Oshkosh - Greenville; Larsen Rd Intersection (STH 076, Winnebago County Oshkosh - Greenville). Let by Wisconsin DOT on May 13, 2025, Winnebago. 5 bids received; low bid $1,740,854 by Northeast Asphalt, Inc.
- Owner
- Wisconsin DOT
- Letting
- 13 MAY 2025
- Pay items
- 142
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northeast Asphalt, Inc | $1,740,854 | Low |
| 2 | Relyco Plus, LLC | $1,805,102 | +4.0% |
| 3 | MCC, Inc. | $1,809,402 | +4.0% |
| 4 | Michels Road & Stone, Inc. | $1,859,928 | +7.0% |
| 5 | James Peterson Sons, Inc. | $2,269,661 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northeast Asphalt, Inc | 2. Relyco Plus, LLC | 3. MCC, Inc. | 4. Michels Road & Stone, Inc. | 5. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 4 | $522.33 | $400.00 | $499.00 | $499.00 | $400.00 |
| 2 | Grubbing (201.0220) | ID | 36 | $22.71 | $20.00 | $29.99 | $29.99 | $20.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 9 | $224.47 | $399.00 | $175.00 | $400.00 | $698.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 67 | $8.04 | $6.30 | $12.75 | $5.00 | $25.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 565 | $5.06 | $6.00 | $3.00 | $5.00 | $2.50 |
| 6 | Removing fence (204.0170) | LF | 62 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 7 | Removing inlets (204.0220) | EACH | 3 | $423.84 | $294.00 | $325.00 | $325.00 | $750.00 |
| 8 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 223 | $11.52 | $12.00 | $15.00 | $15.00 | $20.00 |
| 9 | Removing storm sewer (size) 02. 6- inch (204.0245) | LF | 50 | $3.02 | $10.00 | $10.00 | $10.00 | $20.00 |
| 10 | Removing storm sewer (size) 03. 4- inch (204.0245) | LF | 16 | $11.11 | $10.00 | $8.00 | $8.00 | $20.00 |
| 11 | Excavation common (205.0100) | CY | 17,500 | $9.98 | $16.49 | $10.15 | $11.50 | $21.06 |
| 12 | Finishing roadway (project) 01. 6430-24-71 (213.0100) | EACH | 1 | $1,624.31 | $2,500.00 | $3,000.00 | $4,500.00 | $5,000.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 990 | $23.22 | $25.72 | $23.65 | $22.80 | $30.95 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 5,900 | $15.40 | $7.53 | $13.80 | $14.30 | $21.96 |
| 15 | Base aggregate open-graded (310.0115) | CY | 85 | $31.54 | $28.00 | $54.75 | $70.00 | $56.73 |
| 16 | Select crushed material (312.0110) | TON | 11,300 | $15.23 | $11.45 | $11.85 | $11.30 | $16.69 |
| 17 | Coloring concrete wisdot red (405.0100) | CY | 241 | $78.40 | $77.00 | $78.40 | $78.40 | $78.40 |
| 18 | Concrete truck apron 12-inch (415.2010) | SY | 480 | $83.45 | $84.62 | $83.45 | $83.45 | $83.45 |
| 19 | Tack coat (455.0605) | GAL | 950 | $3.25 | $3.25 | $4.20 | $3.25 | $3.25 |
| 20 | Incentive density HMA pavement (460.2000) | DOL | 3,100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 21 | HMA pavement 3 HT 58-28 S (460.7223) | TON | 3,920 | $65.15 | $65.15 | $81.00 | $65.15 | $65.15 |
| 22 | HMA pavement 4 HT 58-28 H (460.7424) | TON | 920 | $86.70 | $86.70 | $92.00 | $86.70 | $86.70 |
| 23 | Asphaltic surface driveways and field entrances (465.0120) | TON | 22 | $175.00 | $175.00 | $158.00 | $175.00 | $175.00 |
| 24 | Asphaltic flumes (465.0315) | SY | 26 | $60.00 | $60.00 | $52.00 | $60.00 | $60.00 |
| 25 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 1 | $709.09 | $949.00 | $702.00 | $702.00 | $775.00 |
| 26 | Culvert pipe class III-A 18-inch (520.3318) | LF | 82 | $50.51 | $68.75 | $50.00 | $50.00 | $71.00 |
| 27 | Apron endwalls for culvert pipe sloped side drains steel 18-inch 6 to 1 (521.1518) | EACH | 4 | $1,350.51 | $1,359.00 | $1,337.00 | $1,337.00 | $1,210.00 |
| 28 | Apron endwalls for culvert pipe sloped side drains steel 30-inch 6 to 1 (521.1530) | EACH | 1 | $3,934.34 | $3,772.00 | $3,895.00 | $3,895.00 | $3,800.00 |
| 29 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 72 | $140.40 | $106.00 | $139.00 | $139.00 | $114.00 |
| 30 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 2 | $1,220.20 | $1,215.00 | $1,208.00 | $1,208.00 | $1,233.00 |
| 31 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 3 | $1,676.77 | $1,608.00 | $1,660.00 | $1,660.00 | $1,642.00 |
| 32 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 230 | $19.60 | $22.50 | $19.60 | $19.60 | $19.60 |
| 33 | Concrete curb pedestrian (601.0600) | LF | 104 | $55.00 | $40.00 | $55.00 | $55.00 | $55.00 |
| 34 | Concrete sidewalk 4-inch (602.0405) | SF | 13,390 | $6.45 | $6.85 | $6.45 | $6.45 | $6.45 |
| 35 | Curb ramp detectable warning field natural patina (602.0515) | SF | 320 | $30.00 | $34.00 | $30.00 | $30.00 | $30.00 |
| 36 | Concrete driveway 6-inch (602.0810) | SY | 165 | $64.35 | $68.00 | $64.35 | $64.35 | $64.35 |
| 37 | Riprap medium (606.0200) | CY | 30 | $73.37 | $95.00 | $61.00 | $150.00 | $89.00 |
| 38 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 459 | $78.79 | $73.75 | $79.00 | $79.00 | $202.92 |
| 39 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 207 | $80.81 | $81.00 | $82.00 | $82.00 | $209.45 |
| 40 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 176 | $116.16 | $119.25 | $115.00 | $115.00 | $226.59 |
| 41 | Storm sewer pipe class III-A 30- inch (608.3030) | LF | 108 | $102.02 | $108.00 | $101.00 | $101.00 | $277.60 |
| 42 | Manhole covers type J (611.0530) | EACH | 6 | $536.36 | $467.00 | $531.00 | $531.00 | $584.00 |
| 43 | Inlet covers type H (611.0624) | EACH | 9 | $786.87 | $691.00 | $779.00 | $779.00 | $898.00 |
| 44 | Inlet covers type HM (611.0627) | EACH | 1 | $786.87 | $691.00 | $779.00 | $779.00 | $898.00 |
| 45 | Inlet covers type HM-S (611.0636) | EACH | 1 | $786.87 | $691.00 | $779.00 | $779.00 | $898.00 |
| 46 | Inlet covers type H-S (611.0639) | EACH | 3 | $786.87 | $691.00 | $779.00 | $779.00 | $898.00 |
| 47 | Inlet covers type MS (611.0642) | EACH | 2 | $548.49 | $478.00 | $543.00 | $543.00 | $599.00 |
| 48 | Inlet covers type MS-A (611.0645) | EACH | 1 | $570.71 | $498.00 | $565.00 | $565.00 | $999.00 |
| 49 | Inlet covers type T (611.0652) | EACH | 2 | $1,068.69 | $943.00 | $1,058.00 | $1,058.00 | $1,251.00 |
| 50 | Manholes 4-FT diameter (611.2004) | EACH | 2 | $3,545.46 | $3,779.00 | $3,510.00 | $3,510.00 | $3,642.00 |
| 51 | Manholes 5-FT diameter (611.2005) | EACH | 4 | $5,645.46 | $5,401.00 | $5,589.00 | $5,589.00 | $5,655.00 |
| 52 | Inlets 4-FT diameter (611.3004) | EACH | 5 | $3,485.86 | $3,451.00 | $3,451.00 | $3,451.00 | $3,052.00 |
| 53 | Inlets 2X3-FT (611.3230) | EACH | 9 | $2,738.38 | $2,712.00 | $2,711.00 | $2,711.00 | $2,293.00 |
| 54 | Inlets median 1 grate (611.3901) | EACH | 3 | $3,191.92 | $3,109.00 | $3,160.00 | $3,160.00 | $3,145.00 |
| 55 | Pipe underdrain 4-inch (612.0104) | LF | 120 | $10.47 | $22.00 | $20.00 | $32.00 | $20.00 |
| 56 | Pipe underdrain 6-inch (612.0106) | LF | 1,825 | $6.34 | $18.50 | $23.00 | $13.60 | $12.44 |
| 57 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 2 | $259.60 | $323.00 | $257.00 | $257.00 | $400.00 |
| 58 | Maintenance and repair of haul roads (project) 01. 6430-24-71 (618.0100) | EACH | 1 | $546.37 | $0.01 | $1.00 | $0.01 | $100.00 |
| 59 | Mobilization (619.1000) | EACH | 1 | $78,000 | $110,500 | $103,500 | $196,779 | $193,020 |
| 60 | Concrete median sloped nose (620.0300) | SF | 370 | $12.00 | $14.00 | $12.00 | $12.00 | $12.00 |
| 61 | Water (624.0100) | MGAL | 350 | $35.89 | $0.01 | $35.95 | $30.00 | $45.00 |
| 62 | Topsoil (625.0100) | SY | 8,000 | $4.43 | $3.81 | $3.30 | $3.80 | $5.12 |
| 63 | Mulching (627.0200) | SY | 500 | $0.55 | $0.55 | $0.55 | $0.55 | $0.55 |
| 64 | Silt fence (628.1504) | LF | 1,500 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 65 | Silt fence maintenance (628.1520) | LF | 1,500 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 66 | Mobilizations erosion control (628.1905) | EACH | 6 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 67 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 68 | Erosion mat urban class I type B (628.2008) | SY | 8,000 | $1.78 | $1.78 | $1.78 | $1.78 | $1.78 |
| 69 | Inlet protection type A (628.7005) | EACH | 21 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 70 | Inlet protection type C (628.7015) | EACH | 16 | $68.00 | $68.00 | $68.00 | $68.00 | $68.00 |
| 71 | Temporary ditch checks (628.7504) | LF | 120 | $8.25 | $8.25 | $8.25 | $8.25 | $8.25 |
| 72 | Culvert pipe checks (628.7555) | EACH | 12 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 73 | Tracking pads (628.7560) | EACH | 3 | $1,128.14 | $0.01 | $1,055.00 | $100.00 | $3,000.00 |
| 74 | Rock bags (628.7570) | EACH | 20 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 75 | Fertilizer type B (629.0210) | CWT | 5 | $110.00 | $110.00 | $110.00 | $110.00 | $110.00 |
| 76 | Seeding mixture no. 40 (630.0140) | LB | 350 | $8.25 | $8.25 | $8.25 | $8.25 | $8.25 |
| 77 | Seeding temporary (630.0200) | LB | 50 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 78 | Seed water (630.0500) | MGAL | 450 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 79 | Markers culvert end (633.5200) | EACH | 2 | $70.00 | $70.00 | $70.00 | $70.00 | $70.00 |
| 80 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 8 | $82.00 | $82.00 | $82.00 | $82.00 | $82.00 |
| 81 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 27 | $86.00 | $86.00 | $86.00 | $86.00 | $86.00 |
| 82 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 12 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 83 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 2 | $210.00 | $210.00 | $210.00 | $210.00 | $210.00 |
| 84 | Signs type II reflective H (637.2210) | SF | 287.54 | $21.95 | $21.95 | $21.95 | $21.95 | $21.95 |
| 85 | Signs type II reflective F (637.2230) | SF | 65.24 | $22.80 | $22.80 | $22.80 | $22.80 | $22.80 |
| 86 | Removing signs type II (638.2602) | EACH | 7 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 87 | Removing small sign supports (638.3000) | EACH | 11 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 88 | Field office type C (642.5201) | EACH | 1 | $11,539 | $9,500.00 | $12,000 | $15,000 | $10,000 |
| 89 | Traffic control drums (643.0300) | DAY | 200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 90 | Traffic control barricades type III (643.0420) | DAY | 2,600 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 91 | Traffic control warning lights type A (643.0705) | DAY | 5,200 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 |
| 92 | Traffic control signs (643.0900) | DAY | 27,380 | $0.17 | $0.17 | $0.17 | $0.17 | $0.17 |
| 93 | Traffic control covering signs type I (643.0910) | EACH | 4 | $245.00 | $245.00 | $245.00 | $245.00 | $245.00 |
| 94 | Traffic control covering signs type II (643.0920) | EACH | 9 | $105.00 | $105.00 | $105.00 | $105.00 | $105.00 |
| 95 | Traffic control signs fixed message (643.1000) | SF | 104 | $30.25 | $30.25 | $30.25 | $30.25 | $30.25 |
| 96 | Traffic control signs PCMS (643.1050) | DAY | 42 | $18.50 | $18.50 | $18.50 | $18.50 | $18.50 |
| 97 | Traffic control (643.5000) | EACH | 1 | $11,550 | $11,550 | $11,550 | $11,550 | $11,550 |
| 98 | Temporary pedestrian barricade (644.1810) | LF | 12 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 99 | Geotextile type DF schedule A (645.0111) | SY | 1,230 | $1.14 | $2.00 | $0.75 | $6.00 | $3.10 |
| 100 | Geotextile type HR (645.0120) | SY | 140 | $3.99 | $5.00 | $2.50 | $6.00 | $8.56 |
| 101 | Marking line epoxy 6-inch (646.2020) | LF | 6,240 | $0.60 | $0.60 | $0.70 | $0.60 | $0.70 |
| 102 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 6,945 | $1.56 | $1.56 | $1.60 | $1.56 | $1.60 |
| 103 | Marking outfall epoxy (646.5520) | EACH | 2 | $50.00 | $50.00 | $160.00 | $50.00 | $160.00 |
| 104 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 78 | $15.50 | $15.50 | $13.00 | $15.50 | $13.00 |
| 105 | Marking diagonal epoxy 12-inch (646.7120) | LF | 290 | $15.50 | $15.50 | $6.50 | $15.50 | $6.50 |
| 106 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 270 | $15.00 | $15.50 | $11.00 | $15.00 | $11.00 |
| 107 | Marking curb epoxy (646.8120) | LF | 220 | $7.50 | $7.50 | $5.50 | $7.50 | $5.50 |
| 108 | Marking island nose epoxy (646.8220) | EACH | 4 | $295.00 | $295.00 | $250.00 | $295.00 | $250.00 |
| 109 | Construction staking storm sewer (650.4000) | EACH | 30 | $42.31 | $42.31 | $42.31 | $42.31 | $42.31 |
| 110 | Construction staking subgrade (650.4500) | LF | 1,080 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 111 | Construction staking base (650.5000) | LF | 1,080 | $1.21 | $1.21 | $1.21 | $1.21 | $1.21 |
| 112 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 301 | $0.65 | $0.65 | $0.65 | $0.65 | $0.65 |
| 113 | Construction staking pipe culverts (650.6000) | EACH | 3 | $106.09 | $106.09 | $106.09 | $106.09 | $106.90 |
| 114 | Construction staking electrical installations (project) 01. 6430-24- 71 (650.8501) | EACH | 1 | $1,310.68 | $1,310.68 | $1,310.68 | $1,310.68 | $1,310.68 |
| 115 | Construction staking sidewalk (project) 01. 6430-24-71 (650.9500) | EACH | 1 | $1,740.70 | $1,740.70 | $1,740.70 | $1,740.70 | $1,740.70 |
| 116 | Construction staking supplemental control (project) 01. 6430-24-71 (650.9911) | EACH | 1 | $422.81 | $422.81 | $422.81 | $422.81 | $422.81 |
| 117 | Construction staking slope stakes (650.9920) | LF | 1,080 | $0.84 | $0.84 | $0.84 | $0.84 | $0.84 |
| 118 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,790 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 119 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 8 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 |
| 120 | Concrete bases type 5 (654.0105) | EACH | 18 | $1,775.00 | $1,775.00 | $1,775.00 | $1,775.00 | $1,775.00 |
| 121 | Concrete control cabinet bases type 10 (654.0220) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 122 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,700 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 123 | Electrical wire lighting 10 AWG (655.0615) | LF | 7,700 | $0.90 | $0.90 | $0.90 | $0.90 | $0.90 |
| 124 | Electrical service meter breaker pedestal (location) 01. STH 76 & larsen road (656.0201) | EACH | 1 | $1,900.00 | $1,900.00 | $1,900.00 | $1,900.00 | $1,900.00 |
| 125 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 18 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 126 | Poles type 5-aluminum (657.0322) | EACH | 18 | $1,650.00 | $1,650.00 | $1,650.00 | $1,650.00 | $1,650.00 |
| 127 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 18 | $625.00 | $625.00 | $625.00 | $625.00 | $625.00 |
| 128 | Luminaires utility LED A (659.1115) | EACH | 18 | $350.00 | $350.00 | $350.00 | $350.00 | $350.00 |
| 129 | Sawing asphalt (690.0150) | LF | 154 | $1.95 | $1.95 | $1.95 | $1.95 | $1.95 |
| 130 | Sawing concrete (690.0250) | LF | 42 | $2.35 | $2.35 | $2.35 | $2.35 | $2.35 |
| 131 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 132 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 133 | Special 01. foundation backfill (SPV.0035) | CY | 130 | $32.32 | $35.00 | $30.60 | $32.00 | $44.38 |
| 134 | Special 01. construction staking roundabout (SPV.0060) | EACH | 1 | $6,650.00 | $6,650.00 | $6,650.00 | $6,650.00 | $6,650.00 |
| 135 | Special 02. inlets 4-FT diameter, special (SPV.0060) | EACH | 2 | $3,458.59 | $3,868.00 | $3,424.00 | $3,424.00 | $3,147.00 |
| 136 | Special 03. removing sign, foundation and landscaping - parcel 6 (SPV.0060) | EACH | 1 | $1,713.99 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 |
| 137 | Special 01. seeding low maintenance fescue (SPV.0085) | LB | 25 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 138 | Special 01. concrete curb & gutter 30-inch type D modified (SPV.0090) | LF | 2,597 | $20.45 | $19.15 | $20.45 | $20.45 | $20.45 |
| 139 | Special 02. concrete curb & gutter 4-inch sloped 36-inch type A modified (SPV.0090) | LF | 178 | $24.40 | $27.00 | $24.40 | $24.40 | $24.40 |
| 140 | Special 03. concrete curb & gutter 4-inch sloped 36-inch type D modified (SPV.0090) | LF | 1,000 | $24.40 | $23.95 | $24.40 | $24.40 | $24.40 |
| 141 | Special 04. concrete curb & gutter 4-inch sloped 36-inch type R modified (SPV.0090) | LF | 318 | $24.40 | $24.00 | $24.40 | $24.40 | $24.40 |
| 142 | Special 01. traffic bond limestone 3/8-inch (SPV.0195) | TON | 53 | $44.36 | $40.00 | $38.00 | $40.00 | $35.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.