WisDOT contract 20250812019 bid tabulation
Monico - Eagle River; USH 8 to STH 32 (USH 045, Oneida County Monico - Eagle River). Let by Wisconsin DOT on August 12, 2025, Oneida. 2 bids received; low bid $7,118,297 by Pitlik & Wick, Inc..
- Owner
- Wisconsin DOT
- Letting
- 12 AUG 2025
- Pay items
- 93
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pitlik & Wick, Inc. | $7,118,297 | Low |
| 2 | Northeast Asphalt, Inc | $7,425,248 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pitlik & Wick, Inc. | 2. Northeast Asphalt, Inc |
|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 8 | $1,703.46 | $1,703.46 |
| 2 | Grubbing (201.0205) | STA | 8 | $1,237.91 | $1,237.91 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 22 | $1,709.33 | $1,709.33 |
| 4 | Removing structure (structure) 01. 60-inch culvert (203.0220) | EACH | 1 | $55,442 | $55,442 |
| 5 | Removing asphaltic surface (204.0110) | SY | 110 | $8.00 | $12.00 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 910 | $8.00 | $8.50 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 308,000 | $0.40 | $0.10 |
| 8 | Removing guardrail (204.0165) | LF | 150 | $6.28 | $5.00 |
| 9 | Removing delineators and markers (204.0180) | EACH | 42 | $31.20 | $50.00 |
| 10 | Removing masonry (204.0185) | CY | 11 | $1.00 | $1.00 |
| 11 | Removing (item description) 01. concrete wheel stops (204.9060.S) | EACH | 20 | $25.00 | $170.00 |
| 12 | Excavation common (205.0100) | CY | 15,600 | $13.23 | $13.85 |
| 13 | Borrow (208.0100) | CY | 2,190 | $7.13 | $7.13 |
| 14 | Temporary lane shift during culvert work (208.1500.S) | EACH | 42 | $1,772.86 | $1,772.86 |
| 15 | Prepare foundation for asphaltic paving (project) 01. 1600-29-71 (211.0101) | EACH | 1 | $2,500.00 | $52,460 |
| 16 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 2 | $500.00 | $535.00 |
| 17 | Finishing roadway (project) 01. 1600-29-71 (213.0100) | EACH | 1 | $5,500.00 | $2,500.00 |
| 18 | Base aggregate dense 3/4-inch (305.0110) | TON | 14,700 | $22.25 | $24.34 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 6,200 | $28.50 | $29.07 |
| 20 | HMA cold weather paving (450.4000) | TON | 15,690 | $0.01 | $0.01 |
| 21 | Tack coat (455.0605) | GAL | 36,900 | $3.00 | $2.70 |
| 22 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $7,500.00 | $2,280.00 |
| 23 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $7,500.00 | $3,470.00 |
| 24 | Incentive density PWL HMA pavement (460.2005) | DOL | 47,410 | $1.00 | $1.00 |
| 25 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 17,330 | $1.00 | $1.00 |
| 26 | Incentive air voids HMA pavement (460.2010) | DOL | 62,700 | $1.00 | $1.00 |
| 27 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 62,700 | $61.95 | $65.10 |
| 28 | Asphaltic surface (465.0105) | TON | 2,660 | $109.50 | $91.20 |
| 29 | Asphaltic surface patching (465.0110) | TON | 1,670 | $90.00 | $91.20 |
| 30 | Asphaltic surface driveways and field entrances (465.0120) | TON | 20 | $175.00 | $150.00 |
| 31 | Asphaltic rumble strips, centerline sinusoidal (465.0565) | LF | 77,000 | $0.31 | $0.40 |
| 32 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 8 | $416.61 | $416.61 |
| 33 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 22 | $782.86 | $782.86 |
| 34 | Apron endwalls for culvert pipe 36- inch (520.1036) | EACH | 12 | $1,374.51 | $1,374.51 |
| 35 | Apron endwalls for culvert pipe 48- inch (520.1048) | EACH | 2 | $4,149.97 | $4,149.97 |
| 36 | Apron endwalls for culvert pipe 60- inch (520.1060) | EACH | 2 | $5,427.62 | $5,427.62 |
| 37 | Culvert pipe class III-A non-metal 24-inch (520.3424) | LF | 307 | $139.26 | $139.71 |
| 38 | Culvert pipe class III-A non-metal 30-inch (520.3430) | LF | 1,061 | $172.74 | $173.37 |
| 39 | Culvert pipe class III-A non-metal 36-inch (520.3436) | LF | 365 | $183.50 | $184.24 |
| 40 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 56 | $341.03 | $341.27 |
| 41 | Culvert pipe reinforced concrete class IV 48-inch (522.0448) | LF | 69 | $564.33 | $564.17 |
