WisDOT contract 20251111017 bid tabulation
C Menasha, CTH P; STH 47 to Midway Road (CTH P, Winnebago County C Menasha, CTH P). Let by Wisconsin DOT on November 11, 2025, Winnebago. 4 bids received; low bid $9,884,337 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 199
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $9,884,337 | Low |
| 2 | Michels Road & Stone, Inc. | $10,042,222 | +2.0% |
| 3 | Dorner Inc. | $10,762,238 | +9.0% |
| 4 | Zignego Company, Inc. | $11,278,273 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Michels Road & Stone, Inc. | 3. Dorner Inc. | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 29 | $1.00 | $597.60 | $1.10 | $1.00 |
| 2 | Clearing (201.0120) | ID | 140 | $0.10 | $49.10 | $0.10 | $0.10 |
| 3 | Grubbing (201.0205) | STA | 29 | $1.00 | $349.70 | $1.10 | $1.00 |
| 4 | Grubbing (201.0220) | ID | 140 | $0.10 | $12.95 | $0.10 | $0.10 |
| 5 | Removing small pipe culverts (203.0100) | EACH | 65 | $340.00 | $700.00 | $200.00 | $145.00 |
| 6 | Removing concrete pavement (204.0100) | SY | 3,970 | $10.00 | $10.00 | $7.40 | $4.48 |
| 7 | Removing asphaltic surface (204.0110) | SY | 800 | $5.63 | $5.00 | $4.60 | $3.86 |
| 8 | Removing curb (204.0130) | LF | 18 | $10.00 | $10.00 | $15.00 | $8.00 |
| 9 | Removing curb & gutter (204.0150) | LF | 530 | $5.00 | $5.00 | $4.00 | $4.45 |
| 10 | Removing concrete bases (204.0195) | EACH | 1 | $200.00 | $200.00 | $450.00 | $152.00 |
| 11 | Removing manholes (204.0210) | EACH | 7 | $523.00 | $500.00 | $605.00 | $605.00 |
| 12 | Removing inlets (204.0220) | EACH | 18 | $358.00 | $450.00 | $305.00 | $305.00 |
| 13 | Removing storm sewer (size) 01. 10-inch (204.0245) | LF | 53 | $20.00 | $20.00 | $12.00 | $12.00 |
| 14 | Removing storm sewer (size) 02. 12-inch (204.0245) | LF | 180 | $21.00 | $20.00 | $13.00 | $13.00 |
| 15 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 460 | $40.00 | $23.00 | $14.00 | $14.00 |
| 16 | Removing storm sewer (size) 04. 24-inch (204.0245) | LF | 400 | $22.00 | $26.00 | $15.00 | $15.00 |
| 17 | Removing storm sewer (size) 05. 36-inch (204.0245) | LF | 210 | $54.00 | $42.00 | $18.00 | $18.00 |
| 18 | Removing storm sewer (size) 06. 60-inch (204.0245) | LF | 66 | $98.00 | $50.00 | $30.00 | $30.00 |
| 19 | Sealing pipes (204.0280) | EACH | 9 | $715.00 | $725.00 | $605.00 | $605.00 |
| 20 | Removing (item description) 01. fence post (204.9060.S) | EACH | 1 | $200.00 | $350.00 | $377.00 | $350.00 |
| 21 | Removing (item description) 01. concrete block retaining wall (204.9090.S) | LF | 340 | $6.90 | $10.00 | $10.00 | $16.35 |
| 22 | Excavation common (205.0100) | CY | 44,010 | $39.69 | $14.30 | $21.50 | $21.15 |
| 23 | Finishing roadway (project) 01. 4646-02-71 (213.0100) | EACH | 1 | $5,000.00 | $10,000 | $5,000.00 | $2,000.00 |
| 24 | Base aggregate dense 3/4-inch (305.0110) | TON | 30 | $99.50 | $100.00 | $45.90 | $64.25 |
| 25 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 21,700 | $13.33 | $14.90 | $16.20 | $21.50 |
| 26 | Base aggregate open-graded (310.0115) | CY | 47 | $55.00 | $65.00 | $50.00 | $50.00 |
| 27 | Select crushed material (312.0110) | TON | 34,300 | $0.01 | $10.30 | $19.30 | $17.15 |
| 28 | Concrete pavement 9-inch (415.0090) | SY | 30,780 | $57.37 | $49.99 | $61.70 | $69.64 |
| 29 | Concrete pavement gaps (415.0210) | EACH | 41 | $0.01 | $500.00 | $0.01 | $1.00 |
| 30 | Concrete pavement hes 9-inch (415.1090) | SY | 3,000 | $60.37 | $92.26 | $65.00 | $77.50 |
| 31 | Concrete pavement joint filling (415.4100) | SY | 39,310 | $1.75 | $1.78 | $1.90 | $1.78 |
| 32 | Drilled tie bars (416.0610) | EACH | 32 | $10.00 | $12.58 | $10.80 | $30.00 |
| 33 | Drilled dowel bars (416.0620) | EACH | 136 | $16.50 | $16.56 | $17.80 | $30.00 |
| 34 | Tack coat (455.0605) | GAL | 261 | $5.95 | $5.95 | $6.40 | $5.95 |
| 35 | Incentive density HMA pavement (460.2000) | DOL | 430 | $1.00 | $1.00 | $1.00 | $1.00 |
| 36 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 372 | $123.45 | $123.45 | $132.90 | $123.45 |
| 37 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 292 | $134.45 | $134.45 | $144.70 | $134.45 |
| 38 | Asphaltic surface (465.0105) | TON | 185 | $114.75 | $114.75 | $123.50 | $114.75 |
| 39 | Asphaltic surface driveways and field entrances (465.0120) | TON | 635 | $197.75 | $197.75 | $212.80 | $197.75 |
| 40 | Asphaltic surface temporary (465.0125) | TON | 400 | $0.01 | $171.45 | $184.50 | $171.45 |
| 41 | Asphaltic curb (465.0310) | LF | 100 | $25.00 | $25.00 | $26.90 | $25.00 |
| 42 | Concrete collars for pipe (520.8000) | EACH | 3 | $912.00 | $700.00 | $1,450.00 | $1,450.00 |
| 43 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 2 | $1,076.00 | $1,200.00 | $1,670.00 | $1,670.00 |
| 44 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 2 | $1,395.00 | $1,435.00 | $1,985.00 | $1,985.00 |
| 45 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 2 | $2,147.00 | $2,317.00 | $2,890.00 | $2,890.00 |
| 46 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 53X83-inch (522.2653) | EACH | 1 | $13,300 | $5,658.00 | $6,090.00 | $6,090.00 |
| 47 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 920 | $29.65 | $27.00 | $31.90 | $23.25 |
| 48 | Concrete curb & gutter integral 30- inch type D (601.0452) | LF | 11,470 | $25.00 | $20.00 | $26.90 | $23.58 |
| 49 | Concrete curb pedestrian (601.0600) | LF | 220 | $45.00 | $45.00 | $48.40 | $55.00 |
| 50 | Concrete sidewalk 4-inch (602.0405) | SF | 52,390 | $6.70 | $6.65 | $7.20 | $6.42 |
| 51 | Concrete sidewalk 6-inch (602.0415) | SF | 2,240 | $7.95 | $7.00 | $8.60 | $7.33 |
| 52 | Curb ramp detectable warning field natural patina (602.0515) | SF | 600 | $32.00 | $38.00 | $34.40 | $35.00 |
| 53 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 32 | $60.00 | $58.00 | $64.60 | $59.00 |
| 54 | Concrete driveway 6-inch (602.0810) | SY | 50 | $69.50 | $63.00 | $74.80 | $65.97 |
| 55 | Concrete driveway 8-inch (602.0820) | SY | 1,580 | $80.50 | $67.50 | $86.60 | $71.90 |
| 56 | Concrete driveway hes 8-inch (602.0870) | SY | 650 | $83.00 | $68.50 | $89.30 | $76.00 |
| 57 | Riprap light (606.0100) | CY | 40 | $105.25 | $100.00 | $73.10 | $67.70 |
| 58 | Riprap medium (606.0200) | CY | 9 | $126.11 | $100.00 | $96.50 | $54.85 |
| 59 | Riprap heavy (606.0300) | CY | 64 | $95.00 | $100.00 | $110.70 | $110.70 |
| 60 | Relaid storm sewer 36-inch (608.0136) | LF | 16 | $284.20 | $77.00 | $413.00 | $413.00 |
| 61 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 50 | $81.75 | $88.00 | $76.00 | $76.00 |
| 62 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 94 | $131.55 | $120.00 | $155.00 | $155.00 |
| 63 | Storm sewer pipe reinforced concrete class III 42-inch (608.0342) | LF | 1,646 | $280.55 | $280.00 | $277.00 | $277.00 |
| 64 | Storm sewer pipe reinforced concrete class III 48-inch (608.0348) | LF | 480 | $329.65 | $358.00 | $356.00 | $356.00 |
| 65 | Storm sewer pipe reinforced concrete class III 54-inch (608.0354) | LF | 464 | $372.75 | $470.00 | $425.00 | $425.00 |
| 66 | Storm sewer pipe reinforced concrete class III 60-inch (608.0360) | LF | 1,463 | $461.50 | $375.00 | $453.00 | $453.00 |
| 67 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 1,925 | $79.00 | $74.00 | $75.00 | $75.00 |
| 68 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 742 | $82.70 | $86.00 | $86.00 | $86.00 |
| 69 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 721 | $94.15 | $90.00 | $91.00 | $91.00 |
| 70 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 74 | $128.55 | $110.00 | $151.00 | $151.00 |
| 71 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 525 | $170.15 | $181.00 | $200.00 | $200.00 |
| 72 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (608.2324) | LF | 57 | $236.40 | $276.00 | $286.00 | $286.00 |
| 73 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 29X45-inch (608.2329) | LF | 30 | $318.90 | $237.00 | $429.00 | $429.00 |
| 74 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 53X83-inch (608.2353) | LF | 55 | $951.80 | $650.00 | $734.00 | $734.00 |
| 75 | Storm sewer pipe class III-B 18- inch (608.3618) | LF | 268 | $93.45 | $91.00 | $89.00 | $89.00 |
| 76 | Storm sewer pipe class III-B 24- inch (608.3624) | LF | 1,521 | $115.95 | $136.00 | $118.00 | $118.00 |
| 77 | Storm sewer pipe class III-B 30- inch (608.3630) | LF | 777 | $141.80 | $161.00 | $151.00 | $151.00 |
| 78 | Storm sewer pipe class III-B 36- inch (608.3636) | LF | 844 | $164.90 | $197.00 | $175.00 | $175.00 |
| 79 | Storm sewer pipe composite 10- inch (608.6010) | LF | 33 | $163.60 | $63.00 | $123.00 | $123.00 |
| 80 | Storm sewer pipe composite 12- inch (608.6012) | LF | 48 | $184.55 | $64.00 | $272.00 | $272.00 |
| 81 | Storm sewer pipe composite 15- inch (608.6015) | LF | 7 | $111.85 | $83.00 | $265.00 | $265.00 |
| 82 | Manhole covers type J-special (611.0535) | EACH | 53 | $416.00 | $567.00 | $545.00 | $545.00 |
