| 1 | Clearing (201.0105) | STA | 11 | $543.79 | $543.79 |
| 2 | Grubbing (201.0205) | STA | 11 | $310.29 | $310.29 |
| 3 | Removing asphaltic surface (204.0110) | SY | 710 | $9.00 | $11.78 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 187 | $0.01 | $10.57 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 165,245 | $0.35 | $2.00 |
| 6 | Removing curb (204.0130) | LF | 295 | $6.50 | $13.90 |
| 7 | Removing curb & gutter (204.0150) | LF | 145 | $9.00 | $18.57 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 370 | $13.25 | $12.50 |
| 9 | Removing guardrail (204.0165) | LF | 3,614 | $2.45 | $2.45 |
| 10 | Removing fence (204.0170) | LF | 225 | $2.50 | $2.50 |
| 11 | Removing utility poles (204.0205) | EACH | 2 | $440.00 | $500.00 |
| 12 | Removing (item description) 01. concrete retaining wall (204.9090.S) | LF | 60 | $105.00 | $48.33 |
| 13 | Excavation common (205.0100) | CY | 274 | $40.00 | $49.26 |
| 14 | Backfill structure type A (210.1100) | CY | 20 | $80.00 | $60.82 |
| 15 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 32 | $370.00 | $282.51 |
| 16 | Finishing roadway (project) 01. 3100-00-75 (213.0100) | EACH | 1 | $2,500.00 | $5,997.53 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 399 | $61.00 | $158.39 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 40 | $95.00 | $45.81 |
| 19 | Drilled tie bars (416.0610) | EACH | 16 | $11.26 | $11.26 |
| 20 | HMA cold weather paving (450.4000) | TON | 4,750 | $1.00 | $0.01 |
| 21 | Tack coat (455.0605) | GAL | 12,158 | $2.22 | $2.49 |
| 22 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $100.00 | $3,500.00 |
| 23 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $100.00 | $3,500.00 |
| 24 | Incentive density PWL HMA pavement (460.2005) | DOL | 13,072 | $1.00 | $1.00 |
| 25 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 8,310 | $1.00 | $1.00 |
| 26 | Incentive air voids HMA pavement (460.2010) | DOL | 18,985 | $1.00 | $1.00 |
| 27 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 19,030 | $69.00 | $76.80 |
| 28 | Asphaltic surface (465.0105) | TON | 155 | $178.80 | $166.98 |
| 29 | Asphaltic surface patching (465.0110) | TON | 300 | $80.95 | $88.52 |
| 30 | Asphaltic surface driveways and field entrances (465.0120) | TON | 45 | $195.43 | $192.32 |
| 31 | Asphaltic flumes (465.0315) | SY | 23 | $130.01 | $70.15 |
| 32 | Asphaltic rumble strips, shoulder (465.0520) | LF | 62,730 | $0.20 | $0.13 |
| 33 | Asphaltic rumble strips, centerline (465.0560) | LF | 30,385 | $0.20 | $0.16 |
| 34 | Asphaltic rumble strips, transverse (465.0580) | SY | 80 | $33.76 | $48.00 |
| 35 | Concrete collars for pipe (520.8000) | EACH | 1 | $418.00 | $850.00 |
| 36 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 1 | $275.00 | $242.50 |
| 37 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 6 | $244.00 | $74.33 |
| 38 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 90 | $78.56 | $78.56 |
| 39 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 360 | $43.61 | $43.61 |
| 40 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 235 | $62.35 | $62.35 |
| 41 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 173 | $94.19 | $94.19 |
| 42 | Concrete curb pedestrian (601.0600) | LF | 22 | $71.52 | $71.52 |
| 43 | Concrete sidewalk 5-inch (602.0410) | SF | 4,360 | $7.97 | $7.97 |
| 44 | Curb ramp detectable warning field yellow (602.0505) | SF | 50 | $51.68 | $51.68 |
| 45 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 52 | $80.74 | $80.74 |
| 46 | Concrete driveway 6-inch (602.0810) | SY | 45 | $117.44 | $117.44 |
| 47 | Concrete driveway hes 6-inch (602.0860) | SY | 17 | $122.10 | $122.10 |
| 48 | Concrete surface drains (602.3010) | CY | 1.20 | $1,197.67 | $1,197.67 |
| 49 | Concrete barrier type S42C (603.1442) | LF | 134 | $165.44 | $165.44 |
| 50 | Concrete barrier transition type S32 to S36 (603.3513) | EACH | 1 | $6,860.14 | $6,860.14 |
| 51 | Concrete barrier transition type S36 to S42 (603.3535) | EACH | 2 | $7,534.47 | $7,534.47 |
| 52 | Riprap medium (606.0200) | CY | 10 | $187.00 | $249.51 |
| 53 | Reconstructing inlets (611.0430) | EACH | 1 | $1,425.00 | $3,775.00 |
| 54 | Inlet covers type S (611.0651) | EACH | 1 | $710.00 | $769.90 |
| 55 | Barrier system grading shaping finishing (614.0010) | EACH | 27 | $1,825.00 | $250.00 |
| 56 | Crash cushions permanent (614.0800) | EACH | 1 | $25,500 | $10,000 |
| 57 | MGS guardrail 3 (614.2300) | LF | 2,912.50 | $27.00 | $27.00 |
| 58 | MGS guardrail 3 K (614.2330) | LF | 137.50 | $38.00 | $38.00 |
| 59 | MGS thrie beam transition (614.2500) | LF | 39.40 | $88.00 | $88.00 |
| 60 | MGS guardrail terminal eat (614.2610) | EACH | 27 | $3,750.00 | $3,750.00 |
| 61 | Fence woven wire (height) 01. 4- FT (616.0100) | LF | 225 | $20.00 | $20.00 |
| 62 | Maintenance and repair of haul roads (project) 01. 3100-00-75 (618.0100) | EACH | 1 | $0.01 | $0.01 |
| 63 | Mobilization (619.1000) | EACH | 1 | $44,290 | $170,053 |
| 64 | Water (624.0100) | MGAL | 7.50 | $157.59 | $0.01 |
| 65 | Topsoil (625.0100) | SY | 760 | $10.75 | $17.03 |
| 66 | Mulching (627.0200) | SY | 460 | $1.00 | $1.00 |
| 67 | Silt fence (628.1504) | LF | 2,875 | $2.00 | $2.00 |
| 68 | Silt fence maintenance (628.1520) | LF | 290 | $0.01 | $0.01 |
| 69 | Mobilizations erosion control (628.1905) | EACH | 7 | $100.00 | $100.00 |
| 70 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $100.00 |
| 71 | Erosion mat class I type B (628.2004) | SY | 585 | $2.00 | $2.00 |
| 72 | Inlet protection type C (628.7015) | EACH | 4 | $75.00 | $75.00 |
| 73 | Temporary ditch checks (628.7504) | LF | 125 | $10.00 | $10.00 |
| 74 | Culvert pipe checks (628.7555) | EACH | 9 | $25.00 | $25.00 |
| 75 | Fertilizer type B (629.0210) | CWT | 0.60 | $200.00 | $200.00 |
| 76 | Seeding mixture no. 30 (630.0130) | LB | 31 | $15.00 | $15.00 |
| 77 | Seeding temporary (630.0200) | LB | 10 | $10.00 | $10.00 |
| 78 | Seed water (630.0500) | MGAL | 11 | $10.00 | $10.00 |
| 79 | Sod water (631.0300) | MGAL | 3 | $300.00 | $300.00 |
| 80 | Sod lawn (631.1000) | SY | 170 | $15.00 | $15.00 |
| 81 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 95 | $95.00 | $95.00 |
| 82 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 6 | $190.00 | $190.00 |
| 83 | Signs type II reflective H (637.2210) | SF | 240.37 | $21.00 | $21.00 |
| 84 | Signs type II reflective H folding (637.2215) | SF | 5.18 | $27.00 | $27.00 |
| 85 | Signs type II reflective F (637.2230) | SF | 244.55 | $21.00 | $21.00 |
| 86 | Moving signs type II (638.2102) | EACH | 9 | $200.00 | $200.00 |
| 87 | Removing signs type II (638.2602) | EACH | 39 | $35.00 | $35.00 |
| 88 | Removing small sign supports (638.3000) | EACH | 48 | $35.00 | $35.00 |
| 89 | Field office type D (642.5401) | EACH | 1 | $14,249 | $5,600.00 |
| 90 | Traffic control drums (643.0300) | DAY | 9,600 | $0.22 | $0.20 |
| 91 | Traffic control barricades type III (643.0420) | DAY | 2,400 | $0.65 | $0.65 |
| 92 | Traffic control warning lights type A (643.0705) | DAY | 2,400 | $0.12 | $0.10 |
| 93 | Traffic control warning lights type C (643.0715) | DAY | 2,700 | $0.12 | $0.10 |
| 94 | Traffic control signs (643.0900) | DAY | 8,400 | $0.65 | $0.45 |
| 95 | Traffic control covering signs type II (643.0920) | EACH | 15 | $25.00 | $40.00 |
| 96 | Traffic control signs fixed message (643.1000) | SF | 72 | $14.50 | $20.00 |
| 97 | Traffic control signs PCMS (643.1050) | DAY | 14 | $30.00 | $40.00 |
| 98 | Temporary marking line paint 6- inch (643.3165) | LF | 165 | $2.00 | $8.00 |
| 99 | Traffic control (643.5000) | EACH | 1 | $28,917 | $29,550 |
| 100 | Temporary pedestrian surface asphalt (644.1410) | SF | 320 | $18.77 | $9.71 |
| 101 | Temporary pedestrian curb ramp (644.1601) | DAY | 40 | $6.00 | $25.00 |
| 102 | Temporary pedestrian detectable warning field (644.1605) | SF | 80 | $6.00 | $20.00 |
| 103 | Temporary pedestrian barricade (644.1810) | LF | 2,265 | $3.50 | $5.50 |
| 104 | Geotextile type HR (645.0120) | SY | 30 | $2.80 | $3.10 |
| 105 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 134,735 | $1.25 | $1.25 |
| 106 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $1,400.00 | $1,400.00 |
| 107 | Marking stop line epoxy 18-inch (646.6120) | LF | 531 | $19.50 | $19.50 |
| 108 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 255 | $11.50 | $11.50 |
| 109 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 568 | $1.75 | $1.00 |
| 110 | Construction staking concrete barrier (650.7500) | LF | 175 | $3.00 | $1.00 |
| 111 | Construction staking resurfacing reference (650.8000) | LF | 41,537 | $0.20 | $0.07 |
| 112 | Construction staking curb ramps (650.9000) | EACH | 8 | $200.00 | $100.00 |
| 113 | Construction staking sidewalk (project) 01. 3100-00-75 (650.9500) | EACH | 1 | $1,200.00 | $1,500.00 |
| 114 | Construction staking supplemental control (project) 01. 3100-00-75 (650.9911) | EACH | 1 | $2,500.00 | $1,500.00 |
| 115 | Construction staking slope stakes (650.9920) | LF | 400 | $1.25 | $0.10 |
| 116 | Sawing asphalt (690.0150) | LF | 1,669 | $1.75 | $1.95 |
| 117 | Sawing concrete (690.0250) | LF | 62 | $3.00 | $2.35 |
| 118 | Incentive strength concrete barrier (715.0603) | DOL | 87.50 | $1.00 | $1.00 |
| 119 | Incentive iri ride (740.0440) | DOL | 31,468 | $1.00 | $1.00 |
| 120 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 500 | $5.00 | $5.00 |
| 121 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,800 | $5.00 | $5.00 |
| 122 | Special 01. backfill slurry (SPV.0035) | CY | 10 | $800.00 | $800.00 |
| 123 | Special 01. section corner monuments (SPV.0060) | EACH | 4 | $0.01 | $1,250.00 |
| 124 | Special 02. curb ramp grading, shaping and finishing (SPV.0060) | EACH | 8 | $790.00 | $1,406.00 |
| 125 | Special 03. concrete barrier transition S36C to S32C (SPV.0060) | EACH | 1 | $7,311.73 | $7,311.73 |
| 126 | Special 04. concrete culvert repair (SPV.0060) | EACH | 1 | $3,020.00 | $2,400.00 |
| 127 | Special 01. sawing curb head (SPV.0090) | LF | 78 | $28.00 | $30.00 |
| 128 | Special 01. excavation, hauling, and disposal of pah contaminated soil (SPV.0195) | TON | 21 | $140.00 | $139.76 |
| 129 | Special 02. asphaltic repair (SPV.0195) | TON | 1,900 | $99.65 | $153.77 |