WisDOT contract 20250812016 bid tabulation
1058-22-60. Let by Wisconsin DOT on August 12, 2025, Shawano. 4 bids received; low bid $11,886,690 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 12 AUG 2025
- Pay items
- 134
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $11,886,690 | Low |
| 2 | Michels Road & Stone, Inc. | $13,422,235 | +13% |
| 3 | Chippewa Concrete Services, Inc. | $13,645,247 | +15% |
| 4 | Zignego Company, Inc. | $14,257,233 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Michels Road & Stone, Inc. | 3. Chippewa Concrete Services, Inc. | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 15,380 | $0.01 | $7.50 | $9.83 | $9.72 |
| 2 | Removing asphaltic surface (204.0110) | SY | 4,165 | $1.72 | $3.40 | $3.54 | $3.50 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 622 | $17.40 | $17.40 | $17.59 | $17.40 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 209,186 | $2.40 | $2.40 | $2.43 | $2.40 |
| 5 | Removing guardrail (204.0165) | LF | 3,983 | $2.25 | $2.25 | $2.27 | $2.25 |
| 6 | Removing delineators and markers (204.0180) | EACH | 458 | $10.00 | $10.00 | $10.11 | $10.00 |
| 7 | Removing masonry (204.0185) | CY | 3 | $400.00 | $990.00 | $303.30 | $500.00 |
| 8 | Removing surface drains (204.0190) | EACH | 4 | $250.00 | $750.00 | $404.40 | $400.00 |
| 9 | Removing (item description) 01. removing apron endwall (204.9060.S) | EACH | 3 | $317.50 | $750.00 | $505.50 | $500.00 |
| 10 | Removing (item description) 02. removing apron endwall for culvert pipe sloped cross drain concrete (204.9060.S) | EACH | 1 | $477.00 | $1,200.00 | $505.50 | $500.00 |
| 11 | Removing (item description) 03. removing apron endwalls for underdrain reinforced concrete 6- inch (204.9060.S) | EACH | 2 | $288.00 | $150.00 | $404.40 | $400.00 |
| 12 | Excavation common (205.0100) | CY | 13,305 | $14.58 | $25.00 | $17.03 | $16.84 |
| 13 | Backfill granular grade 2 (209.2500) | TON | 407 | $23.50 | $25.30 | $15.67 | $15.50 |
| 14 | Prepare foundation for concrete pavement (project) 01. 1058-22-60 (211.0201) | EACH | 1 | $1,000.00 | $5,000.00 | $7,582.50 | $1.00 |
| 15 | Prepare foundation for concrete pavement (project) 02. 1058-22-61 (211.0201) | EACH | 1 | $1,000.00 | $5,000.00 | $7,582.50 | $1.00 |
| 16 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 22 | $1,980.00 | $1,980.00 | $2,001.78 | $1,980.00 |
| 17 | Finishing roadway (project) 01. 1058-22-60 (213.0100) | EACH | 1 | $2,500.00 | $3,000.00 | $5,055.00 | $1,000.00 |
| 18 | Finishing roadway (project) 02. 1058-22-61 (213.0100) | EACH | 1 | $2,500.00 | $3,000.00 | $5,055.00 | $1,000.00 |
| 19 | Base aggregate dense 3/4-inch (305.0110) | TON | 15,820 | $23.25 | $24.30 | $28.76 | $28.45 |
| 20 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 14,070 | $12.10 | $20.30 | $25.65 | $25.37 |
| 21 | Base aggregate open-graded (310.0110) | TON | 660 | $23.50 | $20.00 | $29.57 | $29.25 |
| 22 | Select crushed material (312.0110) | TON | 4,600 | $24.50 | $20.60 | $24.14 | $23.88 |
| 23 | Concrete pavement 8-inch (415.0080) | SY | 169 | $84.30 | $88.94 | $137.47 | $100.00 |
| 24 | Concrete pavement 10-inch (415.0100) | SY | 15,315 | $58.71 | $83.29 | $76.71 | $65.09 |
| 25 | Rout and seal (415.6000.S) | LF | 365,914 | $0.65 | $0.73 | $0.89 | $0.73 |
| 26 | Drilled tie bars (416.0610) | EACH | 3,760 | $9.00 | $17.74 | $8.90 | $30.00 |
| 27 | Drilled dowel bars (416.0620) | EACH | 28,816 | $12.95 | $15.72 | $16.68 | $20.00 |
| 28 | Concrete pavement repair (416.1710) | SY | 14,761 | $78.60 | $101.81 | $97.01 | $113.00 |
| 29 | Concrete pavement replacement (416.1720) | SY | 18,042 | $81.10 | $99.16 | $97.01 | $113.00 |
