WisDOT contract 20250408021 bid tabulation
1020-00-84. Let by Wisconsin DOT on April 8, 2025, St Croix. 1 bid received; low bid $2,995,948 by Mattison Contractors, Inc..
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 55
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mattison Contractors, Inc. | $2,995,948 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mattison Contractors, Inc. |
|---|---|---|---|---|
| 1 | Removing inlets (204.0220) | EACH | 1 | $505.00 |
| 2 | Removing (item description) 01. removing apron endwalls (204.9060.S) | EACH | 13 | $255.00 |
| 3 | Excavation common (205.0100) | CY | 1,872 | $33.00 |
| 4 | Borrow (208.0100) | CY | 5,533 | $21.30 |
| 5 | Finishing roadway (project) 01. 1020-00-84 (213.0100) | EACH | 1 | $1,515.00 |
| 6 | Finishing roadway (project) 02. 1050-00-80 (213.0100) | EACH | 1 | $1,515.00 |
| 7 | Finishing roadway (project) 03. 1190-01-86 (213.0100) | EACH | 1 | $1,515.00 |
| 8 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,434 | $40.40 |
| 9 | Reconstructing inlets (611.0430) | EACH | 3 | $888.00 |
| 10 | Inlet covers type MS (611.0642) | EACH | 2 | $1,080.00 |
| 11 | Inlets median 2 grate (611.3902) | EACH | 1 | $5,695.00 |
| 12 | Adjusting inlet covers (611.8115) | EACH | 7 | $888.00 |
| 13 | Cable barrier type 1 (613.1100.S) | LF | 48,404 | $40.78 |
| 14 | Cable barrier end terminal type 1 (613.1200.S) | EACH | 26 | $4,505.00 |
| 15 | Maintenance and repair of haul roads (project) 01. 1020-00-84 (618.0100) | EACH | 1 | $555.00 |
| 16 | Maintenance and repair of haul roads (project) 02. 1050-00-80 (618.0100) | EACH | 1 | $555.00 |
| 17 | Maintenance and repair of haul roads (project) 03. 1190-01-86 (618.0100) | EACH | 1 | $555.00 |
| 18 | Mobilization (619.1000) | EACH | 1 | $259,525 |
| 19 | Water (624.0100) | MGAL | 23 | $69.45 |
| 20 | Salvaged topsoil (625.0500) | SY | 64,526 | $1.30 |
| 21 | Mulching (627.0200) | SY | 47,214 | $0.42 |
| 22 | Silt fence (628.1504) | LF | 280 | $3.05 |
| 23 | Silt fence maintenance (628.1520) | LF | 280 | $1.00 |
| 24 | Mobilizations erosion control (628.1905) | EACH | 11 | $175.00 |
| 25 | Mobilizations emergency erosion control (628.1910) | EACH | 7 | $175.00 |
| 26 | Erosion mat urban class I type B (628.2008) | SY | 17,324 | $1.75 |
| 27 | Inlet protection type A (628.7005) | EACH | 17 | $182.00 |
| 28 | Temporary ditch checks (628.7504) | LF | 1,669 | $7.15 |
| 29 | Culvert pipe checks (628.7555) | EACH | 30 | $18.80 |
| 30 | Fertilizer type B (629.0210) | CWT | 40.68 | $93.70 |
| 31 | Seeding mixture no. 20 (630.0120) | LB | 1,567 | $8.80 |
| 32 | Seeding mixture no. 80 (630.0180) | LB | 167 | $67.00 |
| 33 | Seeding temporary (630.0200) | LB | 125 | $5.60 |
| 34 | Seeding nurse crop (630.0400) | LB | 219 | $8.00 |
| 35 | Seed water (630.0500) | MGAL | 372 | $24.00 |
| 36 | Field office type B (642.5001) | EACH | 1 | $26,000 |
| 37 | Traffic control drums (643.0300) | DAY | 6,803 | $0.18 |
| 38 | Traffic control barricades type III (643.0420) | DAY | 381 | $1.00 |
| 39 | Traffic control warning lights type A (643.0705) | DAY | 762 | $0.50 |
| 40 | Traffic control warning lights type C (643.0715) | DAY | 1,094 | $0.30 |
| 41 | Traffic control arrow boards (643.0800) | DAY | 65 | $25.00 |
| 42 | Traffic control signs (643.0900) | DAY | 1,031 | $0.75 |
| 43 | Traffic control signs PCMS with TMC communications (643.1051) | DAY | 84 | $30.00 |
| 44 | Basic traffic queue warning system (643.1205.S) | DAY | 66 | $245.00 |
| 45 | Traffic control (643.5000) | EACH | 1 | $64,500 |
| 46 | Construction staking supplemental control (project) 01. 1020-00-84 (650.9911) | EACH | 1 | $1,000.00 |
| 47 | Construction staking supplemental control (project) 02. 1050-00-80 (650.9911) | EACH | 1 | $1,000.00 |
| 48 | Construction staking supplemental control (project) 03. 1190-01-86 (650.9911) | EACH | 1 | $1,000.00 |
| 49 | Construction staking slope stakes (650.9920) | LF | 20,183 | $0.63 |
| 50 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 |
| 51 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 |
| 52 | Special 01. digital speed reduction system (DSRS) (SPV.0045) | DAY | 112 | $135.00 |
| 53 | Special 01. apron endwalls for culvert pipe reinforced concrete 18-inch, 6:1 slope (SPV.0060) | EACH | 13 | $1,755.00 |
| 54 | Special 01. native seeding mixture no. 75 updated (SPV.0085) | LB | 20 | $123.75 |
| 55 | Special 01. construction staking median cable barrier (SPV.0090) | LF | 49,107 | $0.17 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.