WisDOT contract 20250408011 bid tabulation

V Rochester CTH A; Intersection With CTH J (CTH J, Racine County V Rochester - CTH A Intersection). Let by Wisconsin DOT on April 8, 2025, Racine. 6 bids received; low bid $2,097,599 by Musson Bros., Inc..

Owner
Wisconsin DOT
Letting
08 APR 2025
Pay items
127
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Musson Bros., Inc.$2,097,599Low
2Willkomm Excav. & Grading$2,179,167+4.0%
3Wanasek, the Corp.$2,189,189+4.0%
4A.W. Oakes & Son, Inc.$2,318,713+11%
5James Peterson Sons, Inc.$2,378,229+13%
6Michels Road & Stone, Inc.$2,416,322+15%
WisDOT contract 20250408011: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Musson Bros., Inc.2. Willkomm Excav. & Grading3. Wanasek, the Corp.4. A.W. Oakes & Son, Inc.5. James Peterson Sons, Inc.6. Michels Road & Stone, Inc.
1Grubbing (201.0205)STA17$265.00$276.47$270.00$300.00$265.00$265.00
2Removing small pipe culverts (203.0100)EACH15$321.65$508.08$480.00$368.00$500.00$1,214.00
3Removing asphaltic surface milling (204.0120)SY1,020$5.60$5.84$5.70$6.00$5.60$5.60
4Removing guardrail (204.0165)LF820$5.00$2.87$5.00$5.00$5.00$5.00
5Removing fence (204.0170)LF1,260$10.00$2.40$3.25$10.00$10.00$10.00
6Removing utility poles (204.0205)EACH1$500.00$532.05$114.00$1,000.00$1,500.00$600.00
7Removing catch basins (204.0215)EACH1$430.31$966.08$543.00$260.00$500.00$862.00
8Excavation common (205.0100)CY26,590$9.31$12.60$9.50$11.77$15.62$12.60
9Finishing roadway (project) 01. 2814-03-70 (213.0100)EACH1$500.00$3,330.29$3,790.00$4,000.00$3,000.00$5,500.00
10Base aggregate dense 3/4-inch (305.0110)TON370$26.86$59.90$49.50$25.72$41.48$41.50
11Base aggregate dense 1 1/4-inch (305.0120)TON10,400$12.69$16.03$15.70$17.23$15.47$14.70
12Base aggregate dense 3-inch (305.0130)TON13,950$0.01$14.86$16.00$21.20$21.31$15.30
13Select crushed material (312.0110)TON10,500$21.82$15.59$21.00$19.49$20.99$25.90
14Coloring concrete wisdot red (405.0100)CY108$266.37$277.90$271.00$200.00$266.37$266.37
15Concrete truck apron 12-inch (415.2010)SY554$92.08$96.07$94.00$87.50$92.08$92.08
16Tack coat (455.0605)GAL771$2.00$2.09$2.00$2.00$2.00$2.00
17Incentive density HMA pavement (460.2000)DOL2,050$1.00$1.00$1.00$1.00$1.00$1.00
18HMA pavement 3 LT 58-28 S (460.5223)TON1,960$73.45$76.63$74.80$75.00$73.45$73.45
19HMA pavement 4 LT 58-28 S (460.5224)TON1,240$73.45$76.63$74.80$75.00$73.45$73.45
20Asphaltic surface driveways and field entrances (465.0120)TON70$130.00$135.60$133.00$150.00$130.00$130.00
21Asphaltic flumes (465.0315)SY119$36.00$37.56$37.00$40.00$36.00$36.00
22Apron endwalls for culvert pipe 24- inch (520.1024)EACH4$806.79$1,377.14$810.00$1,376.00$450.00$1,780.00
23Culvert pipe class IV 24-inch (520.4124)LF208$87.42$114.76$87.00$94.00$95.00$130.00
24Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH2$266.63$188.84$213.00$401.00$300.00$387.00
25Apron endwalls for culvert pipe steel 15-inch (521.1015)EACH6$287.75$213.87$218.00$428.00$300.00$411.00
26Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH12$368.55$238.91$247.00$464.00$350.00$435.00
27Culvert pipe corrugated steel 15- inch (521.3115)LF120$83.26$81.38$72.00$57.00$60.00$82.00
28Culvert pipe corrugated steel 18- inch (521.3118)LF222$95.92$81.38$78.00$65.00$70.00$71.00
29Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH1$1,068.15$927.48$635.00$670.00$1,400.00$1,535.00
30Culvert pipe salvaged 12-inch (524.0112)LF28$69.12$73.03$75.00$93.00$60.00$71.00
31Concrete curb & gutter 18-inch type A (601.0405)LF174$23.28$24.29$23.70$35.75$23.28$23.28
32Concrete curb & gutter 30-inch type D (601.0411)LF1,321$22.43$23.40$22.85$25.00$22.43$22.43
33Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413)LF91$29.83$31.12$31.00$50.00$29.83$29.83
34Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF1,586$23.82$24.85$24.25$24.45$23.82$23.82
35Concrete sidewalk 4-inch (602.0405)SF8,530$4.61$4.81$4.70$6.00$4.61$4.61
36Riprap medium (606.0200)CY5$303.56$258.73$142.00$120.00$265.00$230.00
37Riprap heavy (606.0300)CY83$132.75$186.75$106.00$137.00$122.50$194.00
38Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF50$83.45$109.54$79.00$90.60$95.00$99.00
39Inlet covers type T (611.0652)EACH1$1,329.22$1,000.51$990.00$1,264.00$1,000.00$1,250.00
40Inlets 2X2.5-FT (611.3225)EACH1$1,747.70$2,979.63$2,150.00$1,557.00$2,650.00$1,917.00
41Pipe underdrain 6-inch (612.0106)LF158$15.89$41.73$23.00$13.00$15.00$9.00
42Drain tile exploration (612.0700)LF400$3.57$40.78$14.00$2.00$15.00$15.00
43MGS guardrail 3 (614.2300)LF904$30.00$31.09$30.50$30.00$30.00$30.00
44MGS guardrail short radius (614.2350)LF13$46.00$41.52$47.00$50.00$46.00$46.00
45MGS guardrail terminal eat (614.2610)EACH5$5,000.00$4,392.23$5,090.00$5,000.00$5,000.00$5,000.00
46MGS guardrail terminal type 2 (614.2620)EACH1$4,000.00$4,381.80$4,072.00$4,000.00$4,000.00$4,000.00
47MGS guardrail short radius terminal (614.2630)EACH1$3,500.00$4,068.81$3,563.00$3,500.00$3,500.00$3,500.00
48Fencing small animal (616.0120.S)LF3,200$22.00$43.82$23.00$25.00$22.00$22.00
49Maintenance and repair of haul roads (project) 01. 2814-03-70 (618.0100)EACH1$1.00$737.17$1,475.00$0.01$100.00$0.01
50Mobilization (619.1000)EACH1$380,000$40,410$173,035$146,500$132,850$243,378
51Concrete median sloped nose (620.0300)SF387$13.87$14.47$14.00$15.00$13.87$13.87
52Water (624.0100)MGAL210$0.01$23.89$18.00$41.00$44.00$60.00
53Topsoil (625.0100)SY3,040$0.01$5.08$3.80$0.01$2.99$3.70
54Salvaged topsoil (625.0500)SY15,100$1.57$2.42$1.90$2.30$1.99$2.40
55Silt fence (628.1504)LF176$10.00$5.22$4.00$4.00$4.00$4.00
56Silt fence maintenance (628.1520)LF176$1.00$0.01$1.00$1.00$1.00$1.00
57Silt fence heavy duty (628.1530.S)LF1,720$10.00$13.68$10.00$10.00$10.00$10.00
58Silt fence heavy duty maintenance (628.1535.S)LF1,720$1.00$0.01$1.00$1.00$1.00$1.00
59Mobilizations erosion control (628.1905)EACH6$500.00$52.17$510.00$500.00$500.00$500.00
60Mobilizations emergency erosion control (628.1910)EACH4$250.00$2.09$255.00$250.00$250.00$250.00
61Erosion mat urban class I type A (628.2006)SY15,100$2.25$2.09$2.30$2.50$2.25$2.25
62Erosion mat urban class I type B (628.2008)SY3,060$2.25$2.09$2.30$2.50$2.25$2.25
63Inlet protection type A (628.7005)EACH1$200.00$156.49$204.00$200.00$200.00$200.00
64Inlet protection type D (628.7020)EACH1$200.00$156.49$204.00$200.00$200.00$200.00
65Temporary ditch checks (628.7504)LF251$12.00$8.35$12.00$15.00$12.00$12.00
66Culvert pipe checks (628.7555)EACH29$30.00$18.78$31.00$30.00$30.00$30.00
67Tracking pads (628.7560)EACH4$500.00$1,493.99$3,210.00$0.01$500.00$500.00
68Seeding mixture no. 30 (630.0130)LB114$30.00$9.39$31.00$30.00$30.00$30.00
69Seeding mixture no. 60 (630.0160)LB18$75.00$9.39$77.00$75.00$75.00$75.00
70Seeding temporary (630.0200)LB397$6.00$3.55$6.00$6.00$6.00$6.00
71Seed water (630.0500)MGAL400$10.00$5.22$10.00$10.00$10.00$10.00
72Sod water (631.0300)MGAL1$100.00$5.22$102.00$100.00$100.00$100.00
73Sod erosion control (631.1100)SY25$25.00$15.65$26.00$25.00$25.00$25.00
74Markers culvert end (633.5200)EACH25$85.00$72.72$87.00$85.00$85.00$85.00
75Posts wood 4X6-inch X 14-FT (634.0614)EACH2$150.00$156.50$153.00$150.00$150.00$150.00
76Posts wood 4X6-inch X 16-FT (634.0616)EACH36$165.00$125.19$168.00$170.00$165.00$165.00
77Posts wood 4X6-inch X 18-FT (634.0618)EACH10$185.00$135.63$189.00$190.00$185.00$185.00
78Posts wood 4X6-inch X 20-FT (634.0620)EACH10$215.00$156.49$219.00$220.00$215.00$215.00
79Posts wood 4X6-inch X 22-FT (634.0622)EACH12$225.00$177.36$229.00$230.00$225.00$225.00
80Signs type II reflective H (637.2210)SF528$34.00$24.10$35.00$35.00$34.00$34.00
81Signs type II reflective F (637.2230)SF161$34.00$24.10$35.00$35.00$34.00$34.00
82Moving signs type II (638.2102)EACH2$50.00$83.47$51.00$50.00$50.00$50.00
83Removing signs type II (638.2602)EACH52$50.00$15.65$51.00$50.00$50.00$50.00
84Removing small sign supports (638.3000)EACH38$100.00$18.78$102.00$100.00$100.00$100.00
85Field office type B (642.5001)EACH1$8,000.00$9,911.21$8,800.00$15,000$17,000$13,500
86Traffic control drums (643.0300)DAY1,110$0.25$0.26$0.25$0.30$0.25$0.25
87Traffic control barricades type III (643.0420)DAY888$0.65$0.68$3.05$3.00$3.00$3.00
88Traffic control signs (643.0900)DAY32,750$0.25$0.26$0.15$0.20$0.15$0.15
89Traffic control signs PCMS (643.1050)DAY28$35.00$36.52$36.00$40.00$35.00$35.00
90Traffic control (643.5000)EACH1$8,660.00$9,034.85$8,400.00$9,000.00$8,250.00$8,250.00
91Geotextile type HR (645.0120)SY138$3.29$10.04$3.00$5.00$10.00$7.00
92Geotextile type sas (645.0140)SY6,980$0.89$1.17$1.50$2.00$2.25$2.60
93Marking line epoxy 4-inch (646.1020)LF7,890$1.22$1.27$0.45$0.50$0.42$0.42
94Marking line epoxy 8-inch (646.3020)LF192$2.44$2.55$1.55$1.50$1.50$1.50
95Marking dotted extension epoxy 18-inch (646.6320)LF78$19.75$20.60$15.00$15.00$14.65$14.65
96Marking diagonal epoxy 12-inch (646.7120)LF321$13.15$13.72$15.00$15.00$14.50$14.50
97Marking curb epoxy (646.8120)LF281$8.25$8.61$7.00$10.00$7.00$7.00
98Marking island nose epoxy (646.8220)EACH6$250.00$260.82$285.00$300.00$280.00$280.00