| 30 | Continuous diamond grinding concrete pavement (420.1000) | SY | 57,693 | $4.49 | $6.50 | $6.57 | $6.50 |
| 31 | Tack coat (455.0605) | GAL | 12,681 | $3.20 | $3.20 | $3.24 | $3.20 |
| 32 | Incentive density HMA pavement (460.2000) | DOL | 15,400 | $1.00 | $1.00 | $1.00 | $1.00 |
| 33 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 23,268 | $81.30 | $81.30 | $82.19 | $81.30 |
| 34 | Asphaltic surface (465.0105) | TON | 279 | $149.70 | $149.70 | $151.35 | $149.70 |
| 35 | Asphaltic surface patching (465.0110) | TON | 5,850 | $57.80 | $57.80 | $58.44 | $57.80 |
| 36 | Asphaltic surface temporary (465.0125) | TON | 2,610 | $68.70 | $76.65 | $69.46 | $68.70 |
| 37 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 174,468 | $0.20 | $0.20 | $0.20 | $0.20 |
| 38 | Concrete masonry endwalls (504.0900) | CY | 3 | $2,600.00 | $1,800.00 | $3,235.20 | $1,755.00 |
| 39 | Culvert pipe temporary 15-inch (520.2015) | LF | 118 | $59.39 | $105.10 | $69.00 | $68.25 |
| 40 | Concrete collars for pipe (520.8000) | EACH | 2 | $1,231.75 | $1,500.00 | $1,516.50 | $1,500.00 |
| 41 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 56 | $200.43 | $238.30 | $237.59 | $235.00 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 1 | $2,503.75 | $2,570.00 | $1,768.24 | $1,749.00 |
| 43 | Culvert pipe salvaged 36-inch (524.0136) | LF | 32 | $113.53 | $183.60 | $254.77 | $252.00 |
| 44 | Apron endwalls for culvert pipe salvaged 36-inch (524.0636) | EACH | 1 | $1,460.00 | $2,000.00 | $2,537.61 | $2,510.00 |
| 45 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 159 | $45.00 | $52.00 | $82.21 | $100.00 |
| 46 | Concrete surface drains (602.3010) | CY | 6.90 | $850.00 | $950.00 | $2,193.50 | $1,000.00 |
| 47 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 183,500 | $0.21 | $0.21 | $0.21 | $0.21 |
| 48 | Concrete barrier temporary precast delivered (603.8000) | LF | 5,280 | $11.09 | $15.75 | $11.10 | $16.25 |
| 49 | Concrete barrier temporary precast installed (603.8125) | LF | 10,550 | $4.46 | $1.75 | $3.45 | $2.25 |
| 50 | Riprap medium (606.0200) | CY | 6 | $200.00 | $330.00 | $278.03 | $275.00 |
| 51 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 80 | $25.15 | $16.00 | $37.41 | $37.00 |
| 52 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 4 | $459.63 | $470.00 | $409.46 | $405.00 |
| 53 | Steel thrie beam bullnose terminal (614.0220) | EACH | 4 | $12,000 | $12,000 | $12,132 | $12,000 |
| 54 | Steel thrie beam (614.0230) | LF | 250 | $33.00 | $33.00 | $33.36 | $33.00 |
| 55 | MGS guardrail 3 (614.2300) | LF | 2,575 | $26.00 | $26.00 | $26.29 | $26.00 |
| 56 | MGS thrie beam transition (614.2500) | LF | 236.40 | $87.00 | $87.00 | $87.96 | $87.00 |
| 57 | MGS guardrail terminal eat (614.2610) | EACH | 10 | $3,393.00 | $3,393.00 | $3,430.32 | $3,393.00 |
| 58 | MGS guardrail terminal type 2 (614.2620) | EACH | 4 | $3,000.00 | $3,000.00 | $3,033.00 | $3,000.00 |
| 59 | Maintenance and repair of haul roads (project) 01. 1058-22-60 (618.0100) | EACH | 1 | $0.01 | $0.01 | $2,527.50 | $1.00 |
| 60 | Maintenance and repair of haul roads (project) 02. 1058-22-61 (618.0100) | EACH | 1 | $0.01 | $0.01 | $2,527.50 | $1.00 |
| 61 | Mobilization (619.1000) | EACH | 1 | $682,000 | $488,301 | $665,228 | $809,000 |
| 62 | Water (624.0100) | MGAL | 180 | $40.00 | $85.00 | $45.50 | $45.00 |
| 63 | Topsoil (625.0100) | SY | 16,740 | $1.50 | $3.10 | $3.03 | $3.00 |
| 64 | Erosion bales (628.1104) | EACH | 8 | $30.00 | $30.00 | $30.33 | $30.00 |
| 65 | Silt fence (628.1504) | LF | 13,931 | $1.75 | $1.75 | $1.77 | $1.75 |
| 66 | Silt fence maintenance (628.1520) | LF | 13,931 | $0.03 | $0.03 | $0.03 | $0.03 |
| 67 | Mobilizations erosion control (628.1905) | EACH | 4 | $173.00 | $173.00 | $176.93 | $173.00 |
| 68 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $373.00 | $373.00 | $377.10 | $373.00 |
| 69 | Erosion mat class I type A (628.2002) | SY | 15,110 | $1.03 | $1.03 | $1.04 | $1.03 |
| 70 | Erosion mat urban class I type A (628.2006) | SY | 1,630 | $1.99 | $1.99 | $2.01 | $1.99 |
| 71 | Inlet protection type A (628.7005) | EACH | 4 | $125.00 | $125.00 | $126.38 | $125.00 |
| 72 | Temporary ditch checks (628.7504) | LF | 180 | $9.00 | $9.00 | $9.10 | $9.00 |
| 73 | Culvert pipe checks (628.7555) | EACH | 30 | $25.00 | $25.00 | $25.28 | $25.00 |
| 74 | Rock bags (628.7570) | EACH | 50 | $9.00 | $9.00 | $9.10 | $9.00 |
| 75 | Fertilizer type B (629.0210) | CWT | 10.61 | $125.00 | $125.00 | $126.38 | $125.00 |
| 76 | Seeding mixture no. 30 (630.0130) | LB | 306 | $11.00 | $11.00 | $11.12 | $11.00 |
| 77 | Seed water (630.0500) | MGAL | 94.52 | $10.00 | $10.00 | $10.11 | $10.00 |
| 78 | Delineator posts steel (633.0100) | EACH | 566 | $33.00 | $33.00 | $33.36 | $33.00 |
| 79 | Delineator reflectors (633.0500) | EACH | 566 | $17.00 | $17.00 | $17.19 | $17.00 |
| 80 | Delineators temporary (633.1100) | EACH | 53 | $27.00 | $27.00 | $33.36 | $33.00 |
| 81 | Markers culvert end (633.5200) | EACH | 4 | $75.00 | $75.00 | $75.83 | $75.00 |
| 82 | Field office type B (642.5001) | EACH | 1 | $10,000 | $22,000 | $10,110 | $10,000 |
| 83 | Traffic control drums (643.0300) | DAY | 38,778 | $0.45 | $0.45 | $0.45 | $0.45 |
| 84 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 293 | $148.00 | $135.00 | $136.49 | $135.00 |
| 85 | Traffic control barricades type III (643.0420) | DAY | 5,970 | $1.00 | $1.00 | $1.01 | $1.00 |
| 86 | Traffic control flexible tubular marker posts (643.0500) | EACH | 420 | $38.00 | $35.00 | $35.39 | $35.00 |
| 87 | Traffic control flexible tubular marker bases (643.0600) | EACH | 420 | $15.00 | $12.50 | $12.13 | $12.50 |
| 88 | Traffic control warning lights type A (643.0705) | DAY | 11,940 | $0.20 | $0.20 | $0.20 | $0.20 |
| 89 | Traffic control warning lights type C (643.0715) | DAY | 4,791 | $0.30 | $0.30 | $0.30 | $0.30 |
| 90 | Connected arrow board (643.0810.S) | DAY | 293 | $23.25 | $23.25 | $23.51 | $23.25 |
| 91 | Traffic control signs (643.0900) | DAY | 13,496 | $0.45 | $0.45 | $0.45 | $0.45 |
| 92 | Traffic control covering signs type II (643.0920) | EACH | 76 | $58.50 | $58.50 | $59.14 | $58.50 |
| 93 | Traffic control signs fixed message (643.1000) | SF | 197 | $22.25 | $22.25 | $22.49 | $22.25 |
| 94 | Traffic control cones 42-inch (643.1070) | DAY | 45,600 | $0.45 | $0.45 | $0.45 | $0.45 |
| 95 | Connected work zone start and end location markers (643.1220.S) | DAY | 293 | $12.50 | $12.50 | $12.64 | $12.50 |
| 96 | Temporary marking line paint 6- inch (643.3165) | LF | 77,645 | $0.18 | $0.18 | $0.18 | $0.18 |
| 97 | Temporary marking line removable tape 6-inch (643.3180) | LF | 59,560 | $1.75 | $1.65 | $1.67 | $1.65 |
| 98 | Traffic control (643.5000) | EACH | 1 | $280,000 | $252,000 | $254,772 | $252,000 |
| 99 | Geotextile type DF schedule A (645.0111) | SY | 2 | $20.00 | $20.00 | $262.86 | $260.00 |
| 100 | Geotextile type HR (645.0120) | SY | 9 | $10.00 | $10.00 | $131.43 | $130.00 |
| 101 | Geogrid type SR (645.0220) | SY | 4,336 | $1.40 | $1.80 | $1.77 | $1.75 |
| 102 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 45,586 | $0.82 | $0.82 | $0.83 | $0.82 |
| 103 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 358,497 | $1.25 | $1.20 | $1.21 | $1.20 |
| 104 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 45,586 | $6.95 | $6.95 | $7.03 | $6.95 |
| 105 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 12,007 | $11.00 | $11.00 | $11.12 | $11.00 |
| 106 | Marking outfall epoxy (646.5520) | EACH | 734 | $46.27 | $46.27 | $46.78 | $46.27 |
| 107 | Marking stop line epoxy 18-inch (646.6120) | LF | 60 | $14.94 | $14.94 | $15.10 | $14.94 |
| 108 | Marking yield line epoxy 18-inch (646.6220) | EACH | 30 | $35.66 | $35.66 | $36.05 | $35.66 |
| 109 | Cold weather marking epoxy 6-inch (646.6466) | LF | 11,757 | $0.45 | $0.45 | $0.45 | $0.45 |
| 110 | Marking diagonal epoxy 12-inch (646.7120) | LF | 456 | $14.55 | $14.55 | $14.71 | $14.55 |
| 111 | Marking chevron epoxy 12-inch (646.7320) | LF | 953 | $23.72 | $23.72 | $23.98 | $23.72 |
| 112 | Marking removal line water blasting 6-inch (646.9012) | LF | 86,720 | $0.30 | $0.30 | $0.30 | $0.30 |
| 113 | Construction staking subgrade (650.4500) | LF | 1,320 | $0.01 | $0.01 | $0.01 | $0.01 |
| 114 | Construction staking base (650.5000) | LF | 1,320 | $1.00 | $1.00 | $1.01 | $1.00 |
| 115 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 159 | $1.00 | $1.00 | $1.01 | $1.00 |
| 116 | Construction staking concrete pavement (650.7000) | LF | 1,320 | $1.20 | $1.20 | $1.21 | $1.20 |
| 117 | Construction staking resurfacing reference (650.8000) | LF | 175,206 | $0.08 | $0.08 | $0.08 | $0.08 |
| 118 | Construction staking supplemental control (project) 01. 1058-22-60 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.11 | $10.00 |
| 119 | Construction staking supplemental control (project) 02. 1058-22-61 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.11 | $10.00 |
| 120 | Construction staking slope stakes (650.9920) | LF | 1,320 | $2.00 | $2.00 | $2.02 | $2.00 |
| 121 | Sawing asphalt (690.0150) | LF | 4,605 | $1.75 | $1.75 | $1.77 | $1.75 |
| 122 | Sawing concrete (690.0250) | LF | 103,371 | $2.35 | $2.35 | $2.38 | $2.35 |
| 123 | Incentive flexural strength concrete pavement (715.0715) | DOL | 4,633 | $1.00 | $1.00 | $1.00 | $1.00 |
| 124 | Incentive compressive strength concrete pavement (715.0720) | DOL | 4,633 | $1.00 | $1.00 | $1.00 | $1.00 |
| 125 | Incentive iri ride (740.0440) | DOL | 2,618 | $1.00 | $1.00 | $1.00 | $1.00 |
| 126 | Special 01. aew for culvert pipe sloped cross drain reinforced concrete 15-inch 6 to 1 (SPV.0060) | EACH | 3 | $2,367.30 | $2,400.00 | $1,409.33 | $1,394.00 |
| 127 | Special 02. aew for culvert pipe sloped cross drain reinforced concrete 18-inch 6 to 1 (SPV.0060) | EACH | 1 | $2,441.15 | $3,400.00 | $1,484.15 | $1,468.00 |
| 128 | Special 03. locate and clean existing underdrain outfalls (SPV.0060) | EACH | 734 | $50.00 | $50.00 | $126.38 | $275.00 |
| 129 | Special 04. removing raised pavement markers & filling voids (SPV.0060) | EACH | 1,836 | $50.00 | $59.00 | $59.65 | $59.00 |
| 130 | Special 05. culvert pipe plug temporary (SPV.0060) | EACH | 2 | $1,213.75 | $1,200.00 | $758.25 | $750.00 |
| 131 | Special 01. construction staking concrete pavement reference (SPV.0090) | LF | 4,110 | $2.00 | $2.00 | $2.02 | $2.00 |
| 132 | Special 02. concrete joint & crack cleaning, repair & sealing (SPV.0090) | LF | 414 | $10.00 | $28.00 | $38.43 | $50.00 |
| 133 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 50,830 | $4.40 | $4.40 | $4.45 | $4.40 |
| 134 | Special 02. embankment special compaction (SPV.0180) | SY | 6,170 | $2.50 | $1.70 | $2.02 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 12, 2025. Compiled by Mirage Metrics.