WisDOT contract 20250408019 bid tabulation

Chelsea - Spirit; Taylor County Line to STH 86 (STH 102, Price County Chelsea - Spirit). Let by Wisconsin DOT on April 8, 2025, Price. 1 bid received; low bid $1,855,011 by American Asphalt of Wisconsin.

Owner
Wisconsin DOT
Letting
08 APR 2025
Pay items
63
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1American Asphalt of Wisconsin$1,855,011Low
WisDOT contract 20250408019: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. American Asphalt of Wisconsin
1Removing small pipe culverts (203.0100)EACH7$511.00
2Removing asphaltic surface butt joints (204.0115)SY240$13.20
3Removing asphaltic surface milling (204.0120)SY87,100$1.42
4Excavation common (205.0100)CY2,157$19.00
5Temporary lane shift during culvert work (208.1500.S)EACH7$2,261.00
6Prepare foundation for asphaltic paving (project) 01. 9225-07-60 (211.0101)EACH1$21,550
7Finishing roadway (project) 01. 9225-07-60 (213.0100)EACH1$3,815.00
8Base aggregate dense 3/4-inch (305.0110)TON280$34.50
9Base aggregate dense 1 1/4-inch (305.0120)TON1,630$23.75
10Shaping shoulders (305.0500)STA642$33.60
11HMA cold weather paving (450.4000)TON2,140$2.50
12Tack coat (455.0605)GAL6,340$4.35
13Incentive density HMA pavement (460.2000)DOL8,550$1.00
14HMA pavement 4 LT 58-28 S (460.5224)TON8,545$82.20
15Asphaltic surface (465.0105)TON605$156.55
16Asphaltic flumes (465.0315)SY5$99.25
17Asphaltic rumble strips, centerline (465.0560)LF30,500$0.43
18Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419)LF254$362.00
19Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424)LF44$350.00
20Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619)EACH12$1,395.00
21Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624)EACH2$1,936.00
22Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF410$39.92
23Riprap medium (606.0200)CY45$95.00
24Maintenance and repair of haul roads (project) 01. 9225-07-60 (618.0100)EACH1$1.00
25Mobilization (619.1000)EACH1$114,400
26Water (624.0100)MGAL27.50$55.00
27Topsoil (625.0100)SY1,180$5.00
28Silt fence (628.1504)LF1,260$2.00
29Silt fence maintenance (628.1520)LF1,260$0.25
30Mobilizations erosion control (628.1905)EACH2$300.00
31Mobilizations emergency erosion control (628.1910)EACH1$300.00
32Erosion mat urban class I type B (628.2008)SY1,180$1.95
33Culvert pipe checks (628.7555)EACH38$15.00
34Rock bags (628.7570)EACH50$15.00
35Fertilizer type B (629.0210)CWT1.30$100.00
36Seeding mixture no. 20 (630.0120)LB70$8.00
37Seed water (630.0500)MGAL29$40.00
38Markers culvert end (633.5200)EACH14$75.00
39Field office type B (642.5001)EACH1$10,000
40Traffic control drums (643.0300)DAY1,200$0.70
41Traffic control barricades type III (643.0420)DAY540$0.70
42Traffic control warning lights type A (643.0705)DAY1,080$0.10
43Traffic control signs (643.0900)DAY2,380$1.50
44Traffic control signs fixed message (643.1000)SF36$11.60
45Temporary marking line paint 6- inch (643.3165)LF52,010$0.30
46Traffic control (643.5000)EACH1$2,000.00
47Geotextile type HR (645.0120)SY45$5.00
48Marking line grooved wet ref epoxy 6-inch (646.2040)LF116,000$1.23
49Cold weather marking epoxy 6-inch (646.6466)LF29,010$0.01
50Construction staking subgrade (650.4500)LF450$0.50
51Construction staking base (650.5000)LF450$0.50
52Construction staking curb gutter and curb & gutter (650.5500)LF440$1.50
53Construction staking pipe culverts (650.6000)EACH7$275.00
54Construction staking resurfacing reference (650.8000)LF31,992$0.18
55Construction staking supplemental control (project) 01. 9225-07-60 (650.9911)EACH1$2,053.44
56Construction staking slope stakes (650.9920)LF410$3.00
57Sawing asphalt (690.0150)LF923$4.60
58Incentive iri ride (740.0440)DOL24,190$1.00
59On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00
60On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00
61Special 01. reestablishing section corner monuments (SPV.0060)EACH4$425.00
62Special 01. removing and disposing tire lined ditch (SPV.0090)LF200$15.00
63Special 01. asphalt base patch partial depth (SPV.0180)SY8,905$23.50
WisDOT contract 20250408019: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy