| 1 | Grubbing (201.0220) | ID | 30 | $60.00 | $80.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 410 | $10.00 | $21.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 350 | $7.00 | $0.01 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 920 | $0.01 | $5.29 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 235,400 | $0.01 | $0.50 |
| 6 | Removing curb & gutter (204.0150) | LF | 1,310 | $6.25 | $11.75 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 850 | $8.00 | $28.25 |
| 8 | Prepare foundation for asphaltic paving (project) 01. 5606-03-70 (211.0101) | EACH | 1 | $100.00 | $0.01 |
| 9 | Finishing roadway (project) 01. 5606-03-70 (213.0100) | EACH | 1 | $100.00 | $4,863.82 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 5,360 | $20.00 | $21.65 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 100 | $20.00 | $20.08 |
| 12 | Tack coat (455.0605) | GAL | 16,513 | $0.01 | $2.79 |
| 13 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $100.00 | $3,500.00 |
| 14 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $100.00 | $3,500.00 |
| 15 | Incentive density HMA pavement (460.2000) | DOL | 2,130 | $1.00 | $1.00 |
| 16 | Incentive density PWL HMA pavement (460.2005) | DOL | 18,460 | $1.00 | $1.00 |
| 17 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 12,360 | $1.00 | $1.00 |
| 18 | Incentive air voids HMA pavement (460.2010) | DOL | 23,460 | $1.00 | $1.00 |
| 19 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 23,460 | $76.30 | $70.54 |
| 20 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 3,330 | $76.30 | $77.22 |
| 21 | Asphaltic surface (465.0105) | TON | 1,417 | $95.00 | $84.90 |
| 22 | Asphaltic surface driveways and field entrances (465.0120) | TON | 29 | $485.00 | $203.89 |
| 23 | Asphaltic flumes (465.0315) | SY | 18 | $58.00 | $50.41 |
| 24 | Asphaltic rumble strips, centerline sinusoidal (465.0565) | LF | 49,329 | $0.30 | $0.22 |
| 25 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,310 | $44.30 | $44.30 |
| 26 | Concrete curb pedestrian (601.0600) | LF | 141 | $50.00 | $50.00 |
| 27 | Concrete sidewalk 5-inch (602.0410) | SF | 6,020 | $9.30 | $9.30 |
| 28 | Concrete sidewalk 6-inch (602.0415) | SF | 2,770 | $9.75 | $9.75 |
| 29 | Curb ramp detectable warning field yellow (602.0505) | SF | 480 | $45.00 | $45.00 |
| 30 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 16 | $65.00 | $65.00 |
| 31 | Concrete driveway 6-inch (602.0810) | SY | 76 | $73.35 | $73.35 |
| 32 | Concrete steps (602.1500) | SF | 25 | $75.00 | $75.00 |
| 33 | Adjusting inlet covers (611.8115) | EACH | 4 | $950.00 | $452.94 |
| 34 | Adjusting steel plate beam guard (614.0400) | LF | 250 | $15.00 | $15.00 |
| 35 | Replacing guardrail posts and blocks (614.0950) | EACH | 28 | $120.00 | $120.00 |
| 36 | Replacing guardrail reflectors (614.0952) | EACH | 36 | $25.00 | $25.00 |
| 37 | Maintenance and repair of haul roads (project) 01. 5606-03-70 (618.0100) | EACH | 1 | $100.00 | $0.01 |
| 38 | Mobilization (619.1000) | EACH | 1 | $15,700 | $75,000 |
| 39 | Water (624.0100) | MGAL | 55 | $0.01 | $0.01 |
| 40 | Topsoil (625.0100) | SY | 2,110 | $10.00 | $0.01 |
| 41 | Mobilizations erosion control (628.1905) | EACH | 26 | $100.00 | $100.00 |
| 42 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $100.00 | $100.00 |
| 43 | Erosion mat urban class I type A (628.2006) | SY | 2,110 | $2.25 | $2.25 |
| 44 | Inlet protection type C (628.7015) | EACH | 22 | $75.00 | $75.00 |
| 45 | Fertilizer type B (629.0210) | CWT | 2 | $200.00 | $200.00 |
| 46 | Seeding mixture no. 40 (630.0140) | LB | 39 | $20.00 | $20.00 |
| 47 | Seed water (630.0500) | MGAL | 48 | $20.00 | $20.00 |
| 48 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 1 | $95.00 | $95.00 |
| 49 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 4 | $100.00 | $100.00 |
| 50 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 4 | $110.00 | $110.00 |
| 51 | Moving signs type II (638.2102) | EACH | 24 | $200.00 | $200.00 |
| 52 | Removing small sign supports (638.3000) | EACH | 9 | $40.00 | $40.00 |
| 53 | Field office type B (642.5001) | EACH | 1 | $3,000.00 | $5,600.00 |
| 54 | Traffic control drums (643.0300) | DAY | 6,118 | $0.18 | $0.17 |
| 55 | Traffic control signs (643.0900) | DAY | 9,314 | $0.28 | $0.26 |
| 56 | Traffic control signs PCMS (643.1050) | DAY | 14 | $50.00 | $45.00 |
| 57 | Temporary marking line paint 6- inch (643.3165) | LF | 70,278 | $0.22 | $0.22 |
| 58 | Temporary marking line epoxy 6- inch (643.3170) | LF | 70,278 | $0.39 | $0.39 |
| 59 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 2,085 | $2.88 | $2.15 |
| 60 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 1,899 | $2.72 | $2.90 |
| 61 | Traffic control (643.5000) | EACH | 1 | $8,432.44 | $21,250 |
| 62 | Temporary pedestrian surface asphalt (644.1410) | SF | 49 | $90.00 | $8.20 |
| 63 | Temporary pedestrian surface plate (644.1430) | SF | 1,107 | $11.45 | $5.25 |
| 64 | Temporary pedestrian surface matting (644.1440) | SF | 1,502 | $2.00 | $2.25 |
| 65 | Temporary pedestrian curb ramp (644.1601) | DAY | 560 | $13.00 | $12.50 |
| 66 | Temporary pedestrian detectable warning field (644.1605) | SF | 496 | $6.34 | $4.50 |
| 67 | Temporary pedestrian barricade (644.1810) | LF | 6,318 | $2.00 | $2.75 |
| 68 | Marking line epoxy 4-inch (646.1020) | LF | 1,153 | $0.50 | $0.50 |
| 69 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 222,385 | $1.19 | $1.19 |
| 70 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 227 | $2.43 | $2.43 |
| 71 | Marking arrow epoxy (646.5020) | EACH | 2 | $284.50 | $284.50 |
| 72 | Marking stop line epoxy 18-inch (646.6120) | LF | 323 | $12.11 | $12.11 |
| 73 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 2,174 | $11.24 | $11.24 |
| 74 | Marking curb epoxy (646.8120) | LF | 73 | $5.72 | $5.72 |
| 75 | Marking island nose epoxy (646.8220) | EACH | 3 | $224.30 | $224.30 |
| 76 | Marking parking stall epoxy (646.8320) | LF | 35 | $15.00 | $15.00 |
| 77 | Locating no-passing zones (648.0100) | MI | 13 | $360.98 | $360.98 |
| 78 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,310 | $1.78 | $1.00 |
| 79 | Construction staking resurfacing reference (650.8000) | LF | 68,378 | $0.20 | $0.09 |
| 80 | Construction staking curb ramps (650.9000) | EACH | 49 | $248.58 | $1.00 |
| 81 | Construction staking sidewalk (project) 01. 5606-03-70 (650.9500) | EACH | 1 | $1,885.00 | $250.00 |
| 82 | Construction staking supplemental control (project) 01. 5606-03-70 (650.9911) | EACH | 1 | $580.00 | $300.00 |
| 83 | Sawing asphalt (690.0150) | LF | 2,794 | $1.49 | $1.75 |
| 84 | Sawing concrete (690.0250) | LF | 722 | $2.65 | $2.35 |
| 85 | Incentive iri ride (740.0440) | DOL | 51,592 | $1.00 | $1.00 |
| 86 | Special 01. landmark reference monuments (SPV.0060) | EACH | 8 | $108.75 | $1,250.00 |
| 87 | Special 02. removing bus stop pads (SPV.0060) | EACH | 5 | $750.00 | $500.00 |
| 88 | Special 03. adjusting valve boxes (SPV.0060) | EACH | 6 | $850.00 | $349.75 |
| 89 | Special 04. adjusting curb stop boxes (SPV.0060) | EACH | 2 | $0.01 | $244.70 |
| 90 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 11,903 | $0.01 | $2.98 |