WisDOT contract 20250311036 bid tabulation
STH 29 - STH 52; CTH N/CTH J Intersection (CTH N, Marathon County STH 29 - STH 52). Let by Wisconsin DOT on March 11, 2025, Marathon. 4 bids received; low bid $255,567 by American Asphalt of Wisconsin.
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 55
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | American Asphalt of Wisconsin | $255,567 | Low |
| 2 | RC Pavers LLC | $298,270 | +17% |
| 3 | Earth, Inc. | $327,148 | +28% |
| 4 | Haas Sons, Inc. | $336,118 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. American Asphalt of Wisconsin | 2. RC Pavers LLC | 3. Earth, Inc. | 4. Haas Sons, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing (item description) .01 removing and salvaging pulverized asphaltic material (204.9180.S) | SY | 4,056 | $3.90 | $1.99 | $3.00 | $5.50 |
| 2 | Excavation common (205.0100) | CY | 905 | $13.15 | $8.65 | $35.00 | $24.00 |
| 3 | Prepare foundation for asphaltic paving (project) .01 9439-02-70 (211.0101) | EACH | 1 | $5,000.00 | $1,500.00 | $10,000 | $6,000.00 |
| 4 | Finishing roadway (project) .01 9439-02-70 (213.0100) | EACH | 1 | $1,320.00 | $5,000.00 | $5,000.00 | $100.00 |
| 5 | Base aggregate dense 3/4-inch (305.0110) | TON | 214 | $25.18 | $22.00 | $32.00 | $32.44 |
| 6 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 757 | $23.03 | $20.00 | $23.40 | $17.04 |
| 7 | Tack coat (455.0605) | GAL | 246 | $4.62 | $8.00 | $5.00 | $4.62 |
| 8 | Incentive density HMA pavement (460.2000) | DOL | 960 | $1.00 | $1.00 | $1.00 | $1.00 |
| 9 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 704 | $81.40 | $100.70 | $83.00 | $81.40 |
| 10 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 501 | $90.90 | $95.10 | $92.00 | $90.90 |
| 11 | Asphaltic flumes (465.0315) | SY | 18 | $61.06 | $80.00 | $66.00 | $61.06 |
| 12 | Concrete curb & gutter 4-inch sloped 36-inch type T (601.0582) | LF | 628 | $30.00 | $30.00 | $26.80 | $30.00 |
| 13 | Concrete safety islands (602.2400) | SF | 444 | $7.75 | $7.75 | $7.60 | $7.75 |
| 14 | Mobilization (619.1000) | EACH | 1 | $12,940 | $47,000 | $40,000 | $27,050 |
| 15 | Concrete median sloped nose (620.0300) | SF | 130 | $12.00 | $12.00 | $14.00 | $12.00 |
| 16 | Water (624.0100) | MGAL | 17.10 | $25.00 | $50.00 | $40.00 | $40.00 |
| 17 | Salvaged topsoil (625.0500) | SY | 1,389 | $3.50 | $2.00 | $5.50 | $5.00 |
| 18 | Mulching (627.0200) | SY | 1,389 | $1.10 | $1.00 | $1.00 | $2.32 |
| 19 | Silt fence (628.1504) | LF | 125 | $4.00 | $2.00 | $5.00 | $0.02 |
| 20 | Silt fence maintenance (628.1520) | LF | 125 | $0.10 | $1.00 | $0.01 | $250.00 |
| 21 | Mobilizations erosion control (628.1905) | EACH | 1 | $100.00 | $300.00 | $500.00 | $100.00 |
| 22 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $300.00 | $200.00 | $10.00 |
| 23 | Temporary ditch checks (628.7504) | LF | 90 | $10.00 | $10.00 | $8.00 | $15.00 |
| 24 | Culvert pipe checks (628.7555) | EACH | 3 | $20.00 | $20.00 | $25.00 | $90.00 |
| 25 | Fertilizer type B (629.0210) | CWT | 0.99 | $100.00 | $150.00 | $200.00 | $8.80 |
| 26 | Seeding mixture no. 30 (630.0130) | LB | 30 | $8.00 | $10.00 | $30.00 | $74.00 |
| 27 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 6 | $130.00 | $100.00 | $100.00 | $195.00 |
| 28 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 4 | $200.00 | $350.00 | $210.00 | $205.00 |
| 29 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 4 | $200.00 | $350.00 | $250.00 | $185.00 |
| 30 | Sign flags permanent type II (637.0620) | EACH | 8 | $250.00 | $100.00 | $300.00 | $22.90 |
| 31 | Signs type II reflective H (637.2210) | SF | 22.50 | $30.00 | $35.00 | $25.00 | $24.80 |
| 32 | Signs type II reflective F (637.2230) | SF | 36 | $30.00 | $35.00 | $30.00 | $170.00 |
| 33 | Moving signs type II (638.2102) | EACH | 6 | $20.00 | $200.00 | $100.00 | $32.00 |
| 34 | Removing signs type II (638.2602) | EACH | 4 | $20.00 | $50.00 | $25.00 | $125.00 |
| 35 | Field office type B (642.5001) | EACH | 1 | $6,000.00 | $10,000 | $6,000.00 | $15,400 |
| 36 | Traffic control drums (643.0300) | DAY | 720 | $1.00 | $1.00 | $1.10 | $1.00 |
| 37 | Traffic control barricades type III (643.0420) | DAY | 360 | $1.00 | $1.00 | $1.10 | $1.00 |
| 38 | Traffic control warning lights type A (643.0705) | DAY | 480 | $0.25 | $0.25 | $0.30 | $0.25 |
| 39 | Traffic control signs (643.0900) | DAY | 5,430 | $0.60 | $0.60 | $0.65 | $0.60 |
| 40 | Traffic control (643.5000) | EACH | 1 | $2,300.00 | $2,300.00 | $5,000.00 | $2,300.00 |
| 41 | Marking line epoxy 6-inch (646.2020) | LF | 2,974 | $1.25 | $0.73 | $1.30 | $1.25 |
| 42 | Marking stop line epoxy 18-inch (646.6120) | LF | 100 | $21.00 | $20.45 | $21.00 | $21.00 |
| 43 | Marking diagonal epoxy 12-inch (646.7120) | LF | 24 | $15.00 | $19.60 | $15.00 | $15.00 |
| 44 | Marking island nose epoxy (646.8220) | EACH | 4 | $350.00 | $378.45 | $350.00 | $350.00 |
| 45 | Construction staking base (650.5000) | LF | 997 | $1.30 | $1.30 | $2.00 | $1.30 |
| 46 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 633 | $1.50 | $1.50 | $1.75 | $1.50 |
| 47 | Construction staking resurfacing reference (650.8000) | LF | 997 | $0.35 | $0.35 | $0.40 | $0.35 |
| 48 | Construction staking supplemental control (project) .01 9439-02-70 (650.9911) | EACH | 1 | $483.50 | $483.50 | $500.00 | $483.50 |
| 49 | Construction staking slope stakes (650.9920) | LF | 997 | $1.35 | $1.35 | $2.00 | $1.35 |
| 50 | Sawing asphalt (690.0150) | LF | 120 | $3.00 | $2.00 | $6.00 | $3.00 |
| 51 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 52 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 |
| 53 | Special .01 stop sign traffic flashing beacon system, solar (SPV.0060) | EACH | 4 | $2,000.00 | $2,175.00 | $2,250.00 | $2,175.00 |
| 54 | Special .02 salvaging stop sign traffic flashing beacon system, solar (SPV.0060) | EACH | 2 | $600.00 | $650.00 | $650.00 | $650.00 |
| 55 | Special .01 ditch cleaning (SPV.0090) | LF | 240 | $7.50 | $20.00 | $35.00 | $16.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.