| 42 | Culvert pipe reinforced concrete class IV 60-inch (522.0460) | LF | 67 | $823.16 | $822.47 |
| 43 | Riprap medium (606.0200) | CY | 76 | $235.54 | $235.54 |
| 44 | Riprap heavy (606.0300) | CY | 14 | $197.96 | $197.96 |
| 45 | Adjusting steel plate beam guard (614.0400) | LF | 120 | $12.36 | $10.00 |
| 46 | MGS guardrail 3 (614.2300) | LF | 12.50 | $55.65 | $50.00 |
| 47 | MGS guardrail terminal eat (614.2610) | EACH | 3 | $4,135.00 | $3,653.00 |
| 48 | Maintenance and repair of haul roads (project) 01. 1600-29-71 (618.0100) | EACH | 1 | $1.00 | $1.00 |
| 49 | Mobilization (619.1000) | EACH | 1 | $228,850 | $341,000 |
| 50 | Water (624.0100) | MGAL | 330 | $1.00 | $1.00 |
| 51 | Topsoil (625.0100) | SY | 30,100 | $0.34 | $0.34 |
| 52 | Silt fence (628.1504) | LF | 12,800 | $1.44 | $1.75 |
| 53 | Silt fence maintenance (628.1520) | LF | 12,800 | $0.38 | $0.03 |
| 54 | Mobilizations erosion control (628.1905) | EACH | 6 | $800.00 | $293.00 |
| 55 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $415.00 | $393.00 |
| 56 | Erosion mat urban class I type A (628.2006) | SY | 30,100 | $1.25 | $1.65 |
| 57 | Temporary ditch checks (628.7504) | LF | 190 | $13.65 | $10.00 |
| 58 | Culvert pipe checks (628.7555) | EACH | 135 | $85.29 | $25.00 |
| 59 | Rock bags (628.7570) | EACH | 40 | $14.11 | $10.00 |
| 60 | Fertilizer type B (629.0210) | CWT | 6 | $127.20 | $125.00 |
| 61 | Seeding mixture no. 20 (630.0120) | LB | 1,380 | $5.59 | $9.00 |
| 62 | Seeding temporary (630.0200) | LB | 50 | $1.50 | $7.00 |
| 63 | Seed water (630.0500) | MGAL | 700 | $13.65 | $1.00 |
| 64 | Markers culvert end (633.5200) | EACH | 42 | $76.11 | $75.00 |
| 65 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 4 | $65.00 | $100.00 |
| 66 | Moving signs type II (638.2102) | EACH | 10 | $89.00 | $120.00 |
| 67 | Removing signs type II (638.2602) | EACH | 15 | $36.00 | $25.00 |
| 68 | Removing small sign supports (638.3000) | EACH | 8 | $55.00 | $25.00 |
| 69 | Moving small sign supports (638.4000) | EACH | 10 | $71.50 | $120.00 |
| 70 | Field office type B (642.5001) | EACH | 1 | $10,000 | $12,750 |
| 71 | Traffic control drums (643.0300) | DAY | 31,500 | $0.23 | $0.23 |
| 72 | Traffic control signs (643.0900) | DAY | 16,800 | $0.27 | $0.27 |
| 73 | Traffic control signs fixed message (643.1000) | SF | 54 | $8.00 | $8.00 |
| 74 | Temporary marking line paint 6- inch (643.3165) | LF | 215,700 | $0.44 | $0.45 |
| 75 | Traffic control (643.5000) | EACH | 1 | $12,922 | $15,147 |
| 76 | Geotextile type HR (645.0120) | SY | 220 | $12.06 | $12.06 |
| 77 | Marking line epoxy 6-inch (646.2020) | LF | 538 | $0.65 | $0.65 |
| 78 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 251,600 | $1.25 | $1.25 |
| 79 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 345 | $2.20 | $2.20 |
| 80 | Marking arrow epoxy (646.5020) | EACH | 4 | $300.00 | $300.00 |
| 81 | Marking word epoxy (646.5120) | EACH | 1 | $350.00 | $350.00 |
| 82 | Cold weather marking epoxy 6-inch (646.6466) | LF | 251,600 | $0.01 | $0.01 |
| 83 | Marking parking stall epoxy (646.8320) | LF | 766 | $7.50 | $7.50 |
| 84 | Construction staking pipe culverts (650.6000) | EACH | 23 | $120.00 | $120.00 |
| 85 | Construction staking resurfacing reference (650.8000) | LF | 86,244 | $0.06 | $0.06 |
| 86 | Construction staking supplemental control (project) 01. 1600-29-71 (650.9911) | EACH | 1 | $10.00 | $10.00 |
| 87 | Construction staking slope stakes (650.9920) | LF | 1,193 | $0.99 | $0.99 |
| 88 | Sawing asphalt (690.0150) | LF | 1,360 | $2.50 | $1.95 |
| 89 | Incentive iri ride (740.0440) | DOL | 65,300 | $1.00 | $1.00 |
| 90 | Special 01. resetting culvert sections (SPV.0060) | EACH | 1 | $11,204 | $11,193 |
| 91 | Special 02. concrete wheel stops (SPV.0060) | EACH | 20 | $250.00 | $201.00 |
| 92 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 14,900 | $1.60 | $5.80 |
| 93 | Special 02. protective thermoplastic coating at snowmobile trail crossing (SPV.0180) | SY | 211 | $115.00 | $95.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.