WisDOT contract 20250408004 bid tabulation
City of Sun Prairie, N Bird Street; STH 19 to USH 151 (LOC STR, Dane County City of Sun Prairie, N Bird Street). Let by Wisconsin DOT on April 8, 2025, Dane. 4 bids received; low bid $714,606 by Parisi Construction, LLC.
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 94
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Parisi Construction, LLC | $714,606 | Low |
| 2 | Rock Road Companies, Inc. | $721,255 | +1.0% |
| 3 | Lalonde Contractors Incorporated | $791,355 | +11% |
| 4 | Zignego Company, Inc. | $864,242 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Parisi Construction, LLC | 2. Rock Road Companies, Inc. | 3. Lalonde Contractors Incorporated | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 300 | $16.00 | $15.25 | $16.22 | $10.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 6,610 | $5.00 | $4.17 | $3.90 | $2.49 |
| 3 | Removing curb & gutter (204.0150) | LF | 1,789 | $8.10 | $11.85 | $7.43 | $10.00 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 725 | $22.50 | $19.54 | $11.14 | $10.00 |
| 5 | Removing manholes (204.0210) | EACH | 1 | $700.00 | $532.78 | $1,250.00 | $750.00 |
| 6 | Removing inlets (204.0220) | EACH | 6 | $700.00 | $532.78 | $925.00 | $450.00 |
| 7 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 85 | $31.25 | $27.62 | $30.00 | $30.00 |
| 8 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 8 | $41.25 | $52.17 | $32.50 | $30.00 |
| 9 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 16 | $83.00 | $36.68 | $35.00 | $30.00 |
| 10 | Excavation common (205.0100) | CY | 520 | $50.00 | $32.52 | $52.76 | $30.00 |
| 11 | Prepare foundation for asphaltic paving (project) 01. 3996-00-35 (211.0101) | EACH | 1 | $12,000 | $19,080 | $8,983.95 | $11,000 |
| 12 | Finishing roadway (project) 01. 3996-00-35 (213.0100) | EACH | 1 | $590.00 | $4,325.28 | $2,264.00 | $1,000.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,300 | $26.75 | $21.76 | $29.16 | $30.00 |
| 14 | Select crushed material (312.0110) | TON | 260 | $21.25 | $23.02 | $35.98 | $50.00 |
| 15 | Concrete pavement 8-inch (415.0080) | SY | 50 | $180.00 | $98.00 | $180.85 | $102.79 |
| 16 | Tack coat (455.0605) | GAL | 280 | $0.11 | $3.36 | $3.00 | $3.00 |
| 17 | Incentive density HMA pavement (460.2000) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 18 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 930 | $80.00 | $84.51 | $68.00 | $68.00 |
| 19 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 620 | $85.00 | $89.19 | $73.50 | $73.50 |
| 20 | Concrete collars for pipe (520.8000) | EACH | 4 | $560.00 | $1,229.49 | $1,500.00 | $750.00 |
| 21 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 25 | $52.00 | $50.00 | $55.19 | $81.71 |
| 22 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,315 | $28.50 | $24.50 | $34.51 | $22.33 |
| 23 | Concrete sidewalk 4-inch (602.0405) | SF | 9,975 | $7.00 | $4.30 | $8.25 | $4.92 |
| 24 | Concrete sidewalk 6-inch (602.0415) | SF | 3,800 | $13.25 | $7.00 | $9.80 | $7.02 |
| 25 | Curb ramp detectable warning field natural patina (602.0515) | SF | 100 | $50.00 | $45.00 | $41.98 | $47.43 |
| 26 | Concrete driveway 6-inch (602.0810) | SY | 400 | $75.00 | $63.00 | $85.50 | $63.36 |
| 27 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 66 | $110.00 | $153.74 | $200.00 | $200.00 |
