WisDOT contract 20251014022 bid tabulation
8080-08-75. Let by Wisconsin DOT on October 14, 2025, St Croix. 2 bids received; low bid $9,963,499 by Chippewa Concrete Services, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 OCT 2025
- Pay items
- 117
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Chippewa Concrete Services, Inc. | $9,963,499 | Low |
| 2 | Michels Road & Stone, Inc. | $10,611,840 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Chippewa Concrete Services, Inc. | 2. Michels Road & Stone, Inc. |
|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 6 | $1.00 | $1.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 79 | $17.50 | $17.50 |
| 3 | Removing concrete pavement butt joints (204.0105) | SY | 2,040 | $18.20 | $18.20 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 1,236 | $24.60 | $24.60 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 107,025 | $4.49 | $4.49 |
| 6 | Removing guardrail (204.0165) | LF | 5,108 | $3.75 | $3.75 |
| 7 | Removing surface drains (204.0190) | EACH | 3 | $700.00 | $700.00 |
| 8 | Removing inlets (204.0220) | EACH | 1 | $350.00 | $350.00 |
| 9 | Removing storm sewer (size) 01. 24-inch (204.0245) | LF | 5 | $70.50 | $70.50 |
| 10 | Excavation common (205.0100) | CY | 1,482 | $7.04 | $7.04 |
| 11 | Borrow (208.0100) | CY | 2,615 | $26.15 | $26.15 |
| 12 | Prepare foundation for asphaltic paving (project) 01. 8080-08-75 (211.0101) | EACH | 1 | $204,300 | $204,300 |
| 13 | Prepare foundation for asphaltic paving (project) 02. 8110-00-79 (211.0101) | EACH | 1 | $148,000 | $148,000 |
| 14 | Finishing roadway (project) 01. 8080-08-75 (213.0100) | EACH | 1 | $7,500.00 | $2,500.00 |
| 15 | Finishing roadway (project) 02. 8110-00-79 (213.0100) | EACH | 1 | $5,000.00 | $2,500.00 |
| 16 | Base aggregate dense 3/4-inch (305.0110) | TON | 15,055 | $29.79 | $29.79 |
| 17 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,130 | $19.60 | $25.00 |
| 18 | Concrete pavement 6-inch (415.0060) | SY | 75 | $115.00 | $124.05 |
| 19 | Drilled tie bars (416.0610) | EACH | 12,325 | $11.03 | $17.35 |
| 20 | Drilled dowel bars (416.0620) | EACH | 4,096 | $15.59 | $20.68 |
| 21 | Tack coat (455.0605) | GAL | 22,058 | $3.44 | $3.44 |
| 22 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $12,280 | $12,280 |
| 23 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $2,180.00 | $2,180.00 |
| 24 | Incentive density HMA pavement (460.2000) | DOL | 11,200 | $1.00 | $1.00 |
| 25 | Incentive density PWL HMA pavement (460.2005) | DOL | 13,570 | $1.00 | $1.00 |
| 26 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 11,090 | $1.00 | $1.00 |
| 27 | Incentive air voids HMA pavement (460.2010) | DOL | 14,150 | $1.00 | $1.00 |
| 28 | HMA pavement 4 LT 58-34 S (460.5244) | TON | 17,505 | $99.05 | $99.05 |
| 29 | HMA pavement 5 MT 58-34 V (460.6645) | TON | 14,147 | $94.34 | $94.34 |
| 30 | Material transfer vehicle (460.9000.S) | EACH | 1 | $23,200 | $23,200 |
| 31 | Asphaltic surface patching (465.0110) | TON | 1,329 | $65.00 | $65.00 |
| 32 | Asphaltic rumble strips, shoulder (465.0520) | LF | 243,566 | $0.12 | $0.14 |
| 33 | Concrete collars for pipe (520.8000) | EACH | 1 | $1,100.00 | $1,100.00 |
| 34 | Cleaning culvert pipes (520.8700) | EACH | 8 | $880.00 | $880.00 |
| 35 | Apron endwalls for culvert pipe salvaged 27-inch (524.0627) | EACH | 1 | $585.00 | $585.00 |
| 36 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 185 | $61.87 | $117.09 |
| 37 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 168 | $61.87 | $117.09 |
| 38 | Concrete surface drains (602.3010) | CY | 4.30 | $1,501.27 | $1,200.00 |
| 39 | Riprap medium (606.0200) | CY | 6.60 | $215.00 | $215.00 |
| 40 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 5 | $207.00 | $207.00 |
| 41 | Inlets median 2 grate (611.3902) | EACH | 1 | $3,725.00 | $3,725.00 |
| 42 | Salvaged inlet covers (611.9710) | EACH | 2 | $400.00 | $400.00 |
| 43 | Steel thrie beam bullnose terminal (614.0220) | EACH | 18 | $13,850 | $13,850 |
| 44 | Steel thrie beam (614.0230) | LF | 1,775 | $36.00 | $36.00 |
| 45 | Adjusting steel plate beam guard (614.0400) | LF | 1,250 | $7.00 | $7.00 |
| 46 | MGS guardrail 3 (614.2300) | LF | 1,650 | $21.25 | $21.25 |
| 47 | MGS thrie beam transition (614.2500) | LF | 275.80 | $82.85 | $82.85 |
| 48 | MGS guardrail terminal eat (614.2610) | EACH | 6 | $3,250.00 | $3,250.00 |
| 49 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $3,022.00 | $3,022.00 |
| 50 | Maintenance and repair of haul roads (project) 01. 8080-08-75 (618.0100) | EACH | 1 | $1,000.00 | $0.01 |
| 51 | Maintenance and repair of haul roads (project) 02. 8110-00-79 (618.0100) | EACH | 1 | $1,000.00 | $0.01 |
| 52 | Mobilization (619.1000) | EACH | 1 | $806,061 | $1,224,356 |
| 53 | Concrete median blunt nose (620.0200) | SF | 80 | $16.90 | $30.00 |
| 54 | Concrete median sloped nose (620.0300) | SF | 360 | $16.90 | $15.00 |
| 55 | Water (624.0100) | MGAL | 161.90 | $38.10 | $38.10 |
| 56 | Salvaged topsoil (625.0500) | SY | 52,400 | $1.75 | $1.75 |
| 57 | Silt fence (628.1504) | LF | 1,000 | $1.89 | $1.89 |
| 58 | Silt fence maintenance (628.1520) | LF | 1,000 | $0.01 | $0.01 |
| 59 | Mobilizations erosion control (628.1905) | EACH | 8 | $650.00 | $650.00 |
| 60 | Mobilizations emergency erosion control (628.1910) | EACH | 8 | $10.00 | $10.00 |
| 61 | Erosion mat urban class I type B (628.2008) | SY | 52,400 | $1.47 | $1.47 |
| 62 | Inlet protection type A (628.7005) | EACH | 29 | $150.00 | $150.00 |
| 63 | Temporary ditch checks (628.7504) | LF | 820 | $6.90 | $6.90 |
| 64 | Fertilizer type B (629.0210) | CWT | 33.05 | $73.00 | $73.00 |
| 65 | Seeding mixture no. 30 (630.0130) | LB | 2,355 | $7.40 | $7.40 |
| 66 | Seeding temporary (630.0200) | LB | 1,180 | $1.30 | $1.30 |
| 67 | Seed water (630.0500) | MGAL | 1,180 | $1.00 | $1.00 |
| 68 | Sign supports replacing base connection bolts (635.0300) | EACH | 22 | $317.00 | $317.00 |
| 69 | Signs type I reflective SH (637.1220) | SF | 3,824 | $29.30 | $29.30 |
| 70 | Removing signs type I (638.2601) | EACH | 36 | $1.00 | $1.00 |
| 71 | Field office type B (642.5001) | EACH | 1 | $12,500 | $30,000 |
| 72 | Traffic control drums (643.0300) | DAY | 308,075 | $0.18 | $0.18 |
| 73 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 477 | $103.02 | $103.02 |
| 74 | Traffic control barricades type III (643.0420) | DAY | 796 | $0.52 | $0.52 |
| 75 | Traffic control warning lights type A (643.0705) | DAY | 1,432 | $0.22 | $0.22 |
| 76 | Traffic control warning lights type C (643.0715) | DAY | 4,296 | $0.19 | $0.19 |
| 77 | Connected arrow board (643.0810.S) | DAY | 636 | $29.63 | $29.63 |
| 78 | Traffic control signs (643.0900) | DAY | 9,324 | $0.44 | $0.44 |
| 79 | Traffic control covering signs type I (643.0910) | EACH | 19 | $79.29 | $79.29 |
| 80 | Traffic control covering signs type II (643.0920) | EACH | 24 | $125.48 | $125.48 |
| 81 | Traffic control signs PCMS (643.1050) | DAY | 362 | $54.00 | $54.00 |
| 82 | Portable automated real-time traffic queue warning system (643.1200.S) | DAY | 255 | $207.28 | $207.28 |
| 83 | Connected work zone start and end location markers (643.1220.S) | DAY | 1,272 | $3.28 | $3.28 |
| 84 | Temporary marking line paint 6- inch (643.3165) | LF | 229,600 | $0.18 | $0.19 |
| 85 | Temporary marking line removable tape 6-inch (643.3180) | LF | 5,280 | $2.27 | $2.27 |
| 86 | Traffic control (643.5000) | EACH | 1 | $15,731 | $15,731 |
| 87 | Geotextile type HR (645.0120) | SY | 13 | $6.20 | $6.20 |
| 88 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 34,020 | $0.81 | $0.92 |
| 89 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 344,480 | $1.24 | $1.40 |
| 90 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 18,317 | $2.66 | $2.50 |
| 91 | Marking symbol epoxy (646.5220) | EACH | 10 | $349.89 | $350.00 |
| 92 | Marking aerial enforcement bar epoxy (646.5420) | EACH | 12 | $357.79 | $165.00 |
| 93 | Marking stop line epoxy 18-inch (646.6120) | LF | 406 | $15.09 | $29.00 |
| 94 | Marking chevron epoxy 24-inch (646.7220) | LF | 100 | $24.76 | $22.00 |
| 95 | Marking island nose epoxy (646.8220) | EACH | 4 | $270.75 | $330.00 |
| 96 | Marking removal line 4-inch (646.9000) | LF | 344,480 | $0.12 | $0.08 |
| 97 | Marking removal line 8-inch (646.9100) | LF | 14,161 | $0.44 | $0.17 |
| 98 | Construction staking storm sewer (650.4000) | EACH | 15 | $300.00 | $300.00 |
| 99 | Construction staking base (650.5000) | LF | 185 | $1.00 | $1.00 |
| 100 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 185 | $4.00 | $4.00 |
| 101 | Construction staking resurfacing reference (650.8000) | LF | 102,629 | $0.06 | $0.06 |
| 102 | Construction staking supplemental control (project) 01. 8080-08-75 (650.9911) | EACH | 1 | $3,000.00 | $3,000.00 |
| 103 | Construction staking supplemental control (project) 02. 8110-00-79 (650.9911) | EACH | 1 | $3,000.00 | $3,000.00 |
| 104 | Construction staking slope stakes (650.9920) | LF | 8,324 | $0.80 | $0.80 |
| 105 | Sawing asphalt (690.0150) | LF | 5,908 | $2.10 | $1.75 |
| 106 | Sawing concrete (690.0250) | LF | 34,893 | $2.10 | $2.55 |
| 107 | Incentive iri ride (740.0440) | DOL | 20,436 | $1.00 | $1.00 |
| 108 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 |
| 109 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,000 | $5.00 | $5.00 |
| 110 | Special 01. fill erosion (SPV.0060) | EACH | 4 | $1,190.00 | $1,190.00 |
| 111 | Special 02. reconstructing inlets median 2 grate (SPV.0060) | EACH | 14 | $980.00 | $980.00 |
| 112 | Special 01. asphaltic mastic joint sealing (SPV.0090) | LF | 27,602 | $11.75 | $11.75 |
| 113 | Special 02. cleaning ditch (SPV.0090) | LF | 825 | $9.80 | $9.80 |
| 114 | Special 01. concrete pavement repair doweled (SPV.0180) | SY | 2,199 | $107.03 | $99.08 |
| 115 | Special 02. concrete pavement replacement doweled (SPV.0180) | SY | 12,619 | $107.03 | $109.74 |
| 116 | Special 03. 30" concrete centerline repair (SPV.0180) | SY | 2,941 | $126.11 | $132.51 |
| 117 | Special 04. salvage and shape riprap (SPV.0180) | SY | 204 | $17.60 | $17.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.