| 83 | Inlet covers type B (611.0606) | EACH | 1 | $638.00 | $846.00 | $810.00 | $810.00 |
| 84 | Inlet covers type B-A (611.0609) | EACH | 1 | $638.00 | $1,252.00 | $1,200.00 | $1,200.00 |
| 85 | Inlet covers type C (611.0612) | EACH | 6 | $516.00 | $572.00 | $550.00 | $550.00 |
| 86 | Inlet covers type H (611.0624) | EACH | 69 | $739.00 | $805.00 | $770.00 | $770.00 |
| 87 | Inlet covers type H-S (611.0639) | EACH | 21 | $739.00 | $805.00 | $770.00 | $770.00 |
| 88 | Inlet covers type MS (611.0642) | EACH | 12 | $549.00 | $559.00 | $535.00 | $535.00 |
| 89 | Inlet covers type MS-A (611.0645) | EACH | 8 | $735.00 | $580.00 | $555.00 | $555.00 |
| 90 | Inlet covers type S (611.0651) | EACH | 1 | $870.00 | $796.00 | $760.00 | $760.00 |
| 91 | Manholes 3-FT diameter (611.2003) | EACH | 1 | $3,084.00 | $2,750.00 | $2,630.00 | $2,630.00 |
| 92 | Manholes 4-FT diameter (611.2004) | EACH | 7 | $4,181.00 | $3,630.00 | $4,040.00 | $4,040.00 |
| 93 | Manholes 5-FT diameter (611.2005) | EACH | 13 | $5,469.00 | $5,866.00 | $6,790.00 | $6,790.00 |
| 94 | Manholes 6-FT diameter (611.2006) | EACH | 18 | $8,022.00 | $7,945.00 | $9,450.00 | $9,450.00 |
| 95 | Manholes 7-FT diameter (611.2007) | EACH | 6 | $12,110 | $11,393 | $13,050 | $13,050 |
| 96 | Manholes 8-FT diameter (611.2008) | EACH | 6 | $15,264 | $16,555 | $18,175 | $18,175 |
| 97 | Manholes 10-FT diameter (611.2010) | EACH | 1 | $26,446 | $32,280 | $34,210 | $34,210 |
| 98 | Inlets 3-FT diameter (611.3003) | EACH | 6 | $1,187.00 | $2,700.00 | $2,650.00 | $2,650.00 |
| 99 | Inlets 4-FT diameter (611.3004) | EACH | 16 | $3,641.00 | $3,630.00 | $3,980.00 | $3,980.00 |
| 100 | Inlets 2X3-FT (611.3230) | EACH | 74 | $2,687.00 | $2,825.00 | $2,795.00 | $2,795.00 |
| 101 | Inlets median 1 grate (611.3901) | EACH | 17 | $2,975.00 | $3,200.00 | $3,730.00 | $3,730.00 |
| 102 | Inlets median 2 grate (611.3902) | EACH | 3 | $6,640.00 | $775.00 | $3,785.00 | $3,785.00 |
| 103 | Adjusting manhole covers (611.8110) | EACH | 1 | $520.00 | $550.00 | $500.00 | $500.00 |
| 104 | Adjusting inlet covers (611.8115) | EACH | 3 | $520.00 | $550.00 | $500.00 | $500.00 |
| 105 | Cover plates temporary (611.8120.S) | EACH | 46 | $110.00 | $350.00 | $200.00 | $200.00 |
| 106 | Pipe underdrain 6-inch (612.0106) | LF | 870 | $25.00 | $12.00 | $24.00 | $24.00 |
| 107 | Fence chain link salvaged 4-FT (616.0404) | LF | 8 | $75.00 | $75.00 | $80.70 | $75.00 |
| 108 | Fence chain link salvaged 6-FT (616.0406) | LF | 113 | $75.00 | $75.00 | $80.70 | $75.00 |
| 109 | Fence safety (616.0700.S) | LF | 430 | $10.00 | $10.00 | $10.80 | $10.00 |
| 110 | Maintenance and repair of haul roads (project) 01. 4646-02-71 (618.0100) | EACH | 1 | $0.01 | $0.01 | $2,500.00 | $1.00 |
| 111 | Mobilization (619.1000) | EACH | 1 | $102,000 | $934,887 | $425,000 | $768,000 |
| 112 | Water (624.0100) | MGAL | 2,300 | $0.01 | $30.00 | $32.60 | $0.01 |
