| 1 | Clearing (201.0105) | STA | 3 | $1,350.00 | $1,350.00 | $1,610.00 |
| 2 | Grubbing (201.0205) | STA | 3 | $1,350.00 | $1,350.00 | $1,100.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 11 | $609.09 | $609.09 | $609.09 |
| 4 | Removing structure (structure) 01. C-58156008470 (203.0220) | EACH | 1 | $8,430.00 | $8,430.00 | $8,430.00 |
| 5 | Removing asphaltic surface (204.0110) | SY | 137 | $10.00 | $10.00 | $10.00 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 390 | $10.30 | $10.30 | $5.15 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 83,410 | $1.50 | $1.50 | $1.35 |
| 8 | Removing guardrail (204.0165) | LF | 660 | $3.50 | $3.50 | $5.40 |
| 9 | Removing inlets (204.0220) | EACH | 1 | $457.50 | $457.50 | $457.50 |
| 10 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 6 | $18.33 | $18.33 | $18.33 |
| 11 | Removing storm sewer (size) 02. 24-inch (204.0245) | LF | 12 | $19.79 | $19.79 | $19.79 |
| 12 | Removing (item description) 01. apron endwalls (204.9060.S) | EACH | 5 | $634.00 | $634.00 | $634.00 |
| 13 | Excavation common (205.0100) | CY | 4,202 | $17.53 | $17.53 | $17.53 |
| 14 | Borrow (208.0100) | CY | 229 | $13.58 | $13.58 | $13.58 |
| 15 | Temporary lane shift during culvert work (208.1500.S) | EACH | 14 | $0.01 | $0.01 | $0.01 |
| 16 | Prepare foundation for asphaltic paving (project) 01. 6580-13-71 (211.0101) | EACH | 1 | $38,740 | $38,740 | $16,343 |
| 17 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 620 | $90.00 | $90.00 | $73.70 |
| 18 | Finishing roadway (project) 01. 6580-13-71 (213.0100) | EACH | 1 | $1,500.00 | $2,500.00 | $8,800.00 |
| 19 | Base aggregate dense 3/4-inch (305.0110) | TON | 790 | $46.80 | $38.81 | $38.81 |
| 20 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 3,890 | $21.03 | $21.03 | $21.03 |
| 21 | HMA cold weather paving (450.4000) | TON | 2,716 | $0.01 | $0.01 | $0.01 |
| 22 | Tack coat (455.0605) | GAL | 8,336 | $2.50 | $2.50 | $0.30 |
| 23 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $2,460.00 | $2,460.00 | $5,520.00 |
| 24 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,520.00 | $3,520.00 | $6,365.00 |
| 25 | Incentive density PWL HMA pavement (460.2005) | DOL | 8,708 | $1.00 | $1.00 | $1.00 |
| 26 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 6,100 | $1.00 | $1.00 | $1.00 |
| 27 | Incentive air voids HMA pavement (460.2010) | DOL | 11,193 | $1.00 | $1.00 | $1.00 |
| 28 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 10,865 | $69.40 | $69.40 | $75.30 |
| 29 | Asphaltic surface (465.0105) | TON | 2,692 | $93.70 | $93.70 | $92.30 |
| 30 | Asphaltic surface patching (465.0110) | TON | 443 | $108.40 | $108.40 | $88.80 |
| 31 | Asphaltic surface driveways and field entrances (465.0120) | TON | 29 | $238.00 | $238.00 | $128.50 |
| 32 | Asphaltic rumble strips, transverse (465.0580) | SY | 72 | $83.00 | $83.00 | $60.00 |
| 33 | Culvert pipe temporary 48-inch (520.2048) | LF | 34 | $190.31 | $190.31 | $190.31 |
| 34 | Concrete collars for pipe (520.8000) | EACH | 3 | $895.83 | $895.83 | $895.83 |
| 35 | Cleaning culvert pipes (520.8700) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 |
| 36 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 80 | $186.00 | $186.00 | $186.00 |
| 37 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 392 | $248.38 | $248.38 | $248.38 |
| 38 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 60 | $338.67 | $338.67 | $338.67 |
| 39 | Culvert pipe reinforced concrete class IV 42-inch (522.0442) | LF | 90 | $450.40 | $450.40 | $450.40 |
| 40 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 6 | $1,728.29 | $1,728.29 | $1,728.29 |
