WisDOT contract 20250408020 bid tabulation

Hudson - Baldwin; St Croix River B-55-0061, B-55-0126 (IH 094, St Croix County Hudson - Baldwin). Let by Wisconsin DOT on April 8, 2025, St Croix. 2 bids received; low bid $9,848,188 by Lunda Construction Company.

Owner
Wisconsin DOT
Letting
08 APR 2025
Pay items
150
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lunda Construction Company$9,848,188Low
2Zenith Tech., Inc. - Waukesha$10,339,172+5.0%
WisDOT contract 20250408020: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lunda Construction Company2. Zenith Tech., Inc. - Waukesha
1Removing structure (structure) 01. R-55-21 (203.0220)EACH1$19,295$19,295
2Removing structure over waterway debris capture (structure) 01. B-55- 61 (203.0270)EACH1$25,000$375,000
3Removing structure over waterway debris capture (structure) 02. B-55- 126 (203.0270)EACH1$1,000.00$350,000
4Debris containment over waterway (structure) 01. B-55-61 (203.0335)EACH1$500.00$150,000
5Debris containment over waterway (structure) 02. B-55-126 (203.0335)EACH1$500.00$150,000
6Removing concrete pavement (204.0100)SY440$34.50$62.15
7Removing asphaltic surface (204.0110)SY8,028$6.70$6.70
8Removing curb & gutter (204.0150)LF173$12.95$12.95
9Removing guardrail (204.0165)LF317$3.50$3.50
10Removing concrete slope paving (204.0175)SY150$103.50$103.50
11Excavation common (205.0100)CY211$64.55$64.55
12Excavation for structures bridges (structure) 01. B-55-61 (206.1001)EACH1$40,000$25,000
13Excavation for structures retaining walls (structure) 01. R-55-29 (206.3001)EACH1$58,190$60,000
14Backfill structure type A (210.1500)TON410$35.00$35.00
15Prepare foundation for asphaltic shoulders (211.0400)STA69$137.30$137.30
16Finishing roadway (project) 01. 1020-00-80 (213.0100)EACH1$1,000.00$2,000.00
17Base aggregate dense 3/4-inch (305.0110)TON146$54.70$54.70
18Base aggregate dense 1 1/4-inch (305.0120)TON1,181$42.45$42.45
19Shaping roadway (305.0502.S)STA8$379.00$379.00
20Concrete pavement 12-inch (415.0120)SY221$210.34$210.34
21Concrete pavement approach slab (415.0410)SY220$394.42$394.42
22Drilled tie bars (416.0610)EACH165$16.16$16.16
23Drilled dowel bars (416.0620)EACH99$21.02$21.02
24Tack coat (455.0605)GAL703$4.25$4.25
25Asphaltic surface (465.0105)TON2,353$122.50$122.50
26Asphaltic rumble strips, shoulder divided roadway (465.0510)LF5,365$1.25$1.25
27Concrete masonry bridges (502.0100)CY244$400.00$1.00
28Expansion device (502.3101)LF125$300.00$275.00
29Expansion device modular (502.3111.S)LF428$2,750.00$2,675.00
30Pigmented surface sealer (502.3210)SY5,985$5.00$15.00
31Adhesive anchors 5/8-inch (502.4105)EACH964$10.00$25.00
32Adhesive anchors no. 5 bar (502.4205)EACH395$20.00$30.00
33Bar steel reinforcement HS coated structures (505.0600)LB32,360$3.31$3.60
34Preparation decks type 1 (509.0301)SY520$120.00$210.00
35Sawing pavement deck preparation areas (509.0310.S)LF371$5.00$15.00
36Joint repair (509.1000)SY341$2,500.00$3,000.00
37Concrete surface repair (509.1500)SF560$125.00$190.00
38Concrete masonry deck repair (509.2100.S)CY30$300.00$3,500.00
39Polymer overlay (509.5100.S)SY33,835$32.00$34.00
40Removing polymer overlay (structure) 01. B-55-61 (509.9015.S)SY15,835$5.90$5.80
41Removing polymer overlay (structure) 02. B-55-126 (509.9015.S)SY18,000$5.90$5.80
42Cleaning parapets (509.9050.S)LF11,875$5.00$3.65
43Temporary shoring (structure) 01. B-55-61 (511.1200)SF815$50.00$90.00
44Temporary shoring (structure) 02. R-55-29 (511.1200)SF3,860$5.00$75.00
45Railing steel type C2 (513.7011)LF2,382$200.00$210.00
46Rubberized membrane waterproofing (516.0500)SY18$25.00$60.00
47Preparation and coating of top flanges (structure) 01. B-55-61 (517.0901.S)EACH1$8,160.00$8,160.00
48Preparation and coating of top flanges (structure) 02. B-55-126 (517.0901.S)EACH1$5,100.00$5,100.00
49Structure overcoating cleaning and priming (structure) 01. B-55-61 (517.3001.S)EACH1$131,600$131,600
50Structure overcoating cleaning and priming (structure) 02. B-55-126 (517.3001.S)EACH1$57,400$57,400
51Containment and collection of waste materials (structure) 01. B- 55-61 (517.4001.S)EACH1$47,000$47,000
52Containment and collection of waste materials (structure) 02. B- 55-126 (517.4001.S)EACH1$20,500$20,500
53Portable decontamination facility (517.6001.S)EACH2$2,000.00$2,000.00
54Concrete curb & gutter integral 30- inch type J (601.0454)LF7$98.24$98.24
55Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF176$100.21$100.21
56Concrete barrier temporary precast delivered (603.8000)LF20,911$13.74$8.25
57Concrete barrier temporary precast installed (603.8125)LF26,645$2.96$4.50
58Slope paving concrete (604.0400)SY230$195.60$195.60
59Adjusting inlet covers (611.8115)EACH3$717.00$717.00
60Pipe underdrain unperforated 6- inch (612.0206)LF180$17.75$17.75
61Pipe underdrain wrapped 6-inch (612.0406)LF700$6.25$6.25
62Anchor assemblies for steel plate beam guard 01. B-55-61 (614.0150)EACH2$250.00$450.00
63Anchor assemblies for steel plate beam guard 02. B-55-0126 (614.0150)EACH2$250.00$450.00
64Crash cushions temporary (614.0905)EACH2$4,750.00$2,000.00
65MGS guardrail 3 (614.2300)LF225$28.20$28.20
66MGS thrie beam transition (614.2500)LF39$108.00$108.00
67MGS guardrail terminal eat (614.2610)EACH1$3,725.00$3,725.00
68MGS guardrail terminal type 2 (614.2620)EACH2$3,675.00$3,675.00
69Maintenance and repair of haul roads (project) 01. 1020-00-80 (618.0100)EACH1$0.01$1.00
70Mobilization (619.1000)EACH1$2,444,024$1,180,000
71Topsoil (625.0100)SY1,615$5.80$5.80
72Silt fence (628.1504)LF1,975$2.45$2.45
73Silt fence maintenance (628.1520)LF1,975$0.01$0.01
74Mobilizations erosion control (628.1905)EACH1$380.00$380.00
75Mobilizations emergency erosion control (628.1910)EACH3$380.00$380.00
76Erosion mat urban class I type B (628.2008)SY400$2.10$2.10
77Inlet protection type B (628.7010)EACH40$53.00$53.00
78Rock bags (628.7570)EACH260$12.00$12.00
79Fertilizer type A (629.0205)CWT1.20$190.00$190.00
80Seeding mixture no. 20 (630.0120)LB72$12.30$12.30
81Seeding temporary (630.0200)LB23$4.00$4.00
82Seed water (630.0500)MGAL38$25.00$25.00
83Delineators temporary (633.1100)EACH20$35.00$40.21
84Moving signs type II (638.2102)EACH1$140.00$140.00
85Moving small sign supports (638.4000)EACH1$68.00$68.00
86Field office type B (642.5001)EACH1$15,000$25,000
87Traffic control drums (643.0300)DAY45,175$0.21$0.21
88Traffic control barricades type III (643.0420)DAY1,150$1.45$1.45
89Traffic control flexible tubular marker posts (643.0500)EACH440$7.58$7.58
90Traffic control flexible tubular marker bases (643.0600)EACH440$19.97$19.97
91Traffic channelizing curb system (643.0650.S)LF825$32.62$32.62
92Traffic control warning lights type A (643.0705)DAY1,695$0.80$0.80
93Traffic control warning lights type C (643.0715)DAY5,640$0.25$0.25
94Traffic control arrow boards (643.0800)DAY204$15.00$15.00
95Traffic control signs (643.0900)DAY21,490$0.26$0.26
96Traffic control covering signs type I (643.0910)EACH6$74.08$74.08
97Traffic control covering signs type II (643.0920)EACH7$63.52$63.52
98Traffic control signs fixed message (643.1000)SF357$25.47$25.47
99Traffic control signs PCMS (643.1050)DAY400$50.00$50.00
100Basic traffic queue warning system (643.1205.S)DAY400$97.12$97.12
101Temporary marking line removable tape 4-inch (643.3150)LF1,181$2.36$2.36
102Temporary marking line paint 6- inch (643.3165)LF70,758$0.50$0.50
103Temporary marking line removable tape 6-inch (643.3180)LF40,151$2.50$2.50
104Temporary marking line paint 10- inch (643.3265)LF6,108$1.10$1.10
105Temporary marking line removable tape 10-inch (643.3280)LF3,443$4.40$4.40
106Traffic control (643.5000)EACH1$53,554$53.55
107Temporary pedestrian barricade (644.1810)LF20$14.84$14.84
108Geotextile type DF schedule A (645.0111)SY1,090$4.00$4.00
109Marking line epoxy 6-inch (646.2020)LF16,520$1.05$0.50
110Marking line grooved black epoxy 6-inch (646.2025)LF3,870$1.50$2.15
111Marking line grooved wet ref epoxy 6-inch (646.2040)LF14,210$2.20$1.32
112Marking replace line wet reflective epoxy 6-inch (646.2041.S)LF4,966$1.80$1.65
113Marking line grooved permanent tape 6-inch (646.2050)LF3,870$10.25$10.00
114Marking line epoxy 10-inch (646.4020)LF3,364$2.00$1.05
115Marking line grooved black epoxy 10-inch (646.4025)LF1,239$3.00$4.00
116Marking line grooved wet ref epoxy 10-inch (646.4040)LF2,257$3.75$2.70
117Marking line grooved permanent tape 10-inch (646.4050)LF1,239$17.50$15.00
118Marking chevron epoxy 24-inch (646.7220)LF460$11.00$21.80
119Marking removal line water blasting 4-inch (646.9010)LF18,194$0.48$0.48
120Marking removal line water blasting 6-inch (646.9012)LF4,453$0.67$0.67
121Marking removal line water blasting 8-inch (646.9110)LF4,696$0.96$0.96
122Marking removal line water blasting 10-inch (646.9112)LF2,031$1.56$1.56
123Construction staking base (650.5000)LF1,550$0.50$0.50
124Construction staking structure layout (structure) 01. R-55-29 (650.6501)EACH1$2,000.00$2,000.00
125Construction staking concrete barrier (650.7500)LF1,789$0.60$0.60
126Construction staking supplemental control (project) 01. 1020-00-80 (650.9911)EACH1$750.00$750.00
127Construction staking slope stakes (650.9920)LF850$1.00$1.00
128Conduit rigid nonmetallic schedule 40 1-inch (652.0210)LF26$49.60$49.60
129Conduit rigid nonmetallic schedule 40 1 1/2-inch (652.0220)LF80$42.40$42.40
130Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF80$48.60$48.60
131Sawing asphalt (690.0150)LF10,530$1.95$1.95
132Sawing concrete (690.0250)LF521$2.75$2.75
133Incentive strength concrete structures (715.0502)DOL1,464$1.00$1.00
134Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00
135Installing and maintaining bird deterrent system (station) 01. sta 636+10WB (999.2000.S)EACH1$0.01$10,000
136Installing and maintaining bird deterrent system (station) 02. sta 636+10EB (999.2000.S)EACH1$0.01$10,000
137On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00
138On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,000$5.00$5.00
139Special 01. pedestrian shuttle service (SPV.0060)EACH1$10,000$200,000
140Special 02. lighting repair (SPV.0060)EACH8$16,020$16,020
141Special 03. cleaning and painting bearings B-55-61 (SPV.0060)EACH12$1,000.00$1,000.00
142Special 04. cleaning and painting bearings B-55-126 (SPV.0060)EACH14$1,000.00$1,000.00
143Special 05. removing and resetting railing R-55-29 (SPV.0060)EACH1$26,625$26,625
144Special 01. glare screens temporary (SPV.0090)LF12,700$2.86$2.86
145Special 02. remove, store, and reinstall DOT owned concrete barrier precast (SPV.0090)LF1,789$13.66$10.00
146Special 03. fill and restore existing concrete rumble strips (SPV.0090)LF7,556$5.95$8.95
147Special 04. marking line grooved wet reflective contrast tape 10- inch (SPV.0090)LF2,031$21.00$16.50
148Special 05. marking replace line contrast permanent tape 4-inch (SPV.0090)LF1,180$11.00$12.00
149Special 01. wall modular block mechanically stabilized earth R-55- 29 (SPV.0165)SF3,450$135.60$135.60
150Special 02. wall modular block gravity R-55-29 (SPV.0165)SF835$135.60$135.60
WisDOT contract 20250408020: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy