WisDOT contract 20250812012 bid tabulation
Algoma - Sturgeon Bay; CTH X - Center Road (STH 042, Door County Algoma - Sturgeon Bay, CTH X - Center Road). Let by Wisconsin DOT on August 12, 2025, Door. 3 bids received; low bid $785,088 by Relyco Plus, LLC.
- Owner
- Wisconsin DOT
- Letting
- 12 AUG 2025
- Pay items
- 72
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Relyco Plus, LLC | $785,088 | Low |
| 2 | Highway Landscapers, Inc. | $794,939 | +1.0% |
| 3 | Peters Concrete Company | $812,851 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Relyco Plus, LLC | 2. Highway Landscapers, Inc. | 3. Peters Concrete Company |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 3 | $740.00 | $800.00 | $1,000.00 |
| 2 | Removing structure (structure) 01. C-15-3254 (203.0220) | EACH | 1 | $7,875.00 | $10,100 | $12,600 |
| 3 | Removing structure (structure) 02. C-15-3252 (203.0220) | EACH | 1 | $9,180.00 | $15,250 | $13,750 |
| 4 | Removing concrete pavement (204.0100) | SY | 1,520 | $1.00 | $10.00 | $11.28 |
| 5 | Removing asphaltic surface (204.0110) | SY | 830 | $6.80 | $8.00 | $4.00 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 33 | $70.00 | $70.00 | $70.00 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 1,675 | $6.80 | $6.80 | $6.80 |
| 8 | Removing delineators and markers (204.0180) | EACH | 7 | $29.65 | $30.00 | $30.00 |
| 9 | Excavation common (205.0100) | CY | 1,162 | $21.47 | $33.00 | $31.85 |
| 10 | Borrow (208.0100) | CY | 889 | $0.01 | $1.00 | $1.00 |
| 11 | Prepare foundation for asphaltic paving (project) 01. 4430-22-71 (211.0101) | EACH | 1 | $9,135.00 | $9,135.00 | $9,135.00 |
| 12 | Finishing roadway (project) 01. 4430-22-71 (213.0100) | EACH | 1 | $1,000.00 | $500.00 | $2,000.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 545 | $28.85 | $34.75 | $29.40 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,715 | $15.35 | $20.75 | $17.90 |
| 15 | HMA cold weather paving (450.4000) | TON | 1,360 | $4.20 | $4.20 | $4.20 |
| 16 | Tack coat (455.0605) | GAL | 560 | $4.30 | $4.30 | $4.30 |
| 17 | Incentive density HMA pavement (460.2000) | DOL | 875 | $1.00 | $1.00 | $1.00 |
| 18 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 945 | $89.60 | $89.60 | $89.60 |
| 19 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 415 | $98.70 | $98.70 | $98.70 |
| 20 | Asphaltic rumble strips, centerline (465.0560) | LF | 1,145 | $4.50 | $4.50 | $4.00 |
| 21 | Riprap medium (606.0200) | CY | 85 | $95.00 | $105.00 | $60.00 |
| 22 | Salvaged rail (614.0920) | LF | 325 | $3.20 | $6.00 | $6.00 |
| 23 | Salvaged guardrail end treatments (614.0925) | EACH | 4 | $344.00 | $250.00 | $250.00 |
| 24 | Maintenance and repair of haul roads (project) 01. 4430-22-71 (618.0100) | EACH | 1 | $1.00 | $250.00 | $1.00 |
| 25 | Mobilization (619.1000) | EACH | 1 | $95,215 | $65,150 | $63,500 |
| 26 | Water (624.0100) | MGAL | 29 | $50.00 | $1.00 | $50.00 |
| 27 | Topsoil (625.0100) | SY | 765 | $7.70 | $0.01 | $4.00 |
| 28 | Salvaged topsoil (625.0500) | SY | 2,285 | $4.00 | $6.00 | $3.50 |
| 29 | Mulching (627.0200) | SY | 1,900 | $0.55 | $0.30 | $0.20 |
| 30 | Silt fence (628.1504) | LF | 735 | $2.55 | $4.00 | $4.00 |
| 31 | Silt fence maintenance (628.1520) | LF | 190 | $0.08 | $1.00 | $1.00 |
| 32 | Mobilizations erosion control (628.1905) | EACH | 4 | $420.00 | $250.00 | $250.00 |
| 33 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $350.00 | $1.00 | $1.00 |
| 34 | Erosion mat urban class I type B (628.2008) | SY | 2,975 | $2.39 | $3.00 | $3.00 |
| 35 | Erosion mat class II type C (628.2027) | SY | 490 | $3.80 | $4.50 | $4.50 |
| 36 | Temporary ditch checks (628.7504) | LF | 244 | $8.95 | $6.00 | $6.00 |
| 37 | Culvert pipe checks (628.7555) | EACH | 68 | $21.30 | $16.00 | $16.00 |
| 38 | Tracking pads (628.7560) | EACH | 6 | $0.01 | $1.00 | $100.00 |
| 39 | Rock bags (628.7570) | EACH | 38 | $14.00 | $18.00 | $18.00 |
| 40 | Fertilizer type B (629.0210) | CWT | 4.40 | $110.00 | $150.00 | $150.00 |
| 41 | Seeding mixture no. 30 (630.0130) | LB | 218 | $8.80 | $10.00 | $10.00 |
| 42 | Seeding borrow pit (630.0300) | LB | 27 | $10.00 | $5.00 | $5.00 |
| 43 | Seed water (630.0500) | MGAL | 78 | $1.00 | $0.01 | $0.01 |
| 44 | Markers culvert end (633.5200) | EACH | 4 | $71.00 | $100.00 | $100.00 |
| 45 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 1 | $129.00 | $300.00 | $300.00 |
| 46 | Signs type II reflective F (637.2230) | SF | 5.56 | $28.00 | $40.00 | $40.00 |
| 47 | Moving signs type II (638.2102) | EACH | 1 | $119.00 | $200.00 | $200.00 |
| 48 | Field office type B (642.5001) | EACH | 1 | $10,000 | $500.00 | $5,000.00 |
| 49 | Traffic control drums (643.0300) | DAY | 495 | $0.39 | $0.39 | $0.39 |
| 50 | Traffic control barricades type III (643.0420) | DAY | 1,566 | $0.97 | $0.97 | $0.97 |
| 51 | Traffic control warning lights type A (643.0705) | DAY | 2,340 | $0.24 | $0.24 | $0.24 |
| 52 | Traffic control signs (643.0900) | DAY | 5,067 | $1.05 | $1.05 | $1.05 |
| 53 | Traffic control covering signs type II (643.0920) | EACH | 2 | $25.00 | $25.00 | $25.00 |
| 54 | Traffic control signs fixed message (643.1000) | SF | 52 | $11.00 | $11.00 | $11.00 |
| 55 | Traffic control signs PCMS (643.1050) | DAY | 14 | $50.00 | $50.00 | $50.00 |
| 56 | Traffic control (643.5000) | EACH | 1 | $2,356.98 | $12,357 | $2,357.00 |
| 57 | Geotextile type HR (645.0120) | SY | 238 | $5.00 | $6.00 | $4.00 |
| 58 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 2,505 | $4.95 | $4.95 | $4.95 |
| 59 | Cold weather marking epoxy 6-inch (646.6466) | LF | 2,505 | $0.55 | $0.55 | $0.55 |
| 60 | Locating no-passing zones (648.0100) | MI | 1.07 | $4,000.00 | $4,000.00 | $4,000.00 |
| 61 | Construction staking subgrade (650.4500) | LF | 683 | $0.01 | $0.01 | $1.00 |
| 62 | Construction staking base (650.5000) | LF | 683 | $1.75 | $1.75 | $1.75 |
| 63 | Construction staking pipe culverts (650.6000) | EACH | 2 | $300.00 | $300.00 | $300.00 |
| 64 | Construction staking supplemental control (project) 01. 4430-22-71 (650.9911) | EACH | 1 | $633.96 | $633.96 | $634.00 |
| 65 | Construction staking slope stakes (650.9920) | LF | 1,145 | $1.25 | $1.25 | $1.25 |
| 66 | Sawing asphalt (690.0150) | LF | 125 | $2.75 | $8.00 | $2.75 |
| 67 | Sawing concrete (690.0250) | LF | 120 | $2.75 | $8.00 | $2.75 |
| 68 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 100 | $5.00 | $5.00 | $5.00 |
| 69 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 200 | $5.00 | $5.00 | $5.00 |
| 70 | Special 01. foundation backfill (SPV.0035) | CY | 708 | $30.70 | $38.00 | $32.95 |
| 71 | Special 01. apr endwalls for culvert pipe reinforce conc horiz elliptical 72X113-inch (SPV.0060) | EACH | 4 | $15,762 | $15,740 | $19,000 |
| 72 | Special 01. culvert pipe reinforce conc horiz elliptical CL HE-IV 72X113-inch (SPV.0090) | LF | 204 | $1,237.25 | $1,155.00 | $1,300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 12, 2025. Compiled by Mirage Metrics.