WisDOT contract 20250513023 bid tabulation
V Black Creek, STH 47; Storm Sewer Improvement (STH 047, Outagamie County V Black Creek). Let by Wisconsin DOT on May 13, 2025, Outagamie. 3 bids received; low bid $2,429,501 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 13 MAY 2025
- Pay items
- 131
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $2,429,501 | Low |
| 2 | Northeast Asphalt, Inc | $2,653,975 | +9.0% |
| 3 | James Peterson Sons, Inc. | $2,800,000 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Northeast Asphalt, Inc | 3. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 12 | $316.50 | $425.53 | $316.50 |
| 2 | Grubbing (201.0215) | ACRE | 1.20 | $3,692.50 | $11,705 | $3,692.50 |
| 3 | Removing concrete pavement (204.0100) | SY | 148 | $6.30 | $7.54 | $10.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 1,880 | $0.01 | $6.46 | $2.11 |
| 5 | Removing curb & gutter (204.0150) | LF | 990 | $5.45 | $8.62 | $2.76 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 170 | $8.12 | $7.54 | $10.00 |
| 7 | Removing fence (204.0170) | LF | 22 | $10.00 | $1.45 | $10.00 |
| 8 | Removing manholes (204.0210) | EACH | 8 | $455.00 | $457.84 | $1,000.00 |
| 9 | Removing inlets (204.0220) | EACH | 3 | $370.00 | $350.11 | $400.00 |
| 10 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 333 | $10.74 | $12.93 | $13.13 |
| 11 | Removing storm sewer (size) 02. 24-inch (204.0245) | LF | 670 | $14.20 | $12.93 | $13.12 |
| 12 | Removing storm sewer (size) 03. 48-inch (204.0245) | LF | 1,176 | $33.15 | $16.16 | $34.65 |
| 13 | Removing storm sewer (size) 05. 60-inch (204.0245) | LF | 8 | $39.06 | $43.09 | $87.38 |
| 14 | Removing storm sewer (size) 06. 38X60-inch (204.0245) | LF | 24 | $43.75 | $21.55 | $24.46 |
| 15 | Abandoning manholes (204.0250) | EACH | 3 | $823.33 | $807.95 | $1,204.85 |
| 16 | Excavation common (205.0100) | CY | 1,000 | $42.20 | $17.24 | $17.19 |
| 17 | Backfill granular grade 2 (209.2100) | CY | 64 | $35.14 | $31.24 | $44.97 |
| 18 | Prepare foundation for asphaltic paving (project) 01. 6240-31-71 (211.0101) | EACH | 1 | $16,550 | $17,650 | $16,550 |
| 19 | Finishing roadway (project) 01. 6240-31-71 (213.0100) | EACH | 1 | $2,500.00 | $3,098.59 | $1,000.00 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 42 | $35.14 | $23.70 | $24.36 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,560 | $16.90 | $17.24 | $20.59 |
| 22 | Drilled tie bars (416.0610) | EACH | 34 | $12.00 | $12.80 | $12.00 |
| 23 | Tack coat (455.0605) | GAL | 120 | $15.00 | $16.00 | $15.00 |
| 24 | Asphaltic surface (465.0105) | TON | 362 | $129.50 | $138.11 | $129.50 |
| 25 | Asphaltic surface driveways and field entrances (465.0120) | TON | 100 | $129.50 | $138.11 | $129.50 |
| 26 | Concrete collars for pipe (520.8000) | EACH | 2 | $893.75 | $810.10 | $825.00 |
| 27 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,792.90 | $1,741.92 | $1,739.61 |
| 28 | Apron endwalls for culvert pipe reinforced concrete 60-inch (522.1060) | EACH | 2 | $5,856.25 | $4,918.77 | $5,351.36 |
| 29 | Apron endwalls for culvert pipe reinforced concrete 84-inch (522.1084) | EACH | 1 | $8,305.00 | $7,881.23 | $8,897.63 |
| 30 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 770 | $22.00 | $23.46 | $22.00 |
| 31 | Concrete sidewalk 4-inch (602.0405) | SF | 1,570 | $7.50 | $7.47 | $7.00 |
| 32 | Concrete sidewalk 6-inch (602.0415) | SF | 85 | $7.75 | $7.73 | $7.25 |
| 33 | Curb ramp detectable warning field yellow (602.0505) | SF | 30 | $50.00 | $53.32 | $50.00 |
| 34 | Concrete driveway 6-inch (602.0810) | SY | 141 | $71.00 | $72.52 | $68.00 |
| 35 | Riprap medium (606.0200) | CY | 257 | $86.19 | $91.57 | $91.18 |
| 36 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 32 | $69.93 | $73.25 | $265.32 |
| 37 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 30 | $113.00 | $101.26 | $172.24 |
| 38 | Storm sewer pipe reinforced concrete class III 42-inch (608.0342) | LF | 271 | $238.14 | $240.23 | $272.01 |
| 39 | Storm sewer pipe reinforced concrete class III 60-inch (608.0360) | LF | 293 | $401.41 | $470.76 | $434.79 |
| 40 | Storm sewer pipe reinforced concrete class III 72-inch (608.0372) | LF | 955 | $539.23 | $688.37 | $723.00 |
| 41 | Storm sewer pipe reinforced concrete class III 84-inch (608.0384) | LF | 155 | $726.26 | $987.85 | $920.90 |
| 42 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 35 | $70.27 | $75.41 | $262.82 |
| 43 | Storm sewer pipe reinforced concrete class IV 60-inch (608.0460) | LF | 202 | $476.27 | $573.10 | $541.14 |
| 44 | Storm sewer pipe reinforced concrete class V 72-inch (608.0572) | LF | 83 | $853.08 | $973.84 | $959.63 |
| 45 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 331 | $160.01 | $180.98 | $186.83 |
| 46 | Storm sewer pipe class III-B 12- inch (608.3612) | LF | 15 | $60.76 | $64.64 | $249.26 |
| 47 | Storm sewer pipe class III-B 30- inch (608.3630) | LF | 152 | $154.72 | $150.82 | $137.98 |
| 48 | Storm sewer pipe class III-B 36- inch (608.3636) | LF | 191 | $156.08 | $156.20 | $161.66 |
| 49 | Reconstructing manholes (611.0420) | EACH | 1 | $1,325.00 | $727.16 | $660.79 |
| 50 | Manhole covers type J (611.0530) | EACH | 8 | $445.00 | $556.94 | $1,184.39 |
| 51 | Inlet covers type H (611.0624) | EACH | 6 | $657.00 | $816.56 | $1,579.32 |
| 52 | Catch basins 5-FT diameter (611.1005) | EACH | 3 | $4,601.50 | $5,316.28 | $4,128.99 |
| 53 | Catch basins 6-FT diameter (611.1006) | EACH | 1 | $8,279.50 | $8,941.26 | $9,816.16 |
| 54 | Manholes 3-FT diameter (611.2003) | EACH | 1 | $2,636.00 | $3,003.40 | $1,406.08 |
| 55 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $5,575.00 | $5,571.59 | $4,383.30 |
| 56 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $14,803 | $17,186 | $14,809 |
| 57 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $3,001.65 | $3,397.68 | $2,119.95 |
| 58 | Inlets 2X3-FT (611.3230) | EACH | 2 | $2,513.50 | $3,070.20 | $1,834.78 |
| 59 | Salvaged inlet covers (611.9710) | EACH | 1 | $237.50 | $86.19 | $1,671.88 |
| 60 | Pipe underdrain unperforated 4- inch (612.0204) | LF | 25 | $22.68 | $21.55 | $25.99 |
| 61 | Insulation board polystyrene (inch) 01. 2-inch (612.0902.S) | SY | 7 | $32.14 | $6.46 | $27.00 |
| 62 | Maintenance and repair of haul roads (project) 01. 6240-31-71 (618.0100) | EACH | 1 | $0.01 | $10,773 | $0.01 |
| 63 | Mobilization (619.1000) | EACH | 1 | $261,500 | $118,790 | $245,925 |
| 64 | Water (624.0100) | MGAL | 16 | $20.00 | $16.16 | $50.00 |
| 65 | Topsoil (625.0100) | SY | 6,730 | $6.25 | $7.54 | $3.26 |
| 66 | Silt fence (628.1504) | LF | 1,200 | $2.25 | $2.40 | $2.25 |
| 67 | Silt fence maintenance (628.1520) | LF | 1,200 | $0.01 | $0.01 | $0.01 |
| 68 | Mobilizations erosion control (628.1905) | EACH | 2 | $350.00 | $373.27 | $350.00 |
| 69 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $200.00 | $213.30 | $200.00 |
| 70 | Erosion mat urban class I type A (628.2006) | SY | 6,710 | $1.80 | $1.92 | $1.80 |
| 71 | Erosion mat class II type C (628.2027) | SY | 25 | $8.00 | $8.53 | $8.00 |
| 72 | Inlet protection type B (628.7010) | EACH | 4 | $68.00 | $72.52 | $68.00 |
| 73 | Inlet protection type C (628.7015) | EACH | 16 | $70.00 | $74.65 | $70.00 |
| 74 | Temporary ditch checks (628.7504) | LF | 35 | $15.00 | $16.00 | $15.00 |
| 75 | Culvert pipe checks (628.7555) | EACH | 66 | $15.00 | $16.00 | $15.00 |
| 76 | Rock bags (628.7570) | EACH | 25 | $15.00 | $16.00 | $15.00 |
| 77 | Fertilizer type B (629.0210) | CWT | 5 | $110.00 | $117.31 | $110.00 |
| 78 | Seeding mixture no. 10 (630.0110) | LB | 2 | $150.00 | $159.98 | $150.00 |
| 79 | Seeding mixture no. 40 (630.0140) | LB | 270 | $8.75 | $9.33 | $8.75 |
| 80 | Seed water (630.0500) | MGAL | 3 | $100.00 | $106.65 | $100.00 |
| 81 | Moving signs type II (638.2102) | EACH | 2 | $100.00 | $106.65 | $100.00 |
| 82 | Moving small sign supports (638.4000) | EACH | 2 | $100.00 | $106.65 | $100.00 |
| 83 | Field office type B (642.5001) | EACH | 1 | $8,500.00 | $6,194.16 | $6,000.00 |
| 84 | Traffic control drums (643.0300) | DAY | 1,140 | $0.75 | $0.80 | $0.75 |
| 85 | Traffic control barricades type III (643.0420) | DAY | 274 | $4.00 | $4.27 | $4.00 |
| 86 | Traffic control warning lights type A (643.0705) | DAY | 1,490 | $0.25 | $0.27 | $0.25 |
| 87 | Traffic control warning lights type C (643.0715) | DAY | 96 | $0.25 | $0.27 | $0.25 |
| 88 | Traffic control signs (643.0900) | DAY | 457 | $1.00 | $1.07 | $1.00 |
| 89 | Traffic control signs fixed message (643.1000) | SF | 78 | $24.00 | $25.60 | $24.00 |
| 90 | Temporary marking line removable tape 4-inch (643.3150) | LF | 108 | $1.00 | $1.07 | $1.00 |
| 91 | Traffic control (643.5000) | EACH | 1 | $3,000.00 | $3,199.46 | $3,000.00 |
| 92 | Temporary pedestrian surface matting (644.1440) | SF | 220 | $10.00 | $10.66 | $10.00 |
| 93 | Temporary pedestrian curb ramp (644.1601) | DAY | 21 | $10.00 | $10.66 | $10.00 |
| 94 | Temporary pedestrian detectable warning field (644.1605) | SF | 30 | $14.00 | $14.93 | $14.00 |
| 95 | Temporary pedestrian barricade (644.1810) | LF | 80 | $5.00 | $5.33 | $5.00 |
| 96 | Geotextile type HR (645.0120) | SY | 513 | $3.90 | $6.46 | $4.26 |
| 97 | Marking crosswalk paint transverse line 6-inch (646.7405) | LF | 73 | $15.00 | $16.00 | $15.00 |
| 98 | Marking removal line 4-inch (646.9000) | LF | 60 | $10.00 | $7.47 | $10.00 |
| 99 | Construction staking storm sewer (650.4000) | EACH | 18 | $40.11 | $42.78 | $40.11 |
| 100 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 990 | $0.67 | $0.71 | $0.67 |
| 101 | Construction staking pipe culverts (650.6000) | EACH | 1 | $150.00 | $159.97 | $150.00 |
| 102 | Construction staking curb ramps (650.9000) | EACH | 3 | $180.00 | $191.97 | $180.00 |
| 103 | Construction staking supplemental control (project) 01. 6240-31-71 (650.9911) | EACH | 1 | $912.00 | $972.64 | $912.00 |
| 104 | Sawing asphalt (690.0150) | LF | 1,435 | $3.00 | $1.33 | $1.10 |
| 105 | Sawing concrete (690.0250) | LF | 222 | $3.00 | $2.40 | $2.25 |
| 106 | Special 01. trench backfill (SPV.0035) | CY | 250 | $37.20 | $34.47 | $42.87 |
| 107 | Special 01. manholes 7X7-FT (SPV.0060) | EACH | 1 | $16,831 | $19,455 | $16,514 |
| 108 | Special 02. manholes 8X8-FT (SPV.0060) | EACH | 6 | $26,530 | $31,241 | $31,382 |
| 109 | Special 03. manholes 9X9-FT (SPV.0060) | EACH | 1 | $43,470 | $54,294 | $54,052 |
| 110 | Special 04. 8" gate valve & box (SPV.0060) | EACH | 1 | $3,201.00 | $3,727.32 | $3,542.00 |
| 111 | Special 05. 10" gate valve & box (SPV.0060) | EACH | 2 | $4,551.50 | $5,401.38 | $5,191.20 |
| 112 | Special 06. watermain offset PVC C-900 (SPV.0060) | EACH | 1 | $10,500 | $4,765.80 | $4,912.42 |
| 113 | Special 07. 8" watermain tie in, station 100+74 (SPV.0060) | EACH | 1 | $2,700.00 | $1,982.16 | $2,293.78 |
| 114 | Special 08. 10" watermain tie in, station 101+27 (SPV.0060) | EACH | 1 | $4,505.00 | $3,077.73 | $2,272.78 |
| 115 | Special 09. 10" watermain tie in, station 200+47 (SPV.0060) | EACH | 1 | $4,505.00 | $3,077.73 | $2,972.25 |
| 116 | Special 11. beehive casting (SPV.0060) | EACH | 3 | $454.00 | $567.72 | $1,601.43 |
| 117 | Special 12. utility line opening (SPV.0060) | EACH | 1 | $975.00 | $754.08 | $1,000.00 |
| 118 | Special 01. concrete curb and gutter 24-inch type D special (SPV.0090) | LF | 220 | $20.00 | $21.33 | $20.00 |
| 119 | Special 02. PVC storm lateral 4- inch (SPV.0090) | LF | 67 | $69.10 | $80.79 | $117.19 |
| 120 | Special 03. PVC storm lateral 6- inch (SPV.0090) | LF | 18 | $78.56 | $107.73 | $133.71 |
| 121 | Special 04. 8" watermain PVC C- 900 (SPV.0090) | LF | 34 | $113.75 | $95.88 | $211.01 |
| 122 | Special 05. 10" watermain PVC C- 900 (SPV.0090) | LF | 40 | $124.75 | $184.21 | $214.59 |
| 123 | Special 07. storm sewer pipe reinforced concrete class HE-IV 48X76-inch (SPV.0090) | LF | 292 | $511.16 | $670.06 | $612.60 |
| 124 | Special 08. storm sewer pipe reinforced concrete class V 72- inch special (SPV.0090) | LF | 100 | $864.79 | $1,201.15 | $1,155.55 |
| 125 | Special 09. culvert pipe reinforced concrete class V 60-inch special (SPV.0090) | LF | 72 | $779.88 | $751.93 | $1,126.43 |
| 126 | Special 10. removing storm sewer 48-inch special (SPV.0090) | LF | 145 | $87.07 | $102.34 | $139.12 |
| 127 | Special 11. PVC storm sewer 8- inch (SPV.0090) | LF | 15 | $62.00 | $140.04 | $260.21 |
| 128 | Special 12. PVC storm sewer 10- inch (SPV.0090) | LF | 12 | $64.17 | $145.43 | $250.22 |
| 129 | Special 13. PVC storm sewer 18- inch (SPV.0090) | LF | 11 | $148.18 | $156.20 | $277.48 |
| 130 | Special 01. traffic bond limestone 3/8-inch (SPV.0195) | TON | 13 | $40.00 | $73.20 | $61.25 |
| 131 | Special 02. excavating, hauling, disposal of contaminated soil (SPV.0195) | TON | 50 | $121.10 | $10.77 | $79.77 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.