WisDOT contract 20250311046 bid tabulation
C Medford, Ninth Street; Eastview Dr to E Broadway Ave (LOC STR, Taylor County C MEDFORD, NINTH STREET). Let by Wisconsin DOT on March 11, 2025, Taylor. 3 bids received; low bid $292,455 by Haas Sons, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 42
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Haas Sons, Inc. | $292,455 | Low |
| 2 | Pember Companies, Inc. | $325,061 | +11% |
| 3 | American Asphalt of Wisconsin | $343,950 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Haas Sons, Inc. | 2. Pember Companies, Inc. | 3. American Asphalt of Wisconsin |
|---|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 26 | $10.00 | $16.60 | $40.00 |
| 2 | Removing curb & gutter (204.0150) | LF | 2,712 | $3.00 | $4.30 | $2.80 |
| 3 | Excavation common (205.0100) | CY | 873 | $14.00 | $27.00 | $13.00 |
| 4 | Finishing roadway (project) 01. 8890-00-75 (213.0100) | EACH | 1 | $1.00 | $500.00 | $2,500.00 |
| 5 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 160 | $19.59 | $30.00 | $24.21 |
| 6 | Pulverize and relay (325.0100) | SY | 5,523 | $2.00 | $1.55 | $9.45 |
| 7 | Tack coat (455.0605) | GAL | 390 | $5.65 | $6.00 | $5.65 |
| 8 | Incentive density HMA pavement (460.2000) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 9 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 695 | $97.75 | $111.50 | $97.75 |
| 10 | HMA pavement 4 MT 58-34 H (460.6444) | TON | 540 | $100.55 | $105.60 | $100.55 |
| 11 | Asphaltic surface (465.0105) | TON | 2.40 | $220.15 | $386.50 | $220.15 |
| 12 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 2,712 | $15.15 | $15.15 | $16.15 |
| 13 | Concrete driveway 6-inch (602.0810) | SY | 60 | $66.50 | $66.50 | $102.19 |
| 14 | Salvaged inlet covers (611.9710) | EACH | 4 | $250.00 | $590.00 | $500.00 |
| 15 | Maintenance and repair of haul roads (project) 01. 8890-00-75 (618.0100) | EACH | 1 | $100.00 | $500.00 | $500.00 |
| 16 | Mobilization (619.1000) | EACH | 1 | $40,010 | $42,865 | $42,650 |
| 17 | Water (624.0100) | MGAL | 55 | $40.00 | $66.00 | $20.00 |
| 18 | Topsoil (625.0100) | SY | 1,225 | $9.00 | $8.70 | $9.75 |
| 19 | Silt fence (628.1504) | LF | 2,090 | $1.75 | $2.45 | $1.75 |
| 20 | Silt fence maintenance (628.1520) | LF | 2,090 | $0.03 | $0.01 | $0.03 |
| 21 | Mobilizations erosion control (628.1905) | EACH | 2 | $103.00 | $320.00 | $103.00 |
| 22 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $113.00 | $100.00 | $113.00 |
| 23 | Erosion mat urban class I type B (628.2008) | SY | 1,225 | $2.60 | $2.35 | $2.60 |
| 24 | Inlet protection type A (628.7005) | EACH | 5 | $100.00 | $130.00 | $100.00 |
| 25 | Inlet protection type C (628.7015) | EACH | 5 | $50.00 | $75.00 | $50.00 |
| 26 | Fertilizer type B (629.0210) | CWT | 0.77 | $500.00 | $85.00 | $500.00 |
| 27 | Seeding mixture no. 40 (630.0140) | LB | 55 | $10.00 | $14.90 | $10.00 |
| 28 | Seed water (630.0500) | MGAL | 28 | $5.00 | $1.00 | $5.00 |
| 29 | Field office type B (642.5001) | EACH | 1 | $12,000 | $8,000.00 | $10,000 |
| 30 | Traffic control drums (643.0300) | DAY | 650 | $0.35 | $0.40 | $0.35 |
| 31 | Traffic control barricades type III (643.0420) | DAY | 650 | $0.40 | $0.40 | $0.40 |
| 32 | Traffic control warning lights type A (643.0705) | DAY | 890 | $0.05 | $0.05 | $0.05 |
| 33 | Traffic control signs (643.0900) | DAY | 405 | $0.40 | $0.40 | $0.40 |
| 34 | Traffic control (643.5000) | EACH | 1 | $1,050.00 | $2,600.00 | $1,050.00 |
| 35 | Construction staking base (650.5000) | LF | 1,350 | $1.00 | $1.00 | $1.00 |
| 36 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 2,712 | $1.00 | $1.00 | $1.00 |
| 37 | Construction staking supplemental control (project) 01. 8890-00-75 (650.9911) | EACH | 1 | $1,000.00 | $1,050.00 | $1,000.00 |
| 38 | Construction staking slope stakes (650.9920) | LF | 1,350 | $1.00 | $1.00 | $1.00 |
| 39 | Sawing asphalt (690.0150) | LF | 143 | $2.00 | $2.45 | $6.35 |
| 40 | Sawing concrete (690.0250) | LF | 58 | $3.00 | $3.90 | $10.10 |
| 41 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 42 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.