| 1 | Removing concrete pavement (204.0100) | SY | 512 | $8.08 | $10.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 1,463 | $4.88 | $10.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 743 | $19.01 | $22.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 34,879 | $2.62 | $6.50 |
| 5 | Removing curb & gutter (204.0150) | LF | 5,862 | $5.55 | $10.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 1,066 | $6.55 | $7.00 |
| 7 | Removing manholes (204.0210) | EACH | 1 | $600.00 | $1,025.00 |
| 8 | Removing inlets (204.0220) | EACH | 2 | $600.00 | $500.00 |
| 9 | Finishing roadway (project) 01. 1175-21-70 (213.0100) | EACH | 1 | $562.50 | $8,500.00 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 50 | $84.51 | $85.00 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 380 | $28.39 | $40.00 |
| 12 | Shaping shoulders (305.0500) | STA | 86 | $136.45 | $60.00 |
| 13 | Coloring concrete wisdot red (405.0100) | CY | 24 | $100.12 | $105.85 |
| 14 | Tack coat (455.0605) | GAL | 2,980 | $3.19 | $5.00 |
| 15 | Incentive density HMA pavement (460.2000) | DOL | 5,140 | $1.00 | $1.00 |
| 16 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 3,847 | $81.79 | $101.50 |
| 17 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 5,310 | $94.42 | $113.50 |
| 18 | Asphaltic surface driveways and field entrances (465.0120) | TON | 13 | $246.19 | $475.00 |
| 19 | Cleaning concrete surfaces (509.0400.S) | SY | 62 | $77.42 | $85.16 |
| 20 | Concrete surface repair (509.1500) | SF | 3 | $80.00 | $880.00 |
| 21 | Epoxy injection crack repair (509.9025.S) | LF | 33 | $193.94 | $213.33 |
| 22 | Concrete staining (structure) 01. retaining wall (517.1010.S) | SF | 551 | $11.11 | $12.22 |
| 23 | Concrete collars for pipe (520.8000) | EACH | 6 | $500.00 | $590.00 |
| 24 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 6,100 | $19.14 | $19.44 |
| 25 | Concrete curb pedestrian (601.0600) | LF | 218 | $39.68 | $45.19 |
| 26 | Concrete sidewalk 6-inch (602.0415) | SF | 10,331 | $11.49 | $11.97 |
| 27 | Curb ramp detectable warning field yellow (602.0505) | SF | 430 | $60.35 | $60.35 |
| 28 | Concrete driveway 6-inch (602.0810) | SY | 540 | $82.41 | $75.74 |
| 29 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $3,950.00 | $4,200.00 |
| 30 | Inlets 2X3-FT (611.3230) | EACH | 2 | $2,600.00 | $2,550.00 |
| 31 | Adjusting inlet covers (611.8115) | EACH | 32 | $850.00 | $635.00 |
| 32 | Pipe underdrain 6-inch (612.0106) | LF | 1,926 | $13.72 | $21.00 |
| 33 | Maintenance and repair of haul roads (project) 01. 1175-21-70 (618.0100) | EACH | 1 | $1.00 | $1.00 |
| 34 | Mobilization (619.1000) | EACH | 1 | $7,169.08 | $322,000 |
| 35 | Water (624.0100) | MGAL | 10 | $25.00 | $80.00 |
| 36 | Topsoil (625.0100) | SY | 2,255 | $10.50 | $2.00 |
| 37 | Mobilizations erosion control (628.1905) | EACH | 4 | $250.00 | $300.00 |
| 38 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $200.00 | $300.00 |
| 39 | Erosion mat urban class I type B (628.2008) | SY | 2,255 | $2.10 | $1.95 |
| 40 | Inlet protection type A (628.7005) | EACH | 32 | $110.00 | $150.00 |
| 41 | Inlet protection type C (628.7015) | EACH | 32 | $60.00 | $75.00 |
| 42 | Fertilizer type B (629.0210) | CWT | 2 | $100.00 | $80.00 |
| 43 | Seeding mixture no. 40 (630.0140) | LB | 100 | $6.75 | $5.00 |
| 44 | Seed water (630.0500) | MGAL | 39 | $20.00 | $25.00 |
| 45 | Moving signs type II (638.2102) | EACH | 26 | $100.00 | $200.00 |
| 46 | Field office type C (642.5201) | EACH | 1 | $6,670.00 | $9,000.00 |
| 47 | Traffic control drums (643.0300) | DAY | 3,190 | $0.80 | $0.80 |
| 48 | Traffic control barricades type III (643.0420) | DAY | 420 | $1.00 | $1.00 |
| 49 | Traffic control warning lights type A (643.0705) | DAY | 840 | $0.25 | $0.25 |
| 50 | Traffic control warning lights type C (643.0715) | DAY | 735 | $0.25 | $0.25 |
| 51 | Traffic control signs (643.0900) | DAY | 4,378 | $2.50 | $2.50 |
| 52 | Traffic control signs fixed message (643.1000) | SF | 36 | $11.90 | $11.90 |
| 53 | Traffic control cones 42-inch (643.1070) | DAY | 5,124 | $0.65 | $0.65 |
| 54 | Temporary marking line paint 6- inch (643.3165) | LF | 28,584 | $0.55 | $0.55 |
| 55 | Temporary marking line removable tape 6-inch (643.3180) | LF | 4,232 | $1.65 | $1.65 |
| 56 | Temporary marking stop line epoxy 18-inch (643.3820) | LF | 19 | $15.85 | $15.85 |
| 57 | Traffic control (643.5000) | EACH | 1 | $5,200.00 | $5,200.00 |
| 58 | Temporary pedestrian surface matting (644.1440) | SF | 1,090 | $2.50 | $10.00 |
| 59 | Temporary pedestrian curb ramp (644.1601) | DAY | 120 | $3.00 | $20.00 |
| 60 | Temporary pedestrian detectable warning field (644.1605) | SF | 192 | $4.00 | $30.00 |
| 61 | Temporary pedestrian barricade (644.1810) | LF | 2,280 | $3.00 | $10.00 |
| 62 | Marking line epoxy 6-inch (646.2020) | LF | 2,371 | $1.30 | $1.30 |
| 63 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 9,105 | $1.65 | $1.65 |
| 64 | Marking line epoxy 10-inch (646.4020) | LF | 68 | $2.40 | $2.40 |
| 65 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 729 | $2.95 | $2.95 |
| 66 | Marking line same day epoxy 6- inch (646.4720) | LF | 14,940 | $1.30 | $1.30 |
| 67 | Marking arrow epoxy (646.5020) | EACH | 11 | $300.00 | $300.00 |
| 68 | Marking word epoxy (646.5120) | EACH | 3 | $350.00 | $350.00 |
| 69 | Marking symbol epoxy (646.5220) | EACH | 2 | $200.00 | $200.00 |
| 70 | Marking stop line epoxy 18-inch (646.6120) | LF | 163 | $16.00 | $16.00 |
| 71 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 51 | $14.00 | $14.00 |
| 72 | Marking parking stall epoxy (646.8320) | LF | 1,200 | $5.25 | $5.25 |
| 73 | Marking removal line 4-inch (646.9000) | LF | 10,210 | $0.32 | $0.32 |
| 74 | Marking removal line wide (646.9200) | LF | 12 | $0.70 | $0.70 |
| 75 | Construction staking storm sewer (650.4000) | EACH | 3 | $500.00 | $500.00 |
| 76 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 6,084 | $1.24 | $1.24 |
| 77 | Construction staking resurfacing reference (650.8000) | LF | 8,270 | $0.19 | $0.19 |
| 78 | Construction staking curb ramps (650.9000) | EACH | 26 | $250.00 | $250.00 |
| 79 | Construction staking supplemental control (project) 1175-21-70 (650.9911) | EACH | 1 | $1,500.00 | $2,000.00 |
| 80 | Sawing asphalt (690.0150) | LF | 7,318 | $2.57 | $1.75 |
| 81 | Sawing concrete (690.0250) | LF | 1,564 | $4.67 | $2.75 |
| 82 | Incentive iri ride (740.0440) | DOL | 5,600 | $1.00 | $1.00 |
| 83 | Special 01. grading and shaping curb ramp (SPV.0060) | EACH | 26 | $1,080.00 | $1,380.00 |
| 84 | Special 02. adjusting water valve boxes (SPV.0060) | EACH | 30 | $300.00 | $230.00 |
| 85 | Special 01. asphalt terrace (SPV.0165) | SF | 573 | $12.85 | $38.00 |
| 86 | Special 01. protective thermoplastic coating at snowmobile trail crossings (SPV.0180) | SY | 111 | $110.00 | $133.00 |