| 28 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 28 | $110.00 | $173.73 | $225.00 | $200.00 |
| 29 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 27 | $140.00 | $180.40 | $250.00 | $200.00 |
| 30 | Reconstructing manholes (611.0420) | EACH | 1 | $2,700.00 | $4,740.50 | $6,500.00 | $1,500.00 |
| 31 | Manhole covers type J (611.0530) | EACH | 1 | $910.00 | $1,285.64 | $975.00 | $1,000.00 |
| 32 | Catch basins 4-FT diameter (611.1004) | EACH | 1 | $3,100.00 | $4,314.80 | $4,575.00 | $4,500.00 |
| 33 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $3,100.00 | $4,314.80 | $4,575.00 | $6,500.00 |
| 34 | Inlets 2.5X3-FT (611.3253) | EACH | 4 | $2,800.00 | $4,180.72 | $3,295.00 | $4,000.00 |
| 35 | Adjusting manhole covers (611.8110) | EACH | 7 | $550.00 | $1,364.27 | $635.00 | $650.00 |
| 36 | Mobilization (619.1000) | EACH | 1 | $5,000.00 | $47,489 | $56,609 | $220,000 |
| 37 | Water (624.0100) | MGAL | 32 | $35.75 | $0.01 | $58.14 | $200.00 |
| 38 | Topsoil (625.0100) | SY | 1,085 | $9.80 | $17.51 | $4.95 | $5.00 |
| 39 | Mobilizations erosion control (628.1905) | EACH | 6 | $110.00 | $250.00 | $250.00 | $250.00 |
| 40 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $110.00 | $300.00 | $250.00 | $300.00 |
| 41 | Erosion mat urban class I type A (628.2006) | SY | 1,085 | $3.20 | $1.80 | $1.85 | $1.80 |
| 42 | Inlet protection type C (628.7015) | EACH | 17 | $80.00 | $60.00 | $55.00 | $60.00 |
| 43 | Fertilizer type B (629.0210) | CWT | 0.70 | $210.00 | $300.00 | $95.00 | $300.00 |
| 44 | Seeding mixture no. 40 (630.0140) | LB | 20 | $19.00 | $35.00 | $18.00 | $35.00 |
| 45 | Seed water (630.0500) | MGAL | 64 | $21.25 | $25.00 | $50.00 | $25.00 |
| 46 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 8 | $100.00 | $200.00 | $195.00 | $200.00 |
| 47 | Posts tubular steel 2X2-inch X 16- FT (634.0816) | EACH | 2 | $160.00 | $250.00 | $205.00 | $250.00 |
| 48 | Signs type II reflective F (637.2230) | SF | 49.50 | $37.25 | $26.00 | $24.00 | $26.00 |
| 49 | Moving signs type II (638.2102) | EACH | 16 | $210.00 | $75.00 | $110.00 | $75.00 |
| 50 | Removing signs type II (638.2602) | EACH | 1 | $37.25 | $50.00 | $30.00 | $50.00 |
| 51 | Removing small sign supports (638.3000) | EACH | 1 | $37.25 | $50.00 | $30.00 | $50.00 |
| 52 | Moving small sign supports (638.4000) | EACH | 4 | $110.00 | $75.00 | $80.00 | $75.00 |
| 53 | Field office type C (642.5201) | EACH | 1 | $8,100.00 | $9,000.00 | $12,012 | $30,000 |
| 54 | Traffic control drums (643.0300) | DAY | 3,057 | $0.25 | $0.23 | $0.36 | $0.23 |
| 55 | Traffic control barricades type III (643.0420) | DAY | 423 | $1.10 | $1.00 | $0.70 | $1.00 |
| 56 | Traffic control warning lights type A (643.0705) | DAY | 504 | $0.25 | $0.25 | $0.16 | $0.25 |
| 57 | Traffic control signs (643.0900) | DAY | 2,874 | $0.20 | $0.20 | $0.39 | $0.20 |
| 58 | Traffic control signs fixed message (643.1000) | SF | 66 | $16.50 | $15.50 | $16.32 | $15.50 |
| 59 | Traffic control signs PCMS (643.1050) | DAY | 28 | $37.25 | $35.00 | $36.53 | $35.00 |
| 60 | Temporary marking line paint 4- inch (643.3105) | LF | 2,800 | $0.20 | $0.21 | $1.05 | $0.21 |
| 61 | Temporary marking line removable tape 4-inch (643.3150) | LF | 175 | $1.90 | $1.75 | $3.65 | $1.75 |
| 62 | Traffic control (643.5000) | EACH | 1 | $10,500 | $9,910.00 | $5,739.66 | $9,910.00 |
| 63 | Temporary pedestrian surface matting (644.1440) | SF | 300 | $2.40 | $2.25 | $3.90 | $2.25 |
| 64 | Temporary pedestrian barricade (644.1810) | LF | 250 | $4.20 | $4.00 | $2.14 | $4.00 |
| 65 | Marking line epoxy 4-inch (646.1020) | LF | 6,160 | $0.40 | $0.38 | $2.15 | $0.38 |
| 66 | Marking line epoxy 8-inch (646.3020) | LF | 295 | $1.00 | $0.97 | $4.30 | $0.97 |
| 67 | Marking arrow epoxy (646.5020) | EACH | 4 | $340.00 | $322.07 | $125.00 | $322.07 |
| 68 | Marking stop line epoxy 18-inch (646.6120) | LF | 220 | $14.50 | $13.71 | $9.65 | $13.71 |
| 69 | Marking diagonal epoxy 12-inch (646.7120) | LF | 160 | $14.00 | $13.16 | $6.45 | $13.16 |
| 70 | Marking removal line 4-inch (646.9000) | LF | 3,620 | $0.20 | $0.20 | $0.11 | $0.20 |
| 71 | Marking removal line 8-inch (646.9100) | LF | 250 | $0.95 | $0.90 | $0.75 | $0.90 |
| 72 | Marking removal line wide (646.9200) | LF | 50 | $3.70 | $3.50 | $0.80 | $3.50 |
| 73 | Construction staking storm sewer (650.4000) | EACH | 6 | $160.00 | $150.00 | $200.00 | $150.00 |
| 74 | Construction staking base (650.5000) | LF | 2,774 | $1.30 | $1.25 | $1.00 | $1.25 |
| 75 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,920 | $1.60 | $1.50 | $2.00 | $1.50 |
| 76 | Construction staking resurfacing reference (650.8000) | LF | 1,387 | $0.35 | $0.35 | $0.20 | $0.35 |
| 77 | Construction staking curb ramps (650.9000) | EACH | 10 | $210.00 | $200.00 | $300.00 | $200.00 |
| 78 | Construction staking sidewalk (project) 01. 3996-00-35 (650.9500) | EACH | 1 | $1,600.00 | $1,500.00 | $1,000.00 | $1,500.00 |
| 79 | Construction staking supplemental control (project) 01. 3996-00-35 (650.9911) | EACH | 1 | $1,300.00 | $1,200.00 | $2,000.00 | $1,200.00 |
| 80 | Sawing asphalt (690.0150) | LF | 1,610 | $1.90 | $1.49 | $1.25 | $1.49 |
| 81 | Sawing concrete (690.0250) | LF | 275 | $2.80 | $2.75 | $2.25 | $2.75 |
| 82 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 83 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 |
| 84 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 |
| 85 | Special 01. watermain granular backfill special (SPV.0035) | CY | 26 | $28.25 | $25.94 | $50.00 | $100.00 |
| 86 | Special 01. inlet covers type D (SPV.0060) | EACH | 6 | $1,800.00 | $1,818.60 | $1,525.00 | $1,000.00 |
| 87 | Special 02. adjusting water valve boxes (SPV.0060) | EACH | 21 | $360.00 | $336.14 | $385.00 | $650.00 |
| 88 | Special 03. remove existing hydrant (SPV.0060) | EACH | 3 | $1,300.00 | $849.10 | $1,565.00 | $1,000.00 |
| 89 | Special 04. bend 45-degree 6-inch (SPV.0060) | EACH | 2 | $860.00 | $995.71 | $835.00 | $1,000.00 |
| 90 | Special 05. fire hydrant (SPV.0060) | EACH | 3 | $7,400.00 | $11,380 | $7,750.00 | $8,500.00 |
| 91 | Special 06. connect to existing watermain (SPV.0060) | EACH | 3 | $3,200.00 | $1,605.95 | $3,250.00 | $1,500.00 |
| 92 | Special 01. remove existing watermain (SPV.0090) | LF | 41 | $53.00 | $100.83 | $50.00 | $50.00 |
| 93 | Special 02. ductile watermain 6- inch (SPV.0090) | LF | 29 | $140.00 | $190.98 | $305.00 | $500.00 |
| 94 | Special 03. concrete curb & gutter 36-inch special (SPV.0090) | LF | 580 | $50.00 | $36.60 | $56.62 | $32.73 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.