WisDOT contract 20250610008 bid tabulation
Vilas County Culvert Replacement; STH 17 Countywide (STH 017, Vilas County Vilas County Culvert Replacement). Let by Wisconsin DOT on June 10, 2025, Vilas. 3 bids received; low bid $1,089,387 by Pitlik & Wick, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 JUN 2025
- Pay items
- 64
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pitlik & Wick, Inc. | $1,089,387 | Low |
| 2 | Musson Bros., Inc. | $1,238,349 | +14% |
| 3 | James Peterson Sons, Inc. | $1,588,014 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pitlik & Wick, Inc. | 2. Musson Bros., Inc. | 3. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 2 | $1,000.00 | $697.80 | $1,000.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 15 | $500.00 | $2,000.00 | $750.00 |
| 3 | Removing delineators and markers (204.0180) | EACH | 30 | $10.00 | $20.00 | $10.00 |
| 4 | Excavation common (205.0100) | CY | 6,400 | $10.00 | $18.45 | $12.00 |
| 5 | Cofferdams (structure) 01. C63017003945 (206.5001) | EACH | 1 | $1,500.00 | $1.00 | $5,000.00 |
| 6 | Cofferdams (structure) 02. C63017003947 (206.5001) | EACH | 1 | $1,500.00 | $1.00 | $5,000.00 |
| 7 | Temporary lane shift during culvert work (208.1500.S) | EACH | 26 | $2,100.00 | $2,500.00 | $9,000.00 |
| 8 | Finishing roadway (project) 01. 1009-43-66 (213.0100) | EACH | 1 | $4,500.00 | $500.00 | $1,500.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 382 | $45.00 | $53.38 | $54.61 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 6,070 | $15.00 | $30.83 | $46.61 |
| 11 | Select crushed material (312.0110) | TON | 470 | $15.00 | $32.76 | $52.41 |
| 12 | Subbase (350.0104) | TON | 1,760 | $15.00 | $12.49 | $59.75 |
| 13 | Tack coat (455.0605) | GAL | 445 | $5.50 | $12.25 | $12.87 |
| 14 | Asphaltic surface (465.0105) | TON | 1,410 | $149.00 | $138.04 | $144.95 |
| 15 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 2 | $600.00 | $1,000.00 | $467.77 |
| 16 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 2 | $850.00 | $1,500.00 | $1,365.58 |
| 17 | Apron endwalls for culvert pipe 36- inch (520.1036) | EACH | 4 | $1,150.00 | $2,000.00 | $1,147.90 |
| 18 | Culvert pipe class III-A non-metal 24-inch (520.3424) | LF | 64 | $165.00 | $130.26 | $229.66 |
| 19 | Culvert pipe class III-A non-metal 36-inch (520.3436) | LF | 152 | $260.00 | $180.85 | $222.86 |
| 20 | Culvert pipe class III-B non-metal 30-inch (520.3630) | LF | 136 | $290.00 | $370.19 | $327.74 |
| 21 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 248 | $245.00 | $254.44 | $345.79 |
| 22 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 48 | $310.00 | $285.03 | $402.05 |
| 23 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 56 | $390.00 | $402.78 | $432.39 |
| 24 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 10 | $1,650.00 | $2,000.00 | $1,344.01 |
| 25 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $1,850.00 | $3,000.00 | $1,641.25 |
| 26 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 2 | $2,550.00 | $4,000.00 | $2,455.94 |
| 27 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 48X76-inch (522.2348) | LF | 64 | $600.00 | $805.03 | $651.44 |
| 28 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638) | EACH | 2 | $4,000.00 | $4,350.58 | $3,647.76 |
| 29 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 48X76-inch (522.2648) | EACH | 2 | $5,500.00 | $6,266.35 | $4,704.40 |
| 30 | Riprap medium (606.0200) | CY | 3 | $300.00 | $292.46 | $299.18 |
| 31 | Maintenance and repair of haul roads (project) 01. 1009-43-66 (618.0100) | EACH | 1 | $1,000.00 | $1.00 | $1.00 |
| 32 | Mobilization (619.1000) | EACH | 1 | $160,000 | $100,884 | $117,840 |
| 33 | Water (624.0100) | MGAL | 103 | $20.00 | $1.00 | $100.00 |
| 34 | Topsoil (625.0100) | SY | 5,200 | $2.00 | $0.36 | $2.77 |
| 35 | Silt fence (628.1504) | LF | 6,230 | $3.13 | $3.13 | $2.63 |
| 36 | Silt fence maintenance (628.1520) | LF | 6,230 | $0.10 | $0.10 | $0.27 |
| 37 | Mobilizations erosion control (628.1905) | EACH | 8 | $250.00 | $250.00 | $420.00 |
| 38 | Mobilizations emergency erosion control (628.1910) | EACH | 8 | $250.00 | $250.00 | $420.00 |
| 39 | Erosion mat urban class I type B (628.2008) | SY | 5,720 | $2.99 | $2.99 | $2.37 |
| 40 | Temporary ditch checks (628.7504) | LF | 520 | $12.50 | $12.50 | $15.75 |
| 41 | Culvert pipe checks (628.7555) | EACH | 45 | $25.00 | $25.00 | $21.00 |
| 42 | Rock bags (628.7570) | EACH | 65 | $11.50 | $11.50 | $21.00 |
| 43 | Fertilizer type B (629.0210) | CWT | 5.30 | $110.00 | $110.00 | $105.00 |
| 44 | Seeding mixture no. 20 (630.0120) | LB | 301 | $7.10 | $7.10 | $10.50 |
| 45 | Seeding temporary (630.0200) | LB | 60 | $3.50 | $3.50 | $10.50 |
| 46 | Seed water (630.0500) | MGAL | 70 | $30.00 | $30.00 | $52.50 |
| 47 | Markers culvert end (633.5200) | EACH | 26 | $79.50 | $79.50 | $78.75 |
| 48 | Moving signs type II (638.2102) | EACH | 8 | $130.00 | $130.00 | $210.00 |
| 49 | Field office type B (642.5001) | EACH | 1 | $10,000 | $15,000 | $6,630.00 |
| 50 | Traffic control drums (643.0300) | DAY | 2,610 | $0.50 | $0.50 | $0.53 |
| 51 | Traffic control signs (643.0900) | DAY | 7,400 | $1.60 | $1.60 | $1.68 |
| 52 | Traffic control signs fixed message (643.1000) | SF | 54 | $11.10 | $11.10 | $11.66 |
| 53 | Traffic control (643.5000) | EACH | 1 | $2,400.00 | $2,400.00 | $2,520.00 |
| 54 | Geotextile type HR (645.0120) | SY | 11 | $10.00 | $10.96 | $6.73 |
| 55 | Geogrid type SR (645.0220) | SY | 1,480 | $1.00 | $2.65 | $3.89 |
| 56 | Marking line epoxy 6-inch (646.2020) | LF | 5,030 | $2.50 | $2.50 | $2.63 |
| 57 | Marking stop line epoxy 18-inch (646.6120) | LF | 20 | $20.00 | $20.00 | $21.00 |
| 58 | Construction staking pipe culverts (650.6000) | EACH | 13 | $310.00 | $310.00 | $325.50 |
| 59 | Construction staking supplemental control (project) 01. 1009-43-66 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.50 |
| 60 | Construction staking slope stakes (650.9920) | LF | 3,160 | $1.25 | $1.25 | $1.32 |
| 61 | Sawing asphalt (690.0150) | LF | 842 | $2.50 | $2.00 | $2.10 |
| 62 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 |
| 63 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 |
| 64 | Special 01.culvert pipe reinforced concrete horizontal elliptical class HE-IV 38X60-inch (SPV.0090) | LF | 52 | $580.00 | $850.00 | $605.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of June 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.