WisDOT contract 20250513039 bid tabulation

V Grantsburg, E James & S Johnson; S Robert St to STH 70 (LOC STR, Burnett County V Grantsburg, E James & S Johnson). Let by Wisconsin DOT on May 13, 2025, Burnett. 1 bid received; low bid $653,100 by McCabe Construction, Inc..

Owner
Wisconsin DOT
Letting
13 MAY 2025
Pay items
68
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1McCabe Construction, Inc.$653,100Low
WisDOT contract 20250513039: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. McCabe Construction, Inc.
1Removing asphaltic surface (204.0110)SY7,815$4.00
2Removing curb & gutter (204.0150)LF2,425$7.50
3Removing concrete sidewalk (204.0155)SY610$12.00
4Excavation common (205.0100)CY500$41.50
5Prepare foundation for asphaltic paving (project) 01. 8364-00-70 (211.0101)EACH1$21,100
6Finishing roadway (project) 01. 8364-00-70 (213.0100)EACH1$2,500.00
7Base aggregate dense 3/4-inch (305.0110)TON300$40.00
8Base aggregate dense 1 1/4-inch (305.0120)TON400$40.00
9HMA cold weather paving (450.4000)TON50$3.97
10Tack coat (455.0605)GAL455$4.38
11Incentive density HMA pavement (460.2000)DOL1,150$1.00
12HMA pavement 3 MT 58-28 S (460.6223)TON1,000$101.54
13HMA pavement 4 MT 58-34 S (460.6244)TON800$118.92
14Asphaltic surface (465.0105)TON50$181.11
15Asphaltic surface driveways and field entrances (465.0120)TON80$181.11
16Concrete curb & gutter 30-inch type D (601.0411)LF2,385$21.93
17Concrete sidewalk 4-inch (602.0405)SF6,550$7.79
18Curb ramp detectable warning field radial natural patina (602.0615)SF85$64.04
19Concrete driveway 6-inch (602.0810)SY20$90.24
20Reconstructing inlets (611.0430)EACH2$1,020.00
21Adjusting manhole covers (611.8110)EACH2$800.00
22Adjusting inlet covers (611.8115)EACH2$610.00
23Maintenance and repair of haul roads (project) 01. 8364-00-70 (618.0100)EACH1$1.00
24Mobilization (619.1000)EACH1$82,004
25Water (624.0100)MGAL100$42.00
26Topsoil (625.0100)SY1,500$10.00
27Silt fence (628.1504)LF700$2.60
28Silt fence maintenance (628.1520)LF700$0.02
29Mobilizations erosion control (628.1905)EACH2$446.33
30Mobilizations emergency erosion control (628.1910)EACH2$131.27
31Erosion mat urban class I type B (628.2008)SY1,500$2.68
32Inlet protection type A (628.7005)EACH4$126.02
33Inlet protection type C (628.7015)EACH4$77.71
34Temporary ditch checks (628.7504)LF20$13.65
35Rock bags (628.7570)EACH40$16.80
36Fertilizer type B (629.0210)CWT1$103.97
37Seeding mixture no. 40 (630.0140)LB60$12.60
38Seeding temporary (630.0200)LB30$4.20
39Moving signs type II (638.2102)EACH3$162.78
40Moving small sign supports (638.4000)EACH3$141.77
41Field office type B (642.5001)EACH1$7,500.00
42Traffic control drums (643.0300)DAY1,200$0.47
43Traffic control barricades type II (643.0410)EACH400$0.53
44Traffic control barricades type III (643.0420)DAY200$0.79
45Traffic control warning lights type A (643.0705)DAY200$0.53
46Traffic control signs (643.0900)DAY1,250$0.26
47Temporary marking line removable tape 4-inch (643.3150)LF200$1.94
48Temporary marking line removable tape 6-inch (643.3180)LF100$2.68
49Traffic control (643.5000)EACH1$12,166
50Temporary pedestrian surface matting (644.1440)SF3,800$2.84
51Temporary pedestrian curb ramp (644.1601)DAY80$14.18
52Temporary pedestrian barricade (644.1810)LF900$3.68
53Geotextile type sas (645.0140)SY100$8.00
54Marking line same day epoxy 6- inch (646.4720)LF3,800$1.94
55Marking stop line epoxy 18-inch (646.6120)LF30$13.65
56Marking crosswalk epoxy transverse line 6-inch (646.7420)LF440$14.70
57Marking curb epoxy (646.8120)LF150$8.66
58Construction staking base (650.5000)LF1,990$0.79
59Construction staking curb gutter and curb & gutter (650.5500)LF2,385$1.58
60Construction staking curb ramps (650.9000)EACH4$210.04
61Construction staking sidewalk (project) 01. 8364-00-70 (650.9500)EACH1$1,050.18
62Construction staking supplemental control (project) 01. 8364-00-70 (650.9911)EACH1$2,100.37
63Construction staking slope stakes (650.9920)LF1,990$1.31
64Sawing asphalt (690.0150)LF500$2.05
65Sawing concrete (690.0250)LF40$3.10
66On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00
67On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00
68Special 01. adjust existing gate valve box (SPV.0060)EACH6$625.00
WisDOT contract 20250513039: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy