| 1 | Removing structure (structure) 01. C-66-153 (203.0220) | EACH | 1 | $8,000.00 | $8,000.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 283 | $10.00 | $10.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 1,954 | $8.99 | $8.99 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 503 | $14.30 | $9.25 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 185,597 | $0.40 | $2.20 |
| 6 | Removing curb & gutter (204.0150) | LF | 91 | $14.43 | $15.00 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 45 | $23.62 | $23.62 |
| 8 | Removing guardrail (204.0165) | LF | 3,417 | $1.50 | $1.50 |
| 9 | Excavation common (205.0100) | CY | 312 | $19.35 | $19.35 |
| 10 | Backfill controlled low strength (209.0200.S) | CY | 5 | $385.00 | $385.00 |
| 11 | Backfill granular grade 2 (209.2100) | CY | 292 | $44.80 | $44.80 |
| 12 | Prepare foundation for asphaltic paving (project) 01. 4010-18-70 (211.0101) | EACH | 1 | $23,480 | $20,224 |
| 13 | Finishing roadway (project) 01. 4010-18-70 (213.0100) | EACH | 1 | $1,500.00 | $5,040.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,815 | $23.90 | $40.25 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,142 | $28.07 | $28.07 |
| 16 | Asphaltic base widening (315.0200) | TON | 132 | $169.80 | $222.00 |
| 17 | Tack coat (455.0605) | GAL | 13,368 | $3.00 | $3.00 |
| 18 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $2,470.00 | $3,120.00 |
| 19 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,560.00 | $3,850.00 |
| 20 | Incentive density PWL HMA pavement (460.2005) | DOL | 14,013 | $1.00 | $1.00 |
| 21 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 21,732 | $1.00 | $1.00 |
| 22 | Incentive air voids HMA pavement (460.2010) | DOL | 23,081 | $1.00 | $1.00 |
| 23 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 23,081 | $63.90 | $77.75 |
| 24 | HMA pavement 3 MT 58-34 S (460.6243) | TON | 107 | $99.30 | $97.76 |
| 25 | Asphaltic surface (465.0105) | TON | 49 | $179.80 | $235.50 |
| 26 | Asphaltic flumes (465.0315) | SY | 9 | $62.40 | $80.00 |
| 27 | Asphaltic rumble strips, shoulder (465.0520) | LF | 55,416 | $0.30 | $0.14 |
| 28 | Asphaltic rumble strips, centerline (465.0560) | LF | 27,820 | $0.32 | $0.18 |
| 29 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 1 | $1,590.48 | $1,590.48 |
| 30 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $2,004.07 | $2,004.07 |
| 31 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 10 | $67.39 | $250.00 |
| 32 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 32 | $68.69 | $165.00 |
| 33 | Concrete sidewalk 5-inch (602.0410) | SF | 392 | $12.12 | $27.65 |
| 34 | Curb ramp detectable warning field yellow (602.0505) | SF | 20 | $33.76 | $55.00 |
| 35 | Riprap medium (606.0200) | CY | 2 | $284.00 | $284.00 |
| 36 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 83 | $130.13 | $130.13 |
| 37 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 72 | $125.48 | $125.48 |
| 38 | Manhole covers type J (611.0530) | EACH | 1 | $517.78 | $517.78 |
| 39 | Inlet covers type H (611.0624) | EACH | 1 | $741.44 | $741.44 |
| 40 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $4,649.86 | $4,649.86 |
| 41 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $4,827.93 | $4,827.93 |
| 42 | Barrier system grading shaping finishing (614.0010) | EACH | 11 | $7,000.00 | $6,875.00 |
| 43 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 4 | $4,100.00 | $4,100.00 |
| 44 | Guardrail mow strip asphalt (614.0396) | SY | 1,512 | $35.80 | $59.35 |
| 45 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 226 | $40.30 | $25.70 |
| 46 | Adjusting steel plate beam guard (614.0400) | LF | 1,576 | $9.40 | $9.40 |
| 47 | Replacing guardrail posts and blocks (614.0950) | EACH | 24 | $100.00 | $100.00 |
| 48 | Replacing guardrail rail and hardware (614.0951) | LF | 425 | $17.90 | $17.90 |
| 49 | Replacing guardrail reflectors (614.0952) | EACH | 100 | $30.50 | $30.50 |
| 50 | MGS guardrail 3 K (614.2330) | LF | 2,801 | $37.00 | $37.00 |
| 51 | MGS guardrail terminal eat (614.2610) | EACH | 14 | $3,500.00 | $3,500.00 |
| 52 | Maintenance and repair of haul roads (project) 01. 4010-18-70 (618.0100) | EACH | 1 | $1.00 | $260.00 |
| 53 | Mobilization (619.1000) | EACH | 1 | $153,400 | $124,000 |
| 54 | Water (624.0100) | MGAL | 1 | $295.00 | $250.00 |
| 55 | Topsoil (625.0100) | SY | 56 | $20.00 | $20.00 |
| 56 | Salvaged topsoil (625.0500) | SY | 367 | $4.00 | $4.00 |
| 57 | Mulching (627.0200) | SY | 423 | $0.75 | $0.75 |
| 58 | Silt fence (628.1504) | LF | 3,925 | $1.70 | $1.70 |
| 59 | Silt fence maintenance (628.1520) | LF | 1,900 | $0.05 | $0.05 |
| 60 | Mobilizations erosion control (628.1905) | EACH | 4 | $100.00 | $100.00 |
| 61 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $75.00 | $75.00 |
| 62 | Erosion mat class I type B (628.2004) | SY | 516 | $1.80 | $1.80 |
| 63 | Inlet protection type A (628.7005) | EACH | 4 | $90.00 | $90.00 |
| 64 | Inlet protection type B (628.7010) | EACH | 6 | $35.00 | $35.00 |
| 65 | Inlet protection type C (628.7015) | EACH | 8 | $35.00 | $35.00 |
| 66 | Inlet protection type D (628.7020) | EACH | 2 | $90.00 | $90.00 |
| 67 | Temporary ditch checks (628.7504) | LF | 140 | $7.25 | $7.25 |
| 68 | Culvert pipe checks (628.7555) | EACH | 12 | $35.00 | $35.00 |
| 69 | Fertilizer type B (629.0210) | CWT | 26.70 | $79.00 | $79.00 |
| 70 | Seeding mixture no. 30 (630.0130) | LB | 21 | $10.90 | $10.90 |
| 71 | Seed water (630.0500) | MGAL | 7.20 | $45.00 | $45.00 |
| 72 | Trees (species, root, size) 01. trautman juniper, 24-inch root (632.0101) | EACH | 80 | $70.00 | $70.00 |
| 73 | Shrubs (species, root, size) 01. shrubs snow drift control deciduous 12 to 18-inch root (632.0201) | EACH | 2,714 | $15.10 | $15.10 |
| 74 | Landscape planting surveillance and care cycles (632.9101) | EACH | 24 | $150.00 | $150.00 |
| 75 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 113 | $88.10 | $88.10 |
| 76 | Signs type II reflective H (637.2210) | SF | 549.36 | $21.95 | $21.95 |
| 77 | Signs type II reflective F (637.2230) | SF | 52.61 | $23.90 | $23.90 |
| 78 | Moving signs type II (638.2102) | EACH | 12 | $95.00 | $95.00 |
| 79 | Removing signs type II (638.2602) | EACH | 50 | $17.00 | $17.00 |
| 80 | Removing small sign supports (638.3000) | EACH | 76 | $18.00 | $18.00 |
| 81 | Field office type D (642.5401) | EACH | 1 | $18,760 | $7,300.00 |
| 82 | Traffic control drums (643.0300) | DAY | 5,125 | $0.56 | $0.22 |
| 83 | Traffic control barricades type III (643.0420) | DAY | 1,601 | $1.25 | $0.62 |
| 84 | Traffic control warning lights type A (643.0705) | DAY | 3,202 | $0.26 | $0.10 |
| 85 | Traffic control arrow boards (643.0800) | DAY | 52 | $17.32 | $10.10 |
| 86 | Traffic control signs (643.0900) | DAY | 20,272 | $0.65 | $0.49 |
| 87 | Traffic control covering signs type II (643.0920) | EACH | 12 | $130.88 | $101.00 |
| 88 | Traffic control signs PCMS (643.1050) | DAY | 28 | $63.58 | $32.32 |
| 89 | Temporary marking raised pavement marker type II (643.3770) | EACH | 896 | $14.62 | $7.27 |
| 90 | Traffic control (643.5000) | EACH | 1 | $12,106 | $24,341 |
| 91 | Geotextile type DF schedule B (645.0112) | SY | 4,433 | $3.35 | $3.50 |
| 92 | Geotextile type HR (645.0120) | SY | 10 | $10.00 | $10.00 |
| 93 | Marking line epoxy 6-inch (646.2020) | LF | 1,554 | $0.68 | $0.68 |
| 94 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 162,609 | $1.18 | $1.18 |
| 95 | Marking line epoxy 10-inch (646.4020) | LF | 1,781 | $1.20 | $1.20 |
| 96 | Marking arrow epoxy (646.5020) | EACH | 15 | $330.00 | $330.00 |
| 97 | Marking word epoxy (646.5120) | EACH | 5 | $400.00 | $400.00 |
| 98 | Marking stop line epoxy 18-inch (646.6120) | LF | 834 | $23.00 | $23.00 |
| 99 | Marking diagonal epoxy 12-inch (646.7120) | LF | 180 | $15.00 | $15.00 |
| 100 | Marking island nose epoxy (646.8220) | EACH | 1 | $335.00 | $335.00 |
| 101 | Construction staking storm sewer (650.4000) | EACH | 3 | $350.00 | $350.00 |
| 102 | Construction staking base (650.5000) | LF | 120 | $2.00 | $2.00 |
| 103 | Construction staking pipe culverts (650.6000) | EACH | 2 | $150.00 | $150.00 |
| 104 | Construction staking resurfacing reference (650.8000) | LF | 44,713 | $0.15 | $0.15 |
| 105 | Construction staking curb ramps (650.9000) | EACH | 2 | $500.00 | $500.00 |
| 106 | Construction staking supplemental control (project) 01. 4010-18-70 (650.9911) | EACH | 1 | $10.00 | $10.00 |
| 107 | Construction staking slope stakes (650.9920) | LF | 240 | $2.00 | $2.00 |
| 108 | Sawing asphalt (690.0150) | LF | 3,122 | $1.15 | $1.15 |
| 109 | Sawing concrete (690.0250) | LF | 235 | $2.45 | $2.45 |
| 110 | Incentive iri ride (740.0440) | DOL | 33,872 | $1.00 | $1.00 |
| 111 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,000 | $5.00 | $5.00 |
| 112 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,800 | $5.00 | $5.00 |