WisDOT contract 20251014018 bid tabulation
Greenwood - Spencer; STH 73 to Helm Street (STH 098, Clark County Greenwood - Spencer). Let by Wisconsin DOT on October 14, 2025, Clark. 4 bids received; low bid $1,797,288 by Earth, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 OCT 2025
- Pay items
- 79
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Earth, Inc. | $1,797,288 | Low |
| 2 | Haas Sons, Inc. | $1,856,748 | +3.0% |
| 3 | Chippewa Concrete Services, Inc. | $1,934,013 | +8.0% |
| 4 | A-1 Excavating LLC | $2,197,699 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Earth, Inc. | 2. Haas Sons, Inc. | 3. Chippewa Concrete Services, Inc. | 4. A-1 Excavating LLC |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 1 | $1,000.00 | $1,835.00 | $20.00 | $500.00 |
| 2 | Grubbing (201.0205) | STA | 1 | $1,000.00 | $1,835.00 | $20.00 | $500.00 |
| 3 | Removing structure (structure) 01. sta 37+77 (203.0220) | EACH | 1 | $25,000 | $22,940 | $4,850.00 | $40,000 |
| 4 | Removing concrete pavement (204.0100) | SY | 3,226 | $8.00 | $9.86 | $8.05 | $9.00 |
| 5 | Excavation common (205.0100) | CY | 2,714 | $24.00 | $26.64 | $14.35 | $21.00 |
| 6 | Backfill granular grade 2 (209.2500) | TON | 460 | $30.00 | $21.54 | $19.65 | $80.00 |
| 7 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 67 | $10.00 | $0.01 | $175.00 | $385.00 |
| 8 | Finishing roadway (project) 01. 7040-00-72 (213.0100) | EACH | 1 | $10,000 | $1.00 | $7,500.00 | $650.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 3,110 | $16.50 | $22.79 | $9.00 | $28.00 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,590 | $14.50 | $15.21 | $17.20 | $22.00 |
| 11 | Concrete pavement 9-inch (415.0090) | SY | 3,226 | $66.00 | $65.60 | $75.03 | $72.00 |
| 12 | Drilled tie bars (416.0610) | EACH | 709 | $10.00 | $9.85 | $11.16 | $11.00 |
| 13 | Drilled dowel bars (416.0620) | EACH | 340 | $13.00 | $12.27 | $16.02 | $14.00 |
| 14 | Concrete pavement repair shes (416.1715) | SY | 500 | $130.00 | $154.37 | $200.20 | $150.00 |
| 15 | Concrete pavement replacement (416.1720) | SY | 1,090 | $110.00 | $122.72 | $116.99 | $135.00 |
| 16 | Concrete pavement replacement shes (416.1725) | SY | 1,065 | $111.00 | $134.45 | $200.20 | $140.00 |
| 17 | Asphaltic surface temporary (465.0125) | TON | 569 | $150.00 | $140.90 | $140.90 | $155.00 |
| 18 | Concrete collars for pipe (520.8000) | EACH | 12 | $1,500.00 | $2,180.67 | $700.00 | $1,600.00 |
| 19 | Cleaning culvert pipes (520.8700) | EACH | 12 | $1,200.00 | $1,166.00 | $1,166.00 | $2,600.00 |
| 20 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 6 | $300.00 | $480.67 | $510.00 | $560.00 |
| 21 | Culvert pipe reinforced concrete class IV 42-inch (522.0442) | LF | 8 | $405.00 | $580.75 | $610.00 | $700.00 |
| 22 | Culvert pipe reinforced concrete class IV 48-inch (522.0448) | LF | 54 | $550.00 | $674.00 | $630.00 | $656.00 |
| 23 | Culvert pipe reinforced concrete class IV 60-inch (522.0460) | LF | 240 | $520.00 | $603.66 | $815.00 | $667.00 |
| 24 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $2,500.00 | $1,981.00 | $3,850.00 | $2,455.00 |
| 25 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 2 | $3,400.00 | $2,581.00 | $3,750.00 | $3,075.00 |
| 26 | Apron endwalls for culvert pipe reinforced concrete 60-inch (522.1060) | EACH | 6 | $5,200.00 | $4,602.00 | $5,800.00 | $5,390.00 |
| 27 | Concrete barrier temporary precast delivered (603.8000) | LF | 5,132 | $11.00 | $16.00 | $10.02 | $18.00 |
| 28 | Concrete barrier temporary precast installed (603.8125) | LF | 5,132 | $7.00 | $4.00 | $6.40 | $4.50 |
| 29 | Anchoring concrete barrier temporary precast (603.8500) | LF | 100 | $20.00 | $12.00 | $15.25 | $13.00 |
| 30 | Riprap medium (606.0200) | CY | 52 | $125.00 | $90.91 | $185.00 | $300.00 |
| 31 | Pipe grates (size) 01. 30-inch (611.9850.S) | EACH | 1 | $3,200.00 | $1,321.00 | $2,300.00 | $1,300.00 |
| 32 | Pipe grates (size) 02. 36-inch (611.9850.S) | EACH | 2 | $4,050.00 | $1,821.00 | $3,300.00 | $1,900.00 |
| 33 | Pipe grates (size) 03. 60-inch (611.9850.S) | EACH | 3 | $8,250.00 | $3,794.67 | $7,300.00 | $4,200.00 |
| 34 | Crash cushions temporary (614.0905) | EACH | 10 | $5,200.00 | $1,652.37 | $4,750.00 | $3,350.00 |
| 35 | Maintenance and repair of haul roads (project) 01. 7040-00-72 (618.0100) | EACH | 1 | $100.00 | $1.00 | $1,000.00 | $2,575.00 |
| 36 | Mobilization (619.1000) | EACH | 1 | $48,000 | $100,412 | $127,200 | $184,000 |
| 37 | Water (624.0100) | MGAL | 58 | $35.00 | $53.45 | $48.00 | $65.00 |
| 38 | Topsoil (625.0100) | SY | 1,813 | $5.00 | $7.52 | $4.95 | $9.00 |
| 39 | Silt fence (628.1504) | LF | 3,488 | $2.00 | $2.25 | $2.30 | $2.50 |
| 40 | Silt fence maintenance (628.1520) | LF | 3,488 | $0.01 | $0.03 | $0.08 | $0.05 |
| 41 | Mobilizations erosion control (628.1905) | EACH | 6 | $300.00 | $205.00 | $420.00 | $220.00 |
| 42 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $200.00 | $255.00 | $350.00 | $280.00 |
| 43 | Erosion mat urban class I type A (628.2006) | SY | 1,813 | $2.00 | $2.85 | $2.19 | $3.00 |
| 44 | Turbidity barriers (628.6005) | SY | 65 | $56.00 | $51.00 | $44.00 | $56.00 |
| 45 | Culvert pipe checks (628.7555) | EACH | 80 | $16.00 | $25.00 | $21.30 | $27.00 |
| 46 | Fertilizer type B (629.0210) | CWT | 2.80 | $170.00 | $125.00 | $90.00 | $132.50 |
| 47 | Seeding mixture no. 10 (630.0110) | LB | 92 | $15.00 | $11.15 | $12.20 | $12.00 |
| 48 | Seeding temporary (630.0200) | LB | 92 | $5.00 | $5.13 | $4.20 | $5.00 |
| 49 | Seed water (630.0500) | MGAL | 42 | $1.00 | $5.00 | $10.00 | $5.00 |
| 50 | Markers culvert end (633.5200) | EACH | 14 | $65.00 | $82.00 | $91.00 | $90.00 |
| 51 | Field office type B (642.5001) | EACH | 1 | $8,000.00 | $25,300 | $7,500.00 | $9,000.00 |
| 52 | Traffic control drums (643.0300) | DAY | 5,450 | $0.55 | $0.50 | $0.15 | $0.16 |
| 53 | Traffic control barricades type III (643.0420) | DAY | 170 | $0.60 | $0.50 | $0.50 | $0.55 |
| 54 | Traffic control warning lights type A (643.0705) | DAY | 340 | $0.20 | $0.10 | $0.15 | $0.20 |
| 55 | Traffic control warning lights type C (643.0715) | DAY | 3,740 | $0.13 | $0.10 | $0.15 | $0.20 |
| 56 | Traffic control signs (643.0900) | DAY | 6,602 | $1.10 | $1.00 | $0.15 | $0.20 |
| 57 | Traffic control signs PCMS (643.1050) | DAY | 14 | $60.00 | $40.00 | $11.00 | $12.00 |
| 58 | Temporary marking line removable contrast tape 6-inch (643.3185) | LF | 11,261 | $5.70 | $5.70 | $2.55 | $2.80 |
| 59 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 120 | $10.00 | $5.00 | $7.00 | $7.50 |
| 60 | Traffic control (643.5000) | EACH | 1 | $12,000 | $2,065.00 | $26,200 | $53,000 |
| 61 | Geotextile type HR (645.0120) | SY | 103 | $7.00 | $7.53 | $9.00 | $7.00 |
| 62 | Geogrid type SR (645.0220) | SY | 5,530 | $3.50 | $1.40 | $3.60 | $2.00 |
| 63 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 71,483 | $1.60 | $1.56 | $1.45 | $1.55 |
| 64 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 464 | $3.25 | $3.00 | $3.00 | $3.20 |
| 65 | Marking stop line epoxy 18-inch (646.6120) | LF | 40 | $30.00 | $27.00 | $16.50 | $18.00 |
| 66 | Marking curb epoxy (646.8120) | LF | 83 | $12.00 | $10.00 | $8.00 | $9.00 |
| 67 | Marking removal line water blasting 4-inch (646.9010) | LF | 6,212 | $1.30 | $1.00 | $1.00 | $1.10 |
| 68 | Construction staking subgrade (650.4500) | LF | 1,313 | $1.00 | $0.51 | $0.25 | $0.70 |
| 69 | Construction staking pipe culverts (650.6000) | EACH | 3 | $300.00 | $300.00 | $165.00 | $320.00 |
| 70 | Construction staking concrete pavement (650.7000) | LF | 1,313 | $3.10 | $3.00 | $1.75 | $3.20 |
| 71 | Construction staking supplemental control (project) 01. 7040-00-72 (650.9911) | EACH | 1 | $2,500.00 | $2,349.40 | $2,000.00 | $2,500.00 |
| 72 | Construction staking slope stakes (650.9920) | LF | 1,313 | $2.60 | $2.60 | $1.00 | $3.00 |
| 73 | Temporary traffic signals for bridges (structure) 01. pavement replacement (661.0101) | EACH | 5 | $10,000 | $7,080.00 | $2,215.00 | $2,500.00 |
| 74 | Sawing concrete (690.0250) | LF | 5,747 | $4.00 | $2.25 | $2.35 | $3.00 |
| 75 | Incentive compressive strength concrete pavement (715.0720) | DOL | 970 | $1.00 | $1.00 | $1.00 | $1.00 |
| 76 | Special 01. recondition culvert ends 30-inch (SPV.0060) | EACH | 5 | $1,600.00 | $1,971.96 | $1,500.00 | $2,800.00 |
| 77 | Special 02. recondition culvert ends 36-inch (SPV.0060) | EACH | 4 | $1,800.00 | $1,978.96 | $1,500.00 | $2,900.00 |
| 78 | Special 03. recondition culvert ends 42-inch (SPV.0060) | EACH | 17 | $2,500.00 | $2,585.63 | $2,400.00 | $3,800.00 |
| 79 | Special 04. recondition culvert ends 48-inch (SPV.0060) | EACH | 22 | $2,800.00 | $2,111.52 | $2,450.00 | $3,700.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.