WisDOT contract 20250812001 bid tabulation
La Crosse - Sparta; Black Rvr, Round Lk, Bainbridge Brg (IH 090, La Crosse County La Crosse - Sparta). Let by Wisconsin DOT on August 12, 2025, La Crosse. 2 bids received; low bid $5,635,623 by Zenith Tech., Inc. - Waukesha.
- Owner
- Wisconsin DOT
- Letting
- 12 AUG 2025
- Pay items
- 108
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zenith Tech., Inc. - Waukesha | $5,635,623 | Low |
| 2 | Lunda Construction Company | $6,020,236 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zenith Tech., Inc. - Waukesha | 2. Lunda Construction Company |
|---|---|---|---|---|---|
| 1 | Removing structure (structure) 01. B-32-73 (203.0220) | EACH | 1 | $150,000 | $100,000 |
| 2 | Removing asphaltic surface milling (204.0120) | SY | 558 | $51.77 | $51.77 |
| 3 | Removing concrete sidewalk (204.0155) | SY | 243 | $7.64 | $7.64 |
| 4 | Removing fence (204.0170) | LF | 140 | $15.00 | $15.00 |
| 5 | Excavation common (205.0100) | CY | 89 | $35.97 | $35.97 |
| 6 | Excavation for structures bridges (structure) 01. B-32-73 (206.1001) | EACH | 1 | $5,000.00 | $15,000 |
| 7 | Backfill structure type A (210.1500) | TON | 40 | $51.60 | $50.00 |
| 8 | Finishing roadway (project) 01. 1070-04-64 (213.0100) | EACH | 1 | $500.00 | $2,000.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 26 | $73.61 | $73.61 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 106 | $20.14 | $20.14 |
| 11 | Tack coat (455.0605) | GAL | 92 | $12.83 | $12.83 |
| 12 | Asphaltic surface temporary (465.0125) | TON | 64 | $245.43 | $245.43 |
| 13 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 2,505 | $1.50 | $1.50 |
| 14 | Concrete masonry bridges (502.0100) | CY | 72 | $2,000.00 | $1,000.00 |
| 15 | Expansion device (502.3101) | LF | 312 | $400.00 | $325.00 |
| 16 | Protective surface treatment (502.3200) | SY | 9,503 | $4.00 | $3.00 |
| 17 | Pigmented surface sealer (502.3210) | SY | 40 | $30.00 | $10.00 |
| 18 | Adhesive anchors 1 1/4-inch (502.4110) | EACH | 8 | $200.00 | $250.00 |
| 19 | Adhesive anchors no. 5 bar (502.4205) | EACH | 412 | $30.00 | $5.00 |
| 20 | Bar steel reinforcement HS coated structures (505.0600) | LB | 21,800 | $3.05 | $2.50 |
| 21 | Bar couplers no. 5 (505.0905) | EACH | 48 | $85.00 | $35.00 |
| 22 | Structural steel HS (506.0605) | LB | 27,572 | $22.50 | $16.00 |
| 23 | Bearing assemblies expansion (structure) 01. B-32-73 (506.6000) | EACH | 4 | $3,500.00 | $3,000.00 |
| 24 | Removing bearings (structure) 01. B-32-73 (506.7050.S) | EACH | 4 | $1,500.00 | $1,500.00 |
| 25 | Preparation decks type 1 (509.0301) | SY | 60 | $275.00 | $150.00 |
| 26 | Preparation decks type 2 (509.0302) | SY | 24 | $400.00 | $175.00 |
| 27 | Cleaning decks (509.0500) | SY | 8,904 | $30.00 | $16.95 |
| 28 | Joint repair (509.1000) | SY | 136 | $1,750.00 | $1,750.00 |
| 29 | Concrete surface repair (509.1500) | SF | 500 | $180.00 | $150.00 |
| 30 | Full-depth deck repair (509.2000) | SY | 4 | $1,000.00 | $500.00 |
| 31 | Concrete masonry overlay decks (509.2500) | CY | 560 | $975.00 | $1,500.00 |
| 32 | Rubberized membrane waterproofing (516.0500) | SY | 8 | $50.00 | $20.00 |
| 33 | Preparation and coating of top flanges (structure) 01. B-32-73 (517.0901.S) | EACH | 1 | $20,000 | $20,000 |
| 34 | Structure repainting recycled abrasive (structure) 01. B-32-34 (517.1801.S) | EACH | 1 | $305,000 | $305,000 |
| 35 | Structure repainting recycled abrasive (structure) 02. B-32-35 (517.1801.S) | EACH | 1 | $305,000 | $305,000 |
| 36 | Structure repainting recycled abrasive (structure) 03. B-32-46 (517.1801.S) | EACH | 1 | $305,000 | $305,000 |
| 37 | Structure repainting recycled abrasive (structure) 04. B-32-47 (517.1801.S) | EACH | 1 | $305,000 | $305,000 |
| 38 | Structure repainting recycled abrasive (structure) 05. B-32-73 (517.1801.S) | EACH | 1 | $72,000 | $72,000 |
| 39 | Negative pressure containment and collection of waste materials (structure) 01. B-32-34 (517.4501.S) | EACH | 1 | $65,000 | $65,000 |
| 40 | Negative pressure containment and collection of waste materials (structure) 02. B-32-35 (517.4501.S) | EACH | 1 | $65,000 | $65,000 |
| 41 | Negative pressure containment and collection of waste materials (structure) 03. B-32-46 (517.4501.S) | EACH | 1 | $65,000 | $65,000 |
| 42 | Negative pressure containment and collection of waste materials (structure) 04. B-32-47 (517.4501.S) | EACH | 1 | $65,000 | $65,000 |
| 43 | Negative pressure containment and collection of waste materials (structure) 05. B-32-73 (517.4501.S) | EACH | 1 | $15,000 | $15,000 |
| 44 | Portable decontamination facility (517.6001.S) | EACH | 5 | $4,000.00 | $4,000.00 |
| 45 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 2 | $697.15 | $697.15 |
| 46 | Culvert pipe corrugated polypropylene 12-inch (530.1112) | LF | 66 | $93.85 | $93.85 |
| 47 | Concrete curb type G (601.0115) | LF | 20 | $70.87 | $70.87 |
| 48 | Concrete sidewalk 6-inch (602.0415) | SF | 2,176 | $10.38 | $10.38 |
| 49 | Concrete barrier temporary precast delivered (603.8000) | LF | 6,160 | $11.00 | $11.00 |
| 50 | Concrete barrier temporary precast installed (603.8125) | LF | 11,280 | $3.95 | $3.95 |
| 51 | Riprap medium (606.0200) | CY | 3.60 | $378.44 | $378.44 |
| 52 | Inlet covers type H (611.0624) | EACH | 4 | $1,129.58 | $1,129.58 |
| 53 | Inlets 2X3-FT (611.3230) | EACH | 4 | $1,627.75 | $1,627.75 |
| 54 | Fence chain link 6-FT (616.0206) | LF | 140 | $60.50 | $40.00 |
| 55 | Maintenance and repair of haul roads (project) 01. 1070-04-64 (618.0100) | EACH | 1 | $250.00 | $0.01 |
| 56 | Mobilization (619.1000) | EACH | 1 | $640,000 | $1,211,182 |
| 57 | Water (624.0100) | MGAL | 2 | $37.56 | $37.56 |
| 58 | Topsoil (625.0100) | SY | 10 | $53.91 | $53.91 |
| 59 | Silt fence (628.1504) | LF | 185 | $3.00 | $3.00 |
| 60 | Silt fence maintenance (628.1520) | LF | 185 | $0.08 | $0.08 |
| 61 | Mobilizations erosion control (628.1905) | EACH | 3 | $475.00 | $475.00 |
| 62 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $100.00 |
| 63 | Erosion mat class I type A (628.2002) | SY | 417 | $2.40 | $2.40 |
| 64 | Inlet protection type C (628.7015) | EACH | 4 | $72.00 | $72.00 |
| 65 | Temporary ditch checks (628.7504) | LF | 32 | $8.95 | $8.95 |
| 66 | Fertilizer type B (629.0210) | CWT | 0.30 | $110.00 | $110.00 |
| 67 | Seeding mixture no. 40 (630.0140) | LB | 7.80 | $15.00 | $15.00 |
| 68 | Seeding temporary (630.0200) | LB | 11.20 | $3.55 | $3.55 |
| 69 | Seed water (630.0500) | MGAL | 9.80 | $40.00 | $40.00 |
| 70 | Markers culvert end (633.5200) | EACH | 2 | $71.00 | $71.00 |
| 71 | Field office type B (642.5001) | EACH | 1 | $10,000 | $6,000.00 |
| 72 | Traffic control drums (643.0300) | DAY | 48,046 | $0.20 | $0.20 |
| 73 | Traffic control barricades type III (643.0420) | DAY | 2,215 | $0.60 | $0.60 |
| 74 | Traffic control warning lights type A (643.0705) | DAY | 3,978 | $0.18 | $0.18 |
| 75 | Traffic control warning lights type C (643.0715) | DAY | 12,936 | $0.18 | $0.18 |
| 76 | Traffic control arrow boards (643.0800) | DAY | 452 | $7.25 | $7.25 |
| 77 | Traffic control signs (643.0900) | DAY | 15,142 | $0.25 | $0.25 |
| 78 | Traffic control covering signs type I (643.0910) | EACH | 1 | $300.00 | $300.00 |
| 79 | Traffic control covering signs type II (643.0920) | EACH | 4 | $150.00 | $150.00 |
| 80 | Traffic control signs PCMS (643.1050) | DAY | 20 | $45.00 | $45.00 |
| 81 | Basic traffic queue warning system (643.1205.S) | DAY | 226 | $79.50 | $79.50 |
| 82 | Temporary marking line removable tape 6-inch (643.3180) | LF | 115,944 | $1.95 | $1.95 |
| 83 | Temporary marking line removable tape 10-inch (643.3280) | LF | 8,200 | $3.60 | $3.60 |
| 84 | Traffic control interim lane closure (643.4100) | EACH | 8 | $1,075.00 | $1,075.00 |
| 85 | Traffic control (643.5000) | EACH | 1 | $42,115 | $42,115 |
| 86 | Geotextile type HR (645.0120) | SY | 17 | $46.06 | $46.06 |
| 87 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 1,274 | $0.99 | $0.99 |
| 88 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 32,654 | $1.63 | $1.63 |
| 89 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 3,409 | $3.24 | $3.24 |
| 90 | Marking removal line 6-inch (646.9002) | LF | 30,036 | $0.35 | $0.35 |
| 91 | Marking removal line 10-inch (646.9102) | LF | 3,346 | $0.90 | $0.90 |
| 92 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 20 | $3.00 | $1.00 |
| 93 | Construction staking pipe culverts (650.6000) | EACH | 2 | $500.00 | $325.00 |
| 94 | Construction staking sidewalk (project) 01. 1070-04-64 (650.9500) | EACH | 1 | $1,850.00 | $2,100.00 |
| 95 | Construction staking supplemental control (project) 01. 1070-04-64 (650.9911) | EACH | 1 | $750.00 | $750.00 |
| 96 | Construction staking slope stakes (650.9920) | LF | 263 | $1.00 | $8.00 |
| 97 | Incentive strength concrete structures (715.0502) | DOL | 1,000 | $1.00 | $1.00 |
| 98 | Installing and maintaining bird deterrent system (station) 01. 69+25 (999.2000.S) | EACH | 1 | $10,000 | $0.01 |
| 99 | Installing and maintaining bird deterrent system (station) 02. 69+25A (999.2000.S) | EACH | 1 | $10,000 | $0.01 |
| 100 | Installing and maintaining bird deterrent system (station) 03. 171+50 (999.2000.S) | EACH | 1 | $10,000 | $0.01 |
| 101 | Installing and maintaining bird deterrent system (station) 04. 171+50A (999.2000.S) | EACH | 1 | $10,000 | $0.01 |
| 102 | Installing and maintaining bird deterrent system (station) 05. 10+50B (999.2000.S) | EACH | 1 | $2,000.00 | $0.01 |
| 103 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 |
| 104 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,200 | $5.00 | $5.00 |
| 105 | Special 01. fence chain link 10-FT. B-32-73 (SPV.0090) | LF | 530 | $308.00 | $325.00 |
| 106 | Special 02. fill and restore existing concrete rumble strips (SPV.0090) | LF | 16,375 | $3.25 | $3.23 |
| 107 | Special 03. fence chain link 4-FT with railing (SPV.0090) | LF | 411 | $140.00 | $255.00 |
| 108 | Special 04. fence chain link 6-FT with railing (SPV.0090) | LF | 61 | $160.00 | $275.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.