99Construction staking storm sewer (650.4000)EACH2$105.00$245.17$107.00$500.00$105.00$250.00
100Construction staking subgrade (650.4500)LF2,955$0.01$1.56$0.05$0.01$0.01$0.01
101Construction staking base (650.5000)LF2,955$1.75$1.77$1.80$0.01$1.75$1.50
102Construction staking curb gutter and curb & gutter (650.5500)LF3,434$2.50$1.15$2.55$1.00$2.50$1.75
103Construction staking pipe culverts (650.6000)EACH12$110.00$110.07$112.00$150.00$110.00$250.00
104Construction staking electrical installations (project) 01. 2814-03- 70 (650.8501)EACH1$840.00$1,314.54$855.00$2,000.00$840.00$2,000.00
105Construction staking sidewalk (project) 01. 2814-03-70 (650.9500)EACH1$1,200.00$1,512.77$1,225.00$0.01$1,200.00$1,500.00
106Construction staking supplemental control (project) 01. 2814-03-70 (650.9911)EACH1$1,400.00$1,356.27$1,425.00$5,000.00$1,400.00$1,600.00
107Construction staking slope stakes (650.9920)LF2,955$0.50$0.78$0.55$1.00$0.50$1.30
108Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,983$9.82$10.25$10.00$10.00$9.82$9.82
109Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF434$13.46$14.04$13.70$14.00$13.46$13.46
110Pull boxes steel 24X42-inch (653.0140)EACH8$1,482.75$1,546.93$1,510.00$1,500.00$1,482.75$1,482.75
111Concrete bases type 5 (654.0105)EACH12$1,120.79$1,169.30$1,140.00$1,200.00$1,120.79$1,120.79
112Concrete control cabinet bases type L24 (654.0224)EACH1$1,507.71$1,572.98$1,535.00$1,550.00$1,507.71$1,507.71
113Electrical wire lighting 12 AWG (655.0610)LF1,548$0.93$0.97$1.00$1.00$0.93$0.93
114Electrical wire lighting 8 AWG (655.0620)LF10,128$1.27$1.32$1.30$1.30$1.27$1.27
115Electrical service meter breaker pedestal (location) 01. 1127+93.50,72.61'LT (656.0201)EACH1$1,427.36$1,489.14$1,450.00$1,500.00$1,427.36$1,427.36
116Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH12$658.41$686.91$670.00$700.00$658.41$658.41
117Poles type 5-aluminum (657.0322)EACH12$2,049.78$2,138.51$2,090.00$2,050.00$2,049.78$2,049.78
118Luminaire arms single member 4- inch clamp 8-FT (657.0614)EACH12$293.23$305.92$300.00$300.00$293.23$293.23
119Luminaires utility LED A (659.1115)EACH12$402.91$420.35$410.00$425.00$402.91$402.91
120Lighting control cabinets 120/240 24-inch (659.2124)EACH1$8,992.99$9,382.26$9,155.00$9,000.00$8,992.99$8,992.99
121Sawing asphalt (690.0150)LF750$1.20$2.03$2.00$2.00$1.20$1.69
122Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00$1.00$1.00$1.00$1.00
123Incentive iri ride (740.0440)DOL960$1.00$1.00$1.00$1.00$1.00$1.00
124On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS800$5.00$5.00$5.00$5.00$5.00$5.00
125On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,280$5.00$5.00$5.00$5.00$5.00$5.00
126Special 01. silt fence turtle exclusion barrier (SPV.0090)LF3,040$10.00$12.52$10.00$12.00$10.00$10.00
127Special 02. concrete curb and gutter 3-inch sloped 36-inch, type T (SPV.0090)LF262$25.17$26.26$26.00$40.00$25.17$25.17
WisDOT contract 20250408011: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy