WisDOT contract 20251014025 bid tabulation

Clam Lake - Mellen; Mccarthy Creek Bridge B-02-0075 (CTH GG, Ashland County Clam Lake - Mellen). Let by Wisconsin DOT on October 14, 2025, Ashland. 5 bids received; low bid $665,275 by Larson Construction Co., Inc..

Owner
Wisconsin DOT
Letting
14 OCT 2025
Pay items
66
Data through
10 NOV 2026

4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Larson Construction Co., Inc.$665,275Low
2Radtke Contractors Inc.$668,924+1.0%
4Janke General Contractors, Inc.$695,956+5.0%
5Northland Constructors of Duluth, Mathy$848,455+28%
WisDOT contract 20251014025: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Larson Construction Co., Inc.2. Radtke Contractors Inc.3. Janke General Contractors, Inc.4. Northland Constructors of Duluth, Mathy
1Grubbing (201.0205)STA3$415.00$900.00$300.00$415.00
2Removing structure over waterway minimal debris (structure) 01. B-02- 0423 (203.0260)EACH1$24,920$57,469$18,999$17,500
3Removing guardrail (204.0165)LF675$3.00$3.00$3.00$3.00
4Excavation common (205.0100)CY749$20.41$15.00$14.00$20.41
5Excavation, hauling, and disposal of creosote contaminated soil (205.0506.S)TON105$239.00$52.00$160.00$72.55
6Excavation for structures bridges (structure) 01. B-02-0075 (206.1001)EACH1$22,320$18,500$19,000$14,500
7Borrow (208.0100)CY16$5.36$25.00$100.00$5.36
8Backfill structure type A (210.1500)TON372$33.02$28.00$30.00$33.02
9Finishing roadway (project) 01. 8530-00-75 (213.0100)EACH1$2,500.00$1.00$350.00$2,000.00
10Base aggregate dense 3/4-inch (305.0110)TON180$28.57$25.10$42.00$28.57
11Base aggregate dense 1 1/4-inch (305.0120)TON2,200$23.30$24.70$29.00$23.30
12Tack coat (455.0605)GAL110$3.85$3.85$3.85$3.85
13Asphaltic surface (465.0105)TON440$129.08$129.08$129.08$129.08
14Concrete masonry bridges (502.0100)CY122$841.00$793.43$1,100.00$2,000.00
15Protective surface treatment (502.3200)SY165$4.00$3.69$5.00$21.00
16Bar steel reinforcement HS structures (505.0400)LB4,560$1.80$1.47$2.10$1.65
17Bar steel reinforcement HS coated structures (505.0600)LB16,300$1.80$1.43$2.10$1.50
18Railing tubular type M (513.4061)LF74$340.00$298.56$390.00$400.00
19Rubberized membrane waterproofing (516.0500)SY12$70.00$59.04$40.00$125.00
20Piling cip concrete 10 3/4 X 0.25- inch (550.2104)LF855$60.00$39.92$74.00$45.00
21Riprap heavy (606.0300)CY198$116.06$85.00$88.00$116.06
22Pipe underdrain wrapped 6-inch (612.0406)LF146$14.85$22.00$13.00$14.85
23MGS guardrail 3 (614.2300)LF300$29.00$29.00$29.00$29.00
24MGS thrie beam transition (614.2500)LF157.60$92.50$92.50$92.50$92.50
25MGS guardrail terminal eat (614.2610)EACH4$3,503.00$3,503.00$3,503.00$3,503.00
26Maintenance and repair of haul roads (project) 01. 8530-00-75 (618.0100)EACH1$500.00$250.00$350.00$500.00
27Mobilization (619.1000)EACH1$76,000$128,557$80,000$153,969
28Water (624.0100)MGAL48$130.33$50.00$10.00$130.33
29Topsoil (625.0100)SY1,600$8.75$4.00$6.00$8.75
30Silt fence (628.1504)LF1,150$2.55$2.55$2.55$2.55
31Silt fence maintenance (628.1520)LF2,300$0.02$0.02$0.02$0.02
32Mobilizations erosion control (628.1905)EACH4$201.00$201.00$200.00$201.00
33Mobilizations emergency erosion control (628.1910)EACH2$301.00$301.00$200.00$301.00
34Erosion mat urban class I type B (628.2008)SY1,600$2.85$2.85$2.85$2.85
35Turbidity barriers (628.6005)SY200$45.00$45.00$45.00$45.00
36Temporary ditch checks (628.7504)LF150$9.75$9.75$9.75$9.75
37Rock bags (628.7570)EACH100$8.25$8.25$8.25$8.25
38Fertilizer type B (629.0210)CWT1.50$130.00$130.00$130.00$130.00
39Seeding mixture no. 20 (630.0120)LB80$9.55$9.55$9.55$9.55
40Seeding temporary (630.0200)LB50$4.95$4.95$4.95$4.95
41Seed water (630.0500)MGAL40$5.00$5.00$5.00$5.00
42Posts wood 4X6-inch X 12-FT (634.0612)EACH4$125.00$125.00$125.00$125.00
43Signs type II reflective F (637.2230)SF12$50.00$50.00$50.00$50.00
44Removing signs type II (638.2602)EACH5$35.00$35.00$35.00$35.00
45Removing small sign supports (638.3000)EACH5$35.00$35.00$35.00$35.00
46Field office type B (642.5001)EACH1$4,000.00$2,938.72$2,500.00$12,500
47Traffic control barricades type III (643.0420)DAY2,100$0.55$0.55$0.55$0.55
48Traffic control warning lights type A (643.0705)DAY4,200$0.10$0.10$0.10$0.10
49Traffic control signs (643.0900)DAY12,200$0.55$0.55$0.55$0.55
50Traffic control covering signs type II (643.0920)EACH16$30.00$30.00$30.00$30.00
51Traffic control signs fixed message (643.1000)SF36$10.90$10.90$10.90$10.90
52Traffic control (643.5000)EACH1$3,600.00$3,600.00$3,600.00$3,600.00
53Geotextile type DF schedule A (645.0111)SY92$2.00$3.00$3.00$2.00
54Geotextile type HR (645.0120)SY395$2.02$5.00$4.00$2.02
55Marking line paint 6-inch (646.2005)LF2,000$3.50$3.50$3.50$3.50
56Construction staking subgrade (650.4500)LF466$1.00$1.00$0.01$1.00
57Construction staking base (650.5000)LF466$1.50$1.50$5.15$1.50
58Construction staking structure layout (structure) 01. B-02-0075 (650.6501)EACH1$3,500.00$3,500.00$5,500.00$3,500.00
59Construction staking supplemental control (project) 01. 8530-00-75 (650.9911)EACH1$1,500.00$1,500.00$1.00$1,500.00
60Construction staking slope stakes (650.9920)LF466$1.25$1.25$5.15$1.25
61Sawing asphalt (690.0150)LF60$2.93$10.00$2.45$2.93
62Incentive strength concrete structures (715.0502)DOL732$1.00$1.00$1.00$1.00
63Maintaining bird deterrent system (station) 01. 628+50 (999.2005.S)EACH1$4,500.00$0.01$2,500.00$5,000.00
64On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00
65On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00$5.00$5.00$5.00
66Special 01. flashing stainless steel (SPV.0090)LF59$95.00$105.67$66.00$70.00
WisDOT contract 20251014025: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy