WisDOT contract 20250311036 bid tabulation

STH 29 - STH 52; CTH N/CTH J Intersection (CTH N, Marathon County STH 29 - STH 52). Let by Wisconsin DOT on March 11, 2025, Marathon. 4 bids received; low bid $255,567 by American Asphalt of Wisconsin.

Owner
Wisconsin DOT
Letting
11 MAR 2025
Pay items
55
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1American Asphalt of Wisconsin$255,567Low
2RC Pavers LLC$298,270+17%
3Earth, Inc.$327,148+28%
4Haas Sons, Inc.$336,118+32%
WisDOT contract 20250311036: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. American Asphalt of Wisconsin2. RC Pavers LLC3. Earth, Inc.4. Haas Sons, Inc.
1Removing (item description) .01 removing and salvaging pulverized asphaltic material (204.9180.S)SY4,056$3.90$1.99$3.00$5.50
2Excavation common (205.0100)CY905$13.15$8.65$35.00$24.00
3Prepare foundation for asphaltic paving (project) .01 9439-02-70 (211.0101)EACH1$5,000.00$1,500.00$10,000$6,000.00
4Finishing roadway (project) .01 9439-02-70 (213.0100)EACH1$1,320.00$5,000.00$5,000.00$100.00
5Base aggregate dense 3/4-inch (305.0110)TON214$25.18$22.00$32.00$32.44
6Base aggregate dense 1 1/4-inch (305.0120)TON757$23.03$20.00$23.40$17.04
7Tack coat (455.0605)GAL246$4.62$8.00$5.00$4.62
8Incentive density HMA pavement (460.2000)DOL960$1.00$1.00$1.00$1.00
9HMA pavement 3 MT 58-28 S (460.6223)TON704$81.40$100.70$83.00$81.40
10HMA pavement 4 MT 58-28 S (460.6224)TON501$90.90$95.10$92.00$90.90
11Asphaltic flumes (465.0315)SY18$61.06$80.00$66.00$61.06
12Concrete curb & gutter 4-inch sloped 36-inch type T (601.0582)LF628$30.00$30.00$26.80$30.00
13Concrete safety islands (602.2400)SF444$7.75$7.75$7.60$7.75
14Mobilization (619.1000)EACH1$12,940$47,000$40,000$27,050
15Concrete median sloped nose (620.0300)SF130$12.00$12.00$14.00$12.00
16Water (624.0100)MGAL17.10$25.00$50.00$40.00$40.00
17Salvaged topsoil (625.0500)SY1,389$3.50$2.00$5.50$5.00
18Mulching (627.0200)SY1,389$1.10$1.00$1.00$2.32
19Silt fence (628.1504)LF125$4.00$2.00$5.00$0.02
20Silt fence maintenance (628.1520)LF125$0.10$1.00$0.01$250.00
21Mobilizations erosion control (628.1905)EACH1$100.00$300.00$500.00$100.00
22Mobilizations emergency erosion control (628.1910)EACH2$100.00$300.00$200.00$10.00
23Temporary ditch checks (628.7504)LF90$10.00$10.00$8.00$15.00
24Culvert pipe checks (628.7555)EACH3$20.00$20.00$25.00$90.00
25Fertilizer type B (629.0210)CWT0.99$100.00$150.00$200.00$8.80
26Seeding mixture no. 30 (630.0130)LB30$8.00$10.00$30.00$74.00
27Posts wood 4X6-inch X 12-FT (634.0612)EACH6$130.00$100.00$100.00$195.00
28Posts tubular steel 2X2-inch X 8-FT (634.0808)EACH4$200.00$350.00$210.00$205.00
29Posts tubular steel 2X2-inch X 12- FT (634.0812)EACH4$200.00$350.00$250.00$185.00
30Sign flags permanent type II (637.0620)EACH8$250.00$100.00$300.00$22.90
31Signs type II reflective H (637.2210)SF22.50$30.00$35.00$25.00$24.80
32Signs type II reflective F (637.2230)SF36$30.00$35.00$30.00$170.00
33Moving signs type II (638.2102)EACH6$20.00$200.00$100.00$32.00
34Removing signs type II (638.2602)EACH4$20.00$50.00$25.00$125.00
35Field office type B (642.5001)EACH1$6,000.00$10,000$6,000.00$15,400
36Traffic control drums (643.0300)DAY720$1.00$1.00$1.10$1.00
37Traffic control barricades type III (643.0420)DAY360$1.00$1.00$1.10$1.00
38Traffic control warning lights type A (643.0705)DAY480$0.25$0.25$0.30$0.25
39Traffic control signs (643.0900)DAY5,430$0.60$0.60$0.65$0.60
40Traffic control (643.5000)EACH1$2,300.00$2,300.00$5,000.00$2,300.00
41Marking line epoxy 6-inch (646.2020)LF2,974$1.25$0.73$1.30$1.25
42Marking stop line epoxy 18-inch (646.6120)LF100$21.00$20.45$21.00$21.00
43Marking diagonal epoxy 12-inch (646.7120)LF24$15.00$19.60$15.00$15.00
44Marking island nose epoxy (646.8220)EACH4$350.00$378.45$350.00$350.00
45Construction staking base (650.5000)LF997$1.30$1.30$2.00$1.30
46Construction staking curb gutter and curb & gutter (650.5500)LF633$1.50$1.50$1.75$1.50
47Construction staking resurfacing reference (650.8000)LF997$0.35$0.35$0.40$0.35
48Construction staking supplemental control (project) .01 9439-02-70 (650.9911)EACH1$483.50$483.50$500.00$483.50
49Construction staking slope stakes (650.9920)LF997$1.35$1.35$2.00$1.35
50Sawing asphalt (690.0150)LF120$3.00$2.00$6.00$3.00
51On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00
52On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00
53Special .01 stop sign traffic flashing beacon system, solar (SPV.0060)EACH4$2,000.00$2,175.00$2,250.00$2,175.00
54Special .02 salvaging stop sign traffic flashing beacon system, solar (SPV.0060)EACH2$600.00$650.00$650.00$650.00
55Special .01 ditch cleaning (SPV.0090)LF240$7.50$20.00$35.00$16.00
WisDOT contract 20250311036: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy