| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $2,608,972 | Low |
| 2 | Rock Road Companies, Inc. | $2,812,907 | +8.0% |
| 3 | Stark Pavement Corporation | $3,399,908 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Rock Road Companies, Inc. | 3. Stark Pavement Corporation |
|---|---|---|---|---|---|---|
| 1 | Removing asphaltic surface (204.0110) | SY | 1,142 | $16.48 | $16.48 | $33.35 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 200 | $0.01 | $10.06 | $13.00 |
| 3 | Removing asphaltic surface milling (204.0125) | TON | 14,645 | $0.01 | $14.51 | $26.00 |
| 4 | Removing curb (204.0130) | LF | 41 | $20.00 | $20.00 | $56.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 2,973 | $7.75 | $7.75 | $13.50 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 2,437 | $3.00 | $3.00 | $11.00 |
| 7 | Removing inlets (204.0220) | EACH | 1 | $178.62 | $400.00 | $1,000.00 |
| 8 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 27 | $13.23 | $41.20 | $39.00 |
| 9 | Excavation common (205.0100) | CY | 574 | $43.17 | $43.17 | $62.00 |
| 10 | Prepare foundation for asphaltic paving (project) 01. 1330-34-70 (211.0101) | EACH | 1 | $14,214 | $0.01 | $7,920.00 |
| 11 | Finishing roadway (project) 01. 1330-34-70 (213.0100) | EACH | 1 | $142.14 | $5,391.15 | $7,900.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 362 | $44.00 | $61.33 | $51.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,137 | $24.00 | $24.00 | $31.65 |
| 14 | Tack coat (455.0605) | GAL | 9,320 | $3.00 | $2.38 | $3.00 |
| 15 | Incentive density HMA pavement (460.2000) | DOL | 9,580 | $1.00 | $1.00 | $1.00 |
| 16 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 14,958 | $80.60 | $79.50 | $89.95 |
| 17 | Asphaltic surface (465.0105) | TON | 80 | $430.00 | $222.84 | $325.00 |
| 18 | Asphaltic surface driveways and field entrances (465.0120) | TON | 246 | $80.60 | $145.38 | $92.40 |
| 19 | Pigmented surface sealer reseal (502.3205) | SY | 129 | $18.00 | $18.00 | $18.00 |
| 20 | Polymer overlay (509.5100.S) | SY | 978 | $43.92 | $43.92 | $43.92 |
| 21 | Concrete collars for pipe (520.8000) | EACH | 1 | $454.55 | $850.00 | $1,337.00 |
| 22 | Cleaning culvert pipes (520.8700) | EACH | 5 | $1,638.30 | $1,800.00 | $1,800.00 |
| 23 | Concrete curb type J (601.0120) | LF | 42 | $37.65 | $37.65 | $70.00 |
| 24 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 93 | $56.72 | $56.72 | $70.00 |
| 25 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 2,053 | $62.58 | $62.58 | $70.00 |
| 26 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 311 | $65.07 | $65.07 | $70.00 |
| 27 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 507 | $70.57 | $70.57 | $70.00 |
| 28 | Concrete curb pedestrian (601.0600) | LF | 582 | $25.29 | $25.29 | $50.00 |
| 29 | Concrete sidewalk 5-inch (602.0410) | SF | 21,154 | $8.91 | $8.91 | $10.50 |
| 30 | Curb ramp detectable warning field natural patina (602.0515) | SF | 1,320 | $43.00 | $43.00 | $55.00 |
| 31 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 689 | $48.00 | $48.00 | $58.00 |
| 32 | Concrete driveway 7-inch (602.0815) | SY | 2 | $125.00 | $125.00 | $500.00 |
| 33 | Riprap heavy (606.0300) | CY | 70 | $116.16 | $207.42 | $150.00 |
| 34 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 27 | $103.70 | $220.35 | $174.00 |
| 35 | Inlets 2X3-FT (611.3230) | EACH | 1 | $2,250.90 | $2,841.00 | $3,407.00 |
| 36 | Adjusting inlet covers (611.8115) | EACH | 1 | $714.59 | $600.00 | $1,432.00 |
| 37 | Salvaged inlet covers (611.9710) | EACH | 1 | $71.45 | $475.00 | $668.00 |
| 38 | Maintenance and repair of haul roads (project) 01. 1330-34-70 (618.0100) | EACH | 1 | $1.00 | $0.01 | $3,500.00 |
| 39 | Mobilization (619.1000) | EACH | 1 | $31,887 | $101,765 | $122,000 |
| 40 | Concrete median sloped nose (620.0300) | SF | 34 | $30.00 | $30.00 | $68.00 |
| 41 | Topsoil (625.0100) | SY | 650 | $18.00 | $10.69 | $15.90 |
| 42 | Salvaged topsoil (625.0500) | SY | 1,300 | $18.00 | $5.43 | $15.90 |
| 43 | Mulching (627.0200) | SY | 400 | $1.50 | $1.10 | $1.10 |
| 44 | Silt fence (628.1504) | LF | 2,200 | $2.25 | $1.99 | $1.99 |
| 45 | Silt fence maintenance (628.1520) | LF | 2,200 | $0.01 | $0.10 | $0.10 |
| 46 | Mobilizations erosion control (628.1905) | EACH | 6 | $100.00 | $250.00 | $250.00 |
| 47 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $150.00 | $150.00 |
| 48 | Erosion mat urban class I type B (628.2008) | SY | 1,300 | $2.25 | $1.89 | $1.89 |
| 49 | Inlet protection type B (628.7010) | EACH | 40 | $55.00 | $41.00 | $41.00 |
| 50 | Inlet protection type C (628.7015) | EACH | 170 | $60.00 | $38.00 | $38.00 |
| 51 | Inlet protection type D (628.7020) | EACH | 20 | $120.00 | $88.10 | $88.10 |
| 52 | Culvert pipe checks (628.7555) | EACH | 60 | $19.00 | $45.00 | $45.00 |
| 53 | Fertilizer type B (629.0210) | CWT | 0.90 | $250.00 | $100.00 | $100.00 |
| 54 | Seeding mixture no. 30 (630.0130) | LB | 60 | $11.00 | $15.50 | $15.50 |
| 55 | Seeding temporary (630.0200) | LB | 35 | $5.00 | $10.00 | $10.00 |
| 56 | Seed water (630.0500) | MGAL | 30 | $10.00 | $25.00 | $25.00 |
| 57 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 45 | $95.00 | $95.00 | $95.00 |
| 58 | Posts tubular steel 2X2-inch X 16- FT (634.0816) | EACH | 5 | $210.00 | $175.00 | $175.00 |
| 59 | Signs type II reflective H (637.2210) | SF | 122.76 | $22.00 | $19.10 | $19.10 |
| 60 | Signs type II reflective F (637.2230) | SF | 443 | $22.00 | $18.50 | $18.50 |
| 61 | Moving signs type II (638.2102) | EACH | 47 | $150.00 | $100.00 | $100.00 |
| 62 | Removing signs type II (638.2602) | EACH | 51 | $35.00 | $22.00 | $22.00 |
| 63 | Removing small sign supports (638.3000) | EACH | 22 | $35.00 | $22.00 | $22.00 |
| 64 | Field office type C (642.5201) | EACH | 1 | $18,718 | $8,750.00 | $16,000 |
| 65 | Traffic control drums (643.0300) | DAY | 58,294 | $0.08 | $0.08 | $0.08 |
| 66 | Traffic control barricades type III (643.0420) | DAY | 5,535 | $0.60 | $0.60 | $0.60 |
| 67 | Traffic control warning lights type A (643.0705) | DAY | 5,390 | $0.08 | $0.08 | $0.08 |
| 68 | Traffic control warning lights type C (643.0715) | DAY | 2,879 | $0.08 | $0.08 | $0.08 |
| 69 | Traffic control signs (643.0900) | DAY | 10,958 | $0.45 | $0.45 | $0.45 |
| 70 | Traffic control covering signs type I (643.0910) | EACH | 2 | $175.00 | $175.00 | $175.00 |
| 71 | Traffic control covering signs type II (643.0920) | EACH | 6 | $40.00 | $40.00 | $40.00 |
| 72 | Traffic control signs fixed message (643.1000) | SF | 72 | $16.00 | $16.00 | $16.00 |
| 73 | Traffic control signs PCMS (643.1050) | DAY | 98 | $30.00 | $30.00 | $30.00 |
| 74 | Traffic control cones 42-inch (643.1070) | DAY | 85,380 | $0.12 | $0.12 | $0.12 |
| 75 | Temporary marking line paint 4- inch (643.3105) | LF | 8,896 | $0.30 | $0.30 | $0.30 |
| 76 | Temporary marking line paint 8- inch (643.3205) | LF | 1,993 | $1.00 | $1.00 | $1.00 |
| 77 | Temporary marking line paint 10- inch (643.3265) | LF | 291 | $2.00 | $2.00 | $2.00 |
| 78 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 2,310 | $0.65 | $0.65 | $0.65 |
| 79 | Temporary marking arrow paint (643.3505) | EACH | 32 | $45.00 | $45.00 | $45.00 |
| 80 | Traffic control (643.5000) | EACH | 1 | $56,291 | $56,291 | $56,291 |
| 81 | Temporary pedestrian surface matting (644.1440) | SF | 1,845 | $5.00 | $5.00 | $5.00 |
| 82 | Temporary pedestrian curb ramp (644.1601) | DAY | 612 | $6.00 | $6.00 | $6.00 |
| 83 | Temporary pedestrian detectable warning field (644.1605) | SF | 150 | $6.00 | $6.00 | $6.00 |
| 84 | Temporary pedestrian barricade (644.1810) | LF | 1,620 | $4.50 | $4.50 | $4.50 |
| 85 | Geotextile type HR (645.0120) | SY | 155 | $2.46 | $3.05 | $6.00 |
| 86 | Marking line epoxy 4-inch (646.1020) | LF | 12,601 | $0.32 | $0.32 | $0.65 |
| 87 | Marking line epoxy 6-inch (646.2020) | LF | 340 | $0.44 | $0.44 | $0.95 |
| 88 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 3,048 | $0.80 | $0.80 | $1.10 |
| 89 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 63,835 | $1.30 | $1.30 | $1.32 |
| 90 | Marking line epoxy 8-inch (646.3020) | LF | 401 | $0.85 | $0.85 | $1.10 |
| 91 | Marking line epoxy 10-inch (646.4020) | LF | 696 | $0.97 | $0.97 | $1.30 |
| 92 | Marking line grooved black epoxy 10-inch (646.4025) | LF | 190 | $1.76 | $1.76 | $2.50 |
| 93 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 10,485 | $2.60 | $2.60 | $3.05 |
| 94 | Marking arrow epoxy (646.5020) | EACH | 68 | $235.96 | $235.96 | $220.00 |
| 95 | Marking word epoxy (646.5120) | EACH | 28 | $285.07 | $285.07 | $240.00 |
| 96 | Marking stop line epoxy 18-inch (646.6120) | LF | 473 | $13.37 | $13.37 | $13.00 |
| 97 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 270 | $14.60 | $14.60 | $16.50 |
| 98 | Marking diagonal epoxy 12-inch (646.7120) | LF | 642 | $14.22 | $14.22 | $9.75 |
| 99 | Marking chevron epoxy 12-inch (646.7320) | LF | 260 | $23.21 | $23.21 | $10.00 |
| 100 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 3,437 | $11.60 | $11.60 | $10.50 |
| 101 | Marking corrugated median epoxy (646.8020) | SF | 444 | $8.23 | $8.23 | $9.00 |
| 102 | Marking curb epoxy (646.8120) | LF | 887 | $6.99 | $6.99 | $8.00 |
| 103 | Marking island nose epoxy (646.8220) | EACH | 41 | $262.25 | $262.25 | $270.00 |
| 104 | Marking removal line 8-inch (646.9100) | LF | 435 | $1.25 | $1.25 | $1.25 |
| 105 | Marking removal special marking (646.9300) | EACH | 10 | $100.00 | $100.00 | $100.00 |
| 106 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,588 | $2.01 | $1.00 | $2.01 |
| 107 | Construction staking curb ramps (650.9000) | EACH | 97 | $227.27 | $100.00 | $227.25 |
| 108 | Construction staking sidewalk (project) 01. 1330-34-70 (650.9500) | EACH | 1 | $1.01 | $1,500.00 | $1.01 |
| 109 | Construction staking supplemental control (project) 01. 1330-34-70 (650.9911) | EACH | 1 | $3,813.13 | $1,500.00 | $3,812.75 |
| 110 | Sawing asphalt (690.0150) | LF | 3,586 | $1.39 | $1.39 | $1.39 |
| 111 | Sawing concrete (690.0250) | LF | 1,737 | $1.85 | $1.85 | $1.85 |
| 112 | Incentive iri ride (740.0440) | DOL | 21,106 | $1.00 | $1.00 | $1.00 |
| 113 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 | $5.00 | $5.00 |
| 114 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,280 | $5.00 | $5.00 | $5.00 |
| 115 | Special 01. repair and regrout structure pipe holes (SPV.0060) | EACH | 11 | $714.58 | $279.55 | $572.00 |
| 116 | Special 02. cleaning inlets (SPV.0060) | EACH | 2 | $297.33 | $400.00 | $750.00 |
| 117 | Special 03. reset and retie end section (SPV.0060) | EACH | 1 | $1,429.15 | $1,376.50 | $1,131.00 |
| 118 | Special 04. cleaning storm sewer outfall (SPV.0060) | EACH | 2 | $714.58 | $706.25 | $1,000.00 |
| 119 | Special 05. vegetation removal outfall (SPV.0060) | EACH | 3 | $303.03 | $600.00 | $700.00 |
| 120 | Special 01. asphaltic repair (SPV.0195) | TON | 292 | $175.00 | $148.01 | $207.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.