WisDOT contract 20250513042 bid tabulation

V Rib Lake, State Road; B-60-0181 (LOC STR, Taylor County V Rib Lake, State Road). Let by Wisconsin DOT on May 13, 2025, Taylor. 2 bids received.

Owner
Wisconsin DOT
Letting
13 MAY 2025
Pay items
63
Data through
10 NOV 2026

1 of the 2 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
2Lunda Construction Company$758,821+26%
WisDOT contract 20250513042: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lunda Construction Company
1Clearing (201.0105)STA4$1.00
2Grubbing (201.0205)STA4$1.00
3Removing structure over waterway remove debris (structure) 01. P-60- 702 (203.0250)EACH1$98,000
4Removing asphaltic surface (204.0110)SY773$2.50
5Excavation common (205.0100)CY138$17.65
6Excavation for structures bridges (structure) 01. B-60-181 (206.1001)EACH1$33,000
7Cofferdams (structure) 01. B-60-181 (206.5001)EACH1$70,000
8Borrow (208.0100)CY121$23.65
9Backfill structure type A (210.1500)TON1,047$25.75
10Finishing roadway (project) 01. 9545-00-72 (213.0100)EACH1$696.00
11Base aggregate dense 3/4-inch (305.0110)TON90$26.00
12Base aggregate dense 1 1/4-inch (305.0120)TON560$22.50
13Tack coat (455.0605)GAL54$14.30
14Asphaltic surface (465.0105)TON240$149.45
15Concrete masonry bridges (502.0100)CY186$900.00
16Protective surface treatment (502.3200)SY233$6.00
17Bar steel reinforcement HS structures (505.0400)LB4,120$1.24
18Bar steel reinforcement HS coated structures (505.0600)LB24,290$1.28
19Railing tubular type M (513.4061)LF109$325.00
20Rubberized membrane waterproofing (516.0500)SY12$25.00
21Piling cip concrete 12 3/4 X 0.375- inch (550.2126)LF990$58.00
22Riprap heavy (606.0300)CY70$100.00
23Pipe underdrain wrapped 6-inch (612.0406)LF140$8.00
24Maintenance and repair of haul roads (project) 01. 9545-00-72 (618.0100)EACH1$1.00
25Mobilization (619.1000)EACH1$111,185
26Water (624.0100)MGAL14$1.00
27Topsoil (625.0100)SY960$5.20
28Silt fence (628.1504)LF700$2.40
29Silt fence maintenance (628.1520)LF700$0.01
30Mobilizations erosion control (628.1905)EACH4$450.00
31Mobilizations emergency erosion control (628.1910)EACH2$50.00
32Erosion mat urban class I type B (628.2008)SY960$2.40
33Turbidity barriers (628.6005)SY130$50.75
34Temporary ditch checks (628.7504)LF20$7.55
35Rock bags (628.7570)EACH85$18.18
36Fertilizer type B (629.0210)CWT4$227.50
37Seeding mixture no. 20 (630.0120)LB45$18.00
38Seeding temporary (630.0200)LB28$8.60
39Seed water (630.0500)MGAL19$0.50
40Posts wood 4X6-inch X 12-FT (634.0612)EACH4$90.75
41Posts wood 4X6-inch X 14-FT (634.0614)EACH1$96.75
42Signs type II reflective H (637.2210)SF5$30.95
43Signs type II reflective F (637.2230)SF12$31.75
44Removing signs type II (638.2602)EACH7$22.65
45Removing small sign supports (638.3000)EACH7$22.65
46Field office type B (642.5001)EACH1$3,250.00
47Traffic control barricades type III (643.0420)DAY1,300$0.75
48Traffic control warning lights type A (643.0705)DAY1,900$0.25
49Traffic control signs (643.0900)DAY1,000$0.35
50Traffic control (643.5000)EACH1$5,525.00
51Geotextile type DF schedule A (645.0111)SY537$5.90
52Geotextile type HR (645.0120)SY177$7.00
53Construction staking subgrade (650.4500)LF293$0.75
54Construction staking base (650.5000)LF293$1.00
55Construction staking structure layout (structure) 01. B-60-181 (650.6501)EACH1$2,350.00
56Construction staking supplemental control (project) 01. 9545-00-72 (650.9911)EACH1$363.25
57Construction staking slope stakes (650.9920)LF293$3.00
58Sawing asphalt (690.0150)LF62$2.35
59Incentive strength concrete structures (715.0502)DOL1,116$1.00
60Maintaining bird deterrent system (station) 01. station 10+00 (999.2005.S)EACH1$0.01
61On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00
62On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00
63Special 01. flashing stainless steel (SPV.0090)LF95$85.00
WisDOT contract 20250513042: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.