WisDOT contract 20250408004 bid tabulation

City of Sun Prairie, N Bird Street; STH 19 to USH 151 (LOC STR, Dane County City of Sun Prairie, N Bird Street). Let by Wisconsin DOT on April 8, 2025, Dane. 4 bids received; low bid $714,606 by Parisi Construction, LLC.

Owner
Wisconsin DOT
Letting
08 APR 2025
Pay items
94
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Parisi Construction, LLC$714,606Low
2Rock Road Companies, Inc.$721,255+1.0%
3Lalonde Contractors Incorporated$791,355+11%
4Zignego Company, Inc.$864,242+21%
WisDOT contract 20250408004: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Parisi Construction, LLC2. Rock Road Companies, Inc.3. Lalonde Contractors Incorporated4. Zignego Company, Inc.
1Removing concrete pavement (204.0100)SY300$16.00$15.25$16.22$10.00
2Removing asphaltic surface (204.0110)SY6,610$5.00$4.17$3.90$2.49
3Removing curb & gutter (204.0150)LF1,789$8.10$11.85$7.43$10.00
4Removing concrete sidewalk (204.0155)SY725$22.50$19.54$11.14$10.00
5Removing manholes (204.0210)EACH1$700.00$532.78$1,250.00$750.00
6Removing inlets (204.0220)EACH6$700.00$532.78$925.00$450.00
7Removing storm sewer (size) 01. 12-inch (204.0245)LF85$31.25$27.62$30.00$30.00
8Removing storm sewer (size) 02. 15-inch (204.0245)LF8$41.25$52.17$32.50$30.00
9Removing storm sewer (size) 03. 18-inch (204.0245)LF16$83.00$36.68$35.00$30.00
10Excavation common (205.0100)CY520$50.00$32.52$52.76$30.00
11Prepare foundation for asphaltic paving (project) 01. 3996-00-35 (211.0101)EACH1$12,000$19,080$8,983.95$11,000
12Finishing roadway (project) 01. 3996-00-35 (213.0100)EACH1$590.00$4,325.28$2,264.00$1,000.00
13Base aggregate dense 1 1/4-inch (305.0120)TON1,300$26.75$21.76$29.16$30.00
14Select crushed material (312.0110)TON260$21.25$23.02$35.98$50.00
15Concrete pavement 8-inch (415.0080)SY50$180.00$98.00$180.85$102.79
16Tack coat (455.0605)GAL280$0.11$3.36$3.00$3.00
17Incentive density HMA pavement (460.2000)DOL1,000$1.00$1.00$1.00$1.00
18HMA pavement 3 MT 58-28 S (460.6223)TON930$80.00$84.51$68.00$68.00
19HMA pavement 4 MT 58-28 S (460.6224)TON620$85.00$89.19$73.50$73.50
20Concrete collars for pipe (520.8000)EACH4$560.00$1,229.49$1,500.00$750.00
21Concrete curb & gutter 30-inch type A (601.0409)LF25$52.00$50.00$55.19$81.71
22Concrete curb & gutter 30-inch type D (601.0411)LF1,315$28.50$24.50$34.51$22.33
23Concrete sidewalk 4-inch (602.0405)SF9,975$7.00$4.30$8.25$4.92
24Concrete sidewalk 6-inch (602.0415)SF3,800$13.25$7.00$9.80$7.02
25Curb ramp detectable warning field natural patina (602.0515)SF100$50.00$45.00$41.98$47.43
26Concrete driveway 6-inch (602.0810)SY400$75.00$63.00$85.50$63.36
27Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF66$110.00$153.74$200.00$200.00
28Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF28$110.00$173.73$225.00$200.00
29Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF27$140.00$180.40$250.00$200.00
30Reconstructing manholes (611.0420)EACH1$2,700.00$4,740.50$6,500.00$1,500.00
31Manhole covers type J (611.0530)EACH1$910.00$1,285.64$975.00$1,000.00
32Catch basins 4-FT diameter (611.1004)EACH1$3,100.00$4,314.80$4,575.00$4,500.00
33Manholes 4-FT diameter (611.2004)EACH1$3,100.00$4,314.80$4,575.00$6,500.00
34Inlets 2.5X3-FT (611.3253)EACH4$2,800.00$4,180.72$3,295.00$4,000.00
35Adjusting manhole covers (611.8110)EACH7$550.00$1,364.27$635.00$650.00
36Mobilization (619.1000)EACH1$5,000.00$47,489$56,609$220,000
37Water (624.0100)MGAL32$35.75$0.01$58.14$200.00
38Topsoil (625.0100)SY1,085$9.80$17.51$4.95$5.00
39Mobilizations erosion control (628.1905)EACH6$110.00$250.00$250.00$250.00
40Mobilizations emergency erosion control (628.1910)EACH3$110.00$300.00$250.00$300.00
41Erosion mat urban class I type A (628.2006)SY1,085$3.20$1.80$1.85$1.80
42Inlet protection type C (628.7015)EACH17$80.00$60.00$55.00$60.00
43Fertilizer type B (629.0210)CWT0.70$210.00$300.00$95.00$300.00
44Seeding mixture no. 40 (630.0140)LB20$19.00$35.00$18.00$35.00
45Seed water (630.0500)MGAL64$21.25$25.00$50.00$25.00
46Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH8$100.00$200.00$195.00$200.00
47Posts tubular steel 2X2-inch X 16- FT (634.0816)EACH2$160.00$250.00$205.00$250.00
48Signs type II reflective F (637.2230)SF49.50$37.25$26.00$24.00$26.00
49Moving signs type II (638.2102)EACH16$210.00$75.00$110.00$75.00
50Removing signs type II (638.2602)EACH1$37.25$50.00$30.00$50.00
51Removing small sign supports (638.3000)EACH1$37.25$50.00$30.00$50.00
52Moving small sign supports (638.4000)EACH4$110.00$75.00$80.00$75.00
53Field office type C (642.5201)EACH1$8,100.00$9,000.00$12,012$30,000
54Traffic control drums (643.0300)DAY3,057$0.25$0.23$0.36$0.23
55Traffic control barricades type III (643.0420)DAY423$1.10$1.00$0.70$1.00
56Traffic control warning lights type A (643.0705)DAY504$0.25$0.25$0.16$0.25
57Traffic control signs (643.0900)DAY2,874$0.20$0.20$0.39$0.20
58Traffic control signs fixed message (643.1000)SF66$16.50$15.50$16.32$15.50
59Traffic control signs PCMS (643.1050)DAY28$37.25$35.00$36.53$35.00
60Temporary marking line paint 4- inch (643.3105)LF2,800$0.20$0.21$1.05$0.21
61Temporary marking line removable tape 4-inch (643.3150)LF175$1.90$1.75$3.65$1.75
62Traffic control (643.5000)EACH1$10,500$9,910.00$5,739.66$9,910.00
63Temporary pedestrian surface matting (644.1440)SF300$2.40$2.25$3.90$2.25
64Temporary pedestrian barricade (644.1810)LF250$4.20$4.00$2.14$4.00
65Marking line epoxy 4-inch (646.1020)LF6,160$0.40$0.38$2.15$0.38
66Marking line epoxy 8-inch (646.3020)LF295$1.00$0.97$4.30$0.97
67Marking arrow epoxy (646.5020)EACH4$340.00$322.07$125.00$322.07
68Marking stop line epoxy 18-inch (646.6120)LF220$14.50$13.71$9.65$13.71
69Marking diagonal epoxy 12-inch (646.7120)LF160$14.00$13.16$6.45$13.16
70Marking removal line 4-inch (646.9000)LF3,620$0.20$0.20$0.11$0.20
71Marking removal line 8-inch (646.9100)LF250$0.95$0.90$0.75$0.90
72Marking removal line wide (646.9200)LF50$3.70$3.50$0.80$3.50
73Construction staking storm sewer (650.4000)EACH6$160.00$150.00$200.00$150.00
74Construction staking base (650.5000)LF2,774$1.30$1.25$1.00$1.25
75Construction staking curb gutter and curb & gutter (650.5500)LF1,920$1.60$1.50$2.00$1.50
76Construction staking resurfacing reference (650.8000)LF1,387$0.35$0.35$0.20$0.35
77Construction staking curb ramps (650.9000)EACH10$210.00$200.00$300.00$200.00
78Construction staking sidewalk (project) 01. 3996-00-35 (650.9500)EACH1$1,600.00$1,500.00$1,000.00$1,500.00
79Construction staking supplemental control (project) 01. 3996-00-35 (650.9911)EACH1$1,300.00$1,200.00$2,000.00$1,200.00
80Sawing asphalt (690.0150)LF1,610$1.90$1.49$1.25$1.49
81Sawing concrete (690.0250)LF275$2.80$2.75$2.25$2.75
82Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00$1.00$1.00
83On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00$5.00$5.00
84On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00
85Special 01. watermain granular backfill special (SPV.0035)CY26$28.25$25.94$50.00$100.00
86Special 01. inlet covers type D (SPV.0060)EACH6$1,800.00$1,818.60$1,525.00$1,000.00
87Special 02. adjusting water valve boxes (SPV.0060)EACH21$360.00$336.14$385.00$650.00
88Special 03. remove existing hydrant (SPV.0060)EACH3$1,300.00$849.10$1,565.00$1,000.00
89Special 04. bend 45-degree 6-inch (SPV.0060)EACH2$860.00$995.71$835.00$1,000.00
90Special 05. fire hydrant (SPV.0060)EACH3$7,400.00$11,380$7,750.00$8,500.00
91Special 06. connect to existing watermain (SPV.0060)EACH3$3,200.00$1,605.95$3,250.00$1,500.00
92Special 01. remove existing watermain (SPV.0090)LF41$53.00$100.83$50.00$50.00
93Special 02. ductile watermain 6- inch (SPV.0090)LF29$140.00$190.98$305.00$500.00
94Special 03. concrete curb & gutter 36-inch special (SPV.0090)LF580$50.00$36.60$56.62$32.73
WisDOT contract 20250408004: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy