WisDOT contract 20250408010 bid tabulation
2703-05-71. Let by Wisconsin DOT on April 8, 2025, Racine. 2 bids received; low bid $1,044,834 by Zenith Tech., Inc. - Waukesha.
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 91
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zenith Tech., Inc. - Waukesha | $1,044,834 | Low |
| 2 | Lunda Construction Company | $1,221,130 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zenith Tech., Inc. - Waukesha | 2. Lunda Construction Company |
|---|---|---|---|---|---|
| 1 | Removing structure (structure) 02. B-51-0067 (203.0220) | EACH | 1 | $50,000 | $90,000 |
| 2 | Debris containment over waterway (structure) 01. B-51-0064 (203.0335) | EACH | 1 | $1.00 | $100.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 874 | $6.00 | $6.00 |
| 4 | Removing curb & gutter (204.0150) | LF | 70 | $6.00 | $6.00 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 31 | $10.00 | $10.00 |
| 6 | Excavation common (205.0100) | CY | 521 | $18.00 | $18.00 |
| 7 | Excavation for structures bridges (structure) 02. B-51-0067 (206.1001) | EACH | 1 | $2,000.00 | $1,500.00 |
| 8 | Backfill controlled low strength (209.0200.S) | CY | 8 | $400.00 | $225.00 |
| 9 | Finishing roadway (project) 01. 2703-02-72 (213.0100) | EACH | 1 | $500.00 | $1.00 |
| 10 | Finishing roadway (project) 01. 2703-05-71 (213.0100) | EACH | 1 | $500.00 | $1.00 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 589 | $21.00 | $21.00 |
| 12 | Concrete pavement 8-inch (415.0080) | SY | 633 | $75.00 | $75.00 |
| 13 | Concrete pavement approach slab (415.0410) | SY | 149 | $170.00 | $170.00 |
| 14 | Concrete pavement joint filling (415.4100) | SY | 874 | $8.25 | $8.25 |
| 15 | Drilled dowel bars (416.0620) | EACH | 143 | $18.00 | $18.00 |
| 16 | Tack coat (455.0605) | GAL | 9 | $2.70 | $10.00 |
| 17 | Incentive density HMA pavement (460.2000) | DOL | 30 | $1.00 | $1.00 |
| 18 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 27 | $295.00 | $160.00 |
| 19 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 18 | $295.00 | $160.00 |
| 20 | Concrete masonry bridges (502.0100) | CY | 6 | $4,000.00 | $3,000.00 |
| 21 | Expansion device (502.3101) | LF | 112 | $400.00 | $425.00 |
| 22 | Protective surface treatment (502.3200) | SY | 2,337 | $4.00 | $6.00 |
| 23 | Pigmented surface sealer reseal (502.3205) | SY | 281 | $20.00 | $12.00 |
| 24 | Protective surface treatment reseal (502.3215) | SY | 588 | $12.00 | $11.00 |
| 25 | Adhesive anchors 1 1/4-inch (502.4110) | EACH | 28 | $210.00 | $28.00 |
| 26 | Adhesive anchors no. 4 bar (502.4204) | EACH | 32 | $26.00 | $17.00 |
| 27 | Adhesive anchors no. 5 bar (502.4205) | EACH | 118 | $30.00 | $18.00 |
| 28 | Bar steel reinforcement HS structures (505.0400) | LB | 2,480 | $2.48 | $3.50 |
| 29 | Bar steel reinforcement HS coated structures (505.0600) | LB | 2,210 | $2.94 | $3.60 |
| 30 | Bearing assemblies expansion (structure) 01. B-51-0064 (506.6000) | EACH | 14 | $2,300.00 | $2,650.00 |
| 31 | Removing bearings (structure) 01. B-51-0064 (506.7050.S) | EACH | 14 | $1,200.00 | $1,375.00 |
| 32 | Preparation decks type 1 (509.0301) | SY | 53 | $185.00 | $195.00 |
| 33 | Preparation decks type 2 (509.0302) | SY | 34 | $200.00 | $205.00 |
| 34 | Cleaning decks (509.0500) | SY | 2,287 | $25.00 | $24.00 |
| 35 | Joint repair (509.1000) | SY | 49 | $1,300.00 | $2,200.00 |
| 36 | Curb repair (509.1200) | LF | 12 | $100.00 | $115.00 |
| 37 | Concrete surface repair (509.1500) | SF | 23 | $240.00 | $195.00 |
| 38 | Full-depth deck repair (509.2000) | SY | 19 | $1,800.00 | $950.00 |
| 39 | Concrete masonry overlay decks (509.2500) | CY | 167 | $930.00 | $1,750.00 |
| 40 | Preparation and coating of top flanges (structure) 01. B-51-0064 (517.0901.S) | EACH | 1 | $15,000 | $1,575.00 |
| 41 | Structure repainting recycled abrasive (structure) 01. B-51-0064 (517.1801.S) | EACH | 1 | $50,000 | $51,840 |
| 42 | Negative pressure containment and collection of waste materials (structure) 01. B-51-0064 (517.4501.S) | EACH | 1 | $10,000 | $24,300 |
| 43 | Portable decontamination facility (517.6001.S) | EACH | 1 | $1,000.00 | $500.00 |
| 44 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 332 | $58.00 | $58.00 |
| 45 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 70 | $58.00 | $58.00 |
| 46 | Concrete sidewalk 5-inch (602.0410) | SF | 279 | $15.00 | $15.00 |
| 47 | Reconstructing manholes (611.0420) | EACH | 1 | $1,500.00 | $1,500.00 |
| 48 | Manhole covers type J (611.0530) | EACH | 1 | $700.00 | $700.00 |
| 49 | Adjusting manhole covers (611.8110) | EACH | 1 | $600.00 | $600.00 |
| 50 | Adjusting inlet covers (611.8115) | EACH | 4 | $600.00 | $600.00 |
| 51 | Cover plates temporary (611.8120.S) | EACH | 4 | $300.00 | $300.00 |
| 52 | Mobilization (619.1000) | EACH | 1 | $161,000 | $144,106 |
| 53 | Water (624.0100) | MGAL | 6 | $30.00 | $5.00 |
| 54 | Inlet protection type B (628.7010) | EACH | 6 | $80.00 | $75.00 |
| 55 | Inlet protection type D (628.7020) | EACH | 5 | $140.00 | $75.00 |
| 56 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 2 | $295.00 | $350.00 |
| 57 | Signs type II reflective H (637.2210) | SF | 45 | $40.00 | $40.00 |
| 58 | Field office type B (642.5001) | EACH | 1 | $8,000.00 | $4,000.00 |
| 59 | Traffic control drums (643.0300) | DAY | 238 | $0.25 | $1.36 |
| 60 | Traffic control barricades type III (643.0420) | DAY | 2,132 | $0.55 | $0.81 |
| 61 | Traffic control warning lights type A (643.0705) | DAY | 4,264 | $0.18 | $0.12 |
| 62 | Traffic control signs (643.0900) | DAY | 9,258 | $0.20 | $0.32 |
| 63 | Traffic control (643.5000) | EACH | 1 | $18,000 | $6,202.26 |
| 64 | Marking line epoxy 4-inch (646.1020) | LF | 9,375 | $0.43 | $0.90 |
| 65 | Marking line epoxy 8-inch (646.3020) | LF | 178 | $2.00 | $1.80 |
| 66 | Marking arrow epoxy (646.5020) | EACH | 4 | $360.00 | $200.00 |
| 67 | Marking symbol epoxy (646.5220) | EACH | 11 | $347.00 | $275.00 |
| 68 | Marking stop line epoxy 18-inch (646.6120) | LF | 71 | $15.30 | $13.50 |
| 69 | Marking diagonal epoxy 12-inch (646.7120) | LF | 900 | $14.70 | $9.00 |
| 70 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 327 | $14.20 | $10.50 |
| 71 | Marking removal line 4-inch (646.9000) | LF | 174 | $1.50 | $4.00 |
| 72 | Marking removal line wide (646.9200) | LF | 49 | $5.00 | $6.00 |
| 73 | Construction staking subgrade (650.4500) | LF | 201 | $3.61 | $5.00 |
| 74 | Construction staking base (650.5000) | LF | 50 | $11.60 | $10.00 |
| 75 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 70 | $8.29 | $10.00 |
| 76 | Construction staking structure layout (structure) 01. B-51-0064 (650.6501) | EACH | 1 | $0.01 | $3,000.00 |
| 77 | Construction staking structure layout (structure) 02. B-51-0067 (650.6501) | EACH | 1 | $0.01 | $3,000.00 |
| 78 | Construction staking concrete pavement (650.7000) | LF | 151 | $8.65 | $7.00 |
| 79 | Construction staking sidewalk (project) 01. 2703-05-71 (650.9500) | EACH | 1 | $580.00 | $1,500.00 |
| 80 | Construction staking supplemental control (project) 01. 2703-05-71 (650.9911) | EACH | 1 | $435.00 | $1,600.00 |
| 81 | Construction staking supplemental control (project) 01. 2703-05-72 (650.9911) | EACH | 1 | $435.00 | $1,600.00 |
| 82 | Sawing concrete (690.0250) | LF | 202 | $2.50 | $2.35 |
| 83 | Incentive strength concrete structures (715.0502) | DOL | 500 | $1.00 | $1.00 |
| 84 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,000 | $1.00 | $1.00 |
| 85 | Maintaining bird deterrent system (station) 01. 26+43 (999.2005.S) | EACH | 1 | $500.00 | $0.01 |
| 86 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 900 | $5.00 | $5.00 |
| 87 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 400 | $5.00 | $5.00 |
| 88 | Special 01. floor drain type GC grate casting (SPV.0060) | EACH | 1 | $3,500.00 | $750.00 |
| 89 | Special 02. adjust sanitary manhole with internal/external seal (SPV.0060) | EACH | 2 | $2,590.00 | $2,300.00 |
| 90 | Special 01. removing parapet artwork (SPV.0165) | SF | 1,936 | $5.00 | $6.50 |
| 91 | Special 01. abutment seat cleaning and sealing (SPV.0180) | SY | 42 | $70.00 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.