| 113 | Topsoil (625.0100) | SY | 26,500 | $6.81 | $7.60 | $10.20 | $12.00 |
| 114 | Silt fence (628.1504) | LF | 700 | $3.00 | $3.00 | $3.20 | $3.00 |
| 115 | Silt fence maintenance (628.1520) | LF | 1,400 | $1.00 | $1.00 | $1.10 | $1.00 |
| 116 | Mobilizations erosion control (628.1905) | EACH | 20 | $1.00 | $1.00 | $1.00 | $1.00 |
| 117 | Mobilizations emergency erosion control (628.1910) | EACH | 9 | $0.01 | $0.01 | $0.01 | $0.01 |
| 118 | Erosion mat urban class I type B (628.2008) | SY | 24,600 | $2.25 | $2.25 | $2.40 | $2.25 |
| 119 | Erosion mat class II type C (628.2027) | SY | 1,900 | $3.50 | $3.50 | $3.80 | $3.50 |
| 120 | Inlet protection type A (628.7005) | EACH | 149 | $25.00 | $25.00 | $26.90 | $25.00 |
| 121 | Inlet protection type B (628.7010) | EACH | 34 | $100.00 | $100.00 | $107.60 | $100.00 |
| 122 | Inlet protection type C (628.7015) | EACH | 93 | $100.00 | $100.00 | $107.60 | $100.00 |
| 123 | Inlet protection type D (628.7020) | EACH | 23 | $125.00 | $125.00 | $134.50 | $125.00 |
| 124 | Temporary ditch checks (628.7504) | LF | 80 | $8.00 | $8.00 | $8.60 | $8.00 |
| 125 | Culvert pipe checks (628.7555) | EACH | 17 | $25.00 | $25.00 | $26.90 | $25.00 |
| 126 | Tracking pads (628.7560) | EACH | 14 | $0.01 | $1,500.00 | $1,250.00 | $1,255.00 |
| 127 | Fertilizer type B (629.0210) | CWT | 17 | $150.00 | $150.00 | $161.40 | $150.00 |
| 128 | Seeding mixture no. 40 (630.0140) | LB | 1,210 | $10.00 | $10.00 | $10.80 | $10.00 |
| 129 | Seed water (630.0500) | MGAL | 600 | $0.01 | $0.01 | $0.01 | $0.01 |
| 130 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 1 | $140.00 | $140.00 | $150.70 | $140.00 |
| 131 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 50 | $140.00 | $140.00 | $150.70 | $140.00 |
| 132 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 14 | $150.00 | $150.00 | $161.40 | $150.00 |
| 133 | Signs type II reflective H (637.2210) | SF | 362.50 | $29.00 | $29.00 | $31.20 | $29.00 |
| 134 | Signs type II reflective F (637.2230) | SF | 61.75 | $29.00 | $29.00 | $31.20 | $29.00 |
| 135 | Moving signs type II (638.2102) | EACH | 9 | $190.00 | $190.00 | $204.50 | $190.00 |
| 136 | Removing signs type II (638.2602) | EACH | 25 | $50.00 | $50.00 | $53.80 | $50.00 |
| 137 | Removing small sign supports (638.3000) | EACH | 23 | $50.00 | $50.00 | $53.80 | $50.00 |
| 138 | Moving small sign supports (638.4000) | EACH | 6 | $50.00 | $50.00 | $53.80 | $50.00 |
| 139 | Pond liner clay (640.1303.S) | CY | 18 | $55.15 | $30.00 | $250.00 | $250.00 |
| 140 | Field office type C (642.5201) | EACH | 1 | $12,000 | $32,500 | $20,500 | $30,000 |
| 141 | Traffic control drums (643.0300) | DAY | 36,263 | $0.25 | $0.25 | $0.30 | $0.20 |
| 142 | Traffic control barricades type III (643.0420) | DAY | 4,886 | $0.75 | $0.75 | $0.50 | $0.35 |
| 143 | Traffic control warning lights type A (643.0705) | DAY | 7,419 | $0.20 | $0.20 | $0.30 | $0.10 |
| 144 | Traffic control signs (643.0900) | DAY | 15,800 | $0.35 | $0.35 | $0.50 | $0.40 |