| 41 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 16 | $2,318.75 | $2,318.75 | $2,318.75 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 2 | $3,301.06 | $3,301.06 | $3,301.06 |
| 43 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 2 | $3,903.33 | $3,903.33 | $3,903.33 |
| 44 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 50 | $265.30 | $265.30 | $265.30 |
| 45 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 2 | $1,996.63 | $1,996.63 | $1,996.63 |
| 46 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 6 | $152.17 | $152.17 | $152.17 |
| 47 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 12 | $211.45 | $211.45 | $211.45 |
| 48 | Manhole covers type J (611.0530) | EACH | 1 | $466.73 | $466.73 | $466.73 |
| 49 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $6,730.87 | $6,730.87 | $6,730.87 |
| 50 | Mobilization (619.1000) | EACH | 1 | $111,870 | $175,000 | $160,354 |
| 51 | Water (624.0100) | MGAL | 133.54 | $20.00 | $20.00 | $50.00 |
| 52 | Topsoil (625.0100) | SY | 3,292 | $4.35 | $4.35 | $4.35 |
| 53 | Silt fence (628.1504) | LF | 6,369 | $2.30 | $2.30 | $2.65 |
| 54 | Silt fence maintenance (628.1520) | LF | 6,369 | $0.01 | $0.01 | $0.08 |
| 55 | Mobilizations erosion control (628.1905) | EACH | 2 | $300.00 | $300.00 | $420.00 |
| 56 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $200.00 | $200.00 | $350.00 |
| 57 | Erosion mat class I type B (628.2004) | SY | 677 | $1.75 | $1.75 | $1.96 |
| 58 | Erosion mat urban class I type B (628.2008) | SY | 2,615 | $1.90 | $1.90 | $2.49 |
| 59 | Temporary ditch checks (628.7504) | LF | 188 | $9.00 | $9.00 | $8.95 |
| 60 | Culvert pipe checks (628.7555) | EACH | 68 | $18.00 | $18.00 | $21.30 |
| 61 | Fertilizer type B (629.0210) | CWT | 2.07 | $110.00 | $110.00 | $110.00 |
| 62 | Seeding mixture no. 20 (630.0120) | LB | 59 | $15.00 | $15.00 | $8.75 |
| 63 | Seed water (630.0500) | MGAL | 74 | $20.00 | $20.00 | $55.00 |
| 64 | Markers culvert end (633.5200) | EACH | 28 | $70.00 | $70.00 | $82.00 |
| 65 | Field office type B (642.5001) | EACH | 1 | $7,380.00 | $9,000.00 | $12,200 |
| 66 | Traffic control drums (643.0300) | DAY | 224 | $2.00 | $1.00 | $3.85 |
| 67 | Traffic control signs (643.0900) | DAY | 1,843 | $2.50 | $0.25 | $1.12 |
| 68 | Traffic control signs fixed message (643.1000) | SF | 36 | $29.00 | $15.00 | $33.26 |
| 69 | Temporary marking line paint 6- inch (643.3165) | LF | 25,300 | $0.65 | $0.23 | $0.65 |
| 70 | Traffic control (643.5000) | EACH | 1 | $3,800.00 | $10,200 | $23,498 |
| 71 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 87,580 | $1.35 | $1.40 | $1.35 |
| 72 | Cold weather marking epoxy 6-inch (646.6466) | LF | 87,580 | $0.01 | $0.01 | $0.30 |
| 73 | Locating no-passing zones (648.0100) | MI | 5.97 | $550.00 | $524.00 | $555.00 |
| 74 | Construction staking storm sewer (650.4000) | EACH | 1 | $58.00 | $58.00 | $425.00 |
| 75 | Construction staking pipe culverts (650.6000) | EACH | 14 | $159.27 | $159.27 | $70.00 |
| 76 | Construction staking resurfacing reference (650.8000) | LF | 31,503 | $0.09 | $0.09 | $0.10 |
| 77 | Construction staking supplemental control (project) 01. 6580-13-71 (650.9911) | EACH | 1 | $433.96 | $433.96 | $750.00 |
| 78 | Construction staking slope stakes (650.9920) | LF | 600 | $0.87 | $0.87 | $2.10 |
| 79 | Sawing asphalt (690.0150) | LF | 1,010 | $1.80 | $2.00 | $2.10 |
| 80 | Incentive iri ride (740.0440) | DOL | 23,900 | $1.00 | $1.00 | $1.00 |
| 81 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 |
| 82 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,260 | $5.00 | $5.00 | $5.00 |
| 83 | Special 01. reestablish section corner monuments (SPV.0060) | EACH | 13 | $650.00 | $650.00 | $800.00 |
| 84 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 1,759 | $10.00 | $10.00 | $7.80 |