.9911) | EACH | 1 | $422.81 | $10.00 |
| 91 | Sawing asphalt (690.0150) | LF | 2,509 | $1.39 | $2.25 |
| 92 | Sawing concrete (690.0250) | LF | 15 | $2.00 | $5.00 |
| 93 | Incentive iri ride (740.0440) | DOL | 116,920 | $1.00 | $1.00 |
| 94 | Special 01. foundation backfill (SPV.0035) | CY | 6,145 | $33.46 | $33.46 |
| 95 | Special 01. culvert pipe reinforced concrete horizontal elliptical class HE-IV 38X60-in (SPV.0090) | LF | 128 | $377.64 | $377.64 |
| 96 | Special 02. culvert pipe reinforced concrete horizontal elliptical class HE-IV 43X68-in (SPV.0090) | LF | 120 | $470.83 | $470.83 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.