| 145 | Traffic control covering signs type II (643.0920) | EACH | 3 | $50.00 | $50.00 | $376.70 | $100.00 |
| 146 | Traffic control signs PCMS (643.1050) | DAY | 70 | $50.00 | $50.00 | $53.80 | $55.00 |
| 147 | Temporary marking line epoxy 6- inch (643.3170) | LF | 600 | $3.25 | $3.25 | $3.50 | $3.25 |
| 148 | Temporary marking line removable tape 6-inch (643.3180) | LF | 14,340 | $1.50 | $1.50 | $1.10 | $1.90 |
| 149 | Traffic control (643.5000) | EACH | 1 | $25,000 | $25,000 | $62,692 | $16,000 |
| 150 | Geotextile type DF schedule A (645.0111) | SY | 395 | $4.60 | $5.00 | $3.00 | $3.00 |
| 151 | Geotextile type HR (645.0120) | SY | 250 | $7.00 | $6.00 | $5.00 | $5.00 |
| 152 | Marking line epoxy 6-inch (646.2020) | LF | 25,860 | $0.94 | $0.94 | $1.00 | $0.94 |
| 153 | Marking line epoxy 10-inch (646.4020) | LF | 560 | $1.06 | $1.06 | $1.10 | $1.06 |
| 154 | Marking arrow epoxy (646.5020) | EACH | 86 | $275.00 | $275.00 | $296.00 | $275.00 |
| 155 | Marking word epoxy (646.5120) | EACH | 1 | $325.00 | $325.00 | $349.80 | $325.00 |
| 156 | Marking symbol epoxy (646.5220) | EACH | 52 | $240.00 | $240.00 | $258.30 | $240.00 |
| 157 | Marking stop line epoxy 18-inch (646.6120) | LF | 240 | $14.10 | $14.10 | $15.20 | $14.10 |
| 158 | Marking diagonal epoxy 12-inch (646.7120) | LF | 120 | $11.25 | $11.25 | $12.10 | $11.25 |
| 159 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 2,660 | $8.50 | $8.50 | $9.10 | $8.50 |
| 160 | Construction staking storm sewer (650.4000) | EACH | 183 | $43.83 | $89.00 | $47.20 | $89.00 |
| 161 | Construction staking subgrade (650.4500) | LF | 7,323 | $0.01 | $0.01 | $0.01 | $0.01 |
| 162 | Construction staking base (650.5000) | LF | 779 | $1.28 | $0.55 | $1.40 | $0.55 |
| 163 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 459 | $0.69 | $0.75 | $0.70 | $0.75 |
| 164 | Construction staking concrete pavement (650.7000) | LF | 7,323 | $1.29 | $0.40 | $1.40 | $1.50 |
| 165 | Construction staking curb ramps (650.9000) | EACH | 52 | $93.05 | $150.00 | $100.10 | $150.00 |
| 166 | Construction staking sidewalk (project) 01. 4646-02-71 (650.9500) | EACH | 1 | $7,538.94 | $100.00 | $8,113.80 | $100.00 |
| 167 | Construction staking supplemental control (project) 01. 4646-02-71 (650.9911) | EACH | 1 | $446.98 | $10.00 | $481.10 | $10.00 |
| 168 | Construction staking slope stakes (650.9920) | LF | 7,323 | $0.90 | $0.95 | $1.00 | $0.95 |
| 169 | Conduit loop detector (652.0800) | LF | 244 | $6.00 | $6.00 | $6.50 | $6.00 |
| 170 | Loop detector wire (655.0800) | LF | 488 | $0.90 | $0.90 | $1.00 | $0.90 |
| 171 | Public land reference monument verify and reset (680.0100) | EACH | 2 | $619.04 | $1,000.00 | $666.20 | $1,000.00 |
| 172 | Sawing asphalt (690.0150) | LF | 10,400 | $2.50 | $1.39 | $1.50 | $1.39 |
| 173 | Sawing concrete (690.0250) | LF | 1,520 | $5.00 | $2.25 | $2.40 | $2.25 |
| 174 | Incentive compressive strength concrete pavement (715.0720) | DOL | 10,677 | $1.00 | $1.00 | $1.00 | $1.00 |
| 175 | Incentive iri ride (740.0440) | DOL | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 176 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 177 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,040 | $5.00 | $5.00 | $5.00 | $5.00 |
| 178 | Special 01. inlets 5-FT diameter (SPV.0060) | EACH | 3 | $2,131.00 | $7,250.00 | $7,950.00 | $7,950.00 |
| 179 | Special 02. inlets 7-FT diameter (SPV.0060) | EACH | 1 | $12,346 | $11,825 | $12,340 | $12,340 |
| 180 | Special 03. inlets 8-FT diameter (SPV.0060) | EACH | 2 | $15,871 | $15,579 | $17,195 | $17,195 |
| 181 | Special 04. manholes 8X8-FT (SPV.0060) | EACH | 1 | $36,713 | $21,600 | $22,820 | $22,820 |
| 182 | Special 05. manholes 10X7-FT (SPV.0060) | EACH | 1 | $36,943 | $22,300 | $23,655 | $23,655 |
| 183 | Special 06. inlet covers type BH (SPV.0060) | EACH | 1 | $862.00 | $1,281.00 | $1,225.00 | $1,225.00 |
| 184 | Special 07. inlet covers type H-D (SPV.0060) | EACH | 1 | $761.00 | $817.00 | $780.00 | $780.00 |
| 185 | Special 08. tracer wire access box (SPV.0060) | EACH | 38 | $185.00 | $214.00 | $195.00 | $195.00 |
| 186 | Special 09. storm sewer line opening (SPV.0060) | EACH | 1 | $1,200.00 | $750.00 | $605.00 | $605.00 |
| 187 | Special 10. adjusting sanitary manhole covers (SPV.0060) | EACH | 22 | $800.00 | $670.00 | $500.00 | $500.00 |
| 188 | Special 11. adjusting water valve boxes (SPV.0060) | EACH | 37 | $395.00 | $400.00 | $200.00 | $200.00 |
| 189 | Special 12. temporary storm sewer connection (SPV.0060) | EACH | 2 | $1,935.00 | $975.00 | $2,500.00 | $2,500.00 |
| 190 | Special 13. protection slab (SPV.0060) | EACH | 1 | $1,500.00 | $2,500.00 | $5,000.00 | $10,000 |
| 191 | Special 14. storm sewer plug (SPV.0060) | EACH | 2 | $1,070.00 | $850.00 | $840.00 | $840.00 |
| 192 | Special 01. storm sewer laterals 6- inch (SPV.0090) | LF | 57 | $76.60 | $50.00 | $101.00 | $101.00 |
| 193 | Special 02. storm sewer laterals 8- inch (SPV.0090) | LF | 841 | $80.90 | $65.00 | $54.00 | $54.00 |
| 194 | Special 03. concrete curb & gutter integral hes 30-inch type D (SPV.0090) | LF | 1,360 | $26.00 | $30.00 | $28.00 | $60.00 |
| 195 | Special 04. concrete curb & gutter integral shes 30-inch type D (SPV.0090) | LF | 630 | $30.00 | $35.00 | $32.30 | $80.00 |
| 196 | Special 01. remove, salvage, reinstall landscaping rocks (SPV.0165) | SF | 325 | $30.00 | $30.00 | $32.30 | $30.00 |
| 197 | Special 01. concrete pavement shes 9-inch (SPV.0180) | SY | 1,810 | $66.37 | $102.89 | $71.40 | $88.00 |
| 198 | Special 01. excavation and disposal of polychlorinated biphenyl (PCB) contaminated soil (SPV.0195) | TON | 524 | $80.00 | $65.00 | $72.00 | $72.00 |
| 199 | Special 02. excavation and disposal of volatile organic compound (voc) contaminated soil (SPV.0195) | TON | 37 | $85.00 | $65.00 | $156.00 | $156.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.