RankBidderTotal bidAgainst the low bid
1Relyco Plus, LLC$3,742,494Low
2Highway Landscapers, Inc.$3,990,173+7.0%
3James Peterson Sons, Inc.$4,213,784+13%
4Musson Bros., Inc.$4,529,198+21%
WisDOT contract 20251111021: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Relyco Plus, LLC2. Highway Landscapers, Inc.3. James Peterson Sons, Inc.4. Musson Bros., Inc.
1Clearing (201.0105)STA19$800.00$850.00$1,204.47$2,335.78
2Grubbing (201.0205)STA19$400.00$450.00$445.86$996.84
3Removing small pipe culverts (203.0100)EACH32$593.13$500.00$810.00$1,332.74
4Removing structure (structure) 01. C-38-117 (203.0220)EACH1$6,850.00$10,000$4,620.00$26,336
5Removing structure (structure) 02. C-38-639 (203.0220)EACH1$10,895$12,500$9,320.00$16,133
6Removing structure (structure) 03. C-38-111 (203.0220)EACH1$4,735.00$8,500.00$1,664.00$6,703.09
7Removing structure (structure) 04. C-38-121 (203.0220)EACH1$5,540.00$8,500.00$1,664.00$9,384.33
8Removing structure (structure) 05. station 804+94, CPRC 66-inch (203.0220)EACH1$3,180.00$6,500.00$5,976.00$7,075.81
9Removing structure (structure) 06. C-38-113 (203.0220)EACH1$2,065.00$6,500.00$1,663.00$9,384.33
10Removing structure (structure) 07. C-38-115 (203.0220)EACH1$2,770.00$8,500.00$1,663.00$6,703.09
11Removing structure (structure) 08. C-38-116 (203.0220)EACH1$4,425.00$8,500.00$1,663.00$10,725
12Removing structure (structure) 09. C-38-124 (203.0220)EACH1$4,735.00$8,500.00$1,663.00$9,384.33
13Removing guardrail (204.0165)LF448$3.00$5.00$4.00$3.00
14Removing delineators and markers (204.0180)EACH46$30.00$50.00$15.00$30.00
15Excavation common (205.0100)CY10,814$19.45$22.50$16.00$23.08
16Excavation for structures culverts (structure) 01. C-38-128 (206.2001)EACH1$69,000$56,600$193,548$75,530
17Cofferdams (structure) 01. station 551+02, CPRC 78-inch (206.5001)EACH1$10,975$15,000$1,503.00$3,930.51
18Cofferdams (structure) 02. station 668+12, CPRC 108-inch (206.5001)EACH1$14,741$15,000$2,902.74$3,930.51
19Cofferdams (structure) 03. station 903+83, CPRC 66-inch (206.5001)EACH1$12,130$15,000$1,503.00$3,930.51
20Cofferdams (structure) 04. station 1010+52, cprche 58X91-inch (206.5001)EACH1$12,708$15,000$1,503.00$1,965.26
21Cofferdams (structure) 05. station 1176+47, cprche 63X98-inch (206.5001)EACH1$12,708$15,000$1,503.00$3,930.51
22Cofferdams (structure) 06. station 1524+58, CPRC 96-inch (206.5001)EACH1$29,266$40,000$27,266$19,653
23Borrow (208.0100)CY504$0.01$1.00$18.80$1.00
24Backfill structure type B (210.2500)TON1,260$21.39$28.00$21.00$29.62
25Finishing roadway (project) 01. 9670-16-71 (213.0100)EACH1$5,000.00$1,500.00$5,000.00$100.00
26Base aggregate dense 3/4-inch (305.0110)TON1,100$33.70$34.00$36.44$46.71
27Base aggregate dense 1 1/4-inch (305.0120)TON5,210$12.74$22.80$18.43$42.04
28Base aggregate dense 3-inch (305.0130)TON989$25.57$28.00$23.91$21.01
29HMA cold weather paving (450.4000)TON3,441$3.25$3.25$3.25$3.25
30Tack coat (455.0605)GAL1,264$4.20$4.20$4.20$4.20
31Incentive density HMA pavement (460.2000)DOL3,160$1.00$1.00$1.00$1.00
32HMA pavement 4 LT 58-28 S (460.5224)TON4,935$168.40$168.40$214.75$168.40
33Asphaltic rumble strips, shoulder (465.0520)LF1,654$8.60$8.60$8.60$8.60
34Asphaltic rumble strips, centerline (465.0560)LF883$9.30$9.30$9.30$9.30
35Concrete masonry culverts (504.0100)CY171$772.00$1,080.00$812.74$758.00
36Concrete masonry endwalls (504.0900)CY60$1,685.00$2,887.00$1,648.75$1,450.00
37Bar steel reinforcement HS structures (505.0400)LB25,440$1.12$4.00$1.12$1.12
38Bar steel reinforcement HS coated structures (505.0600)LB2,200$1.23$4.00$1.23$1.23
39Rubberized membrane waterproofing (516.0500)SY29$48.00$50.00$48.00$48.00
40Apron endwalls for culvert pipe 24- inch (520.1024)EACH26$606.94$530.00$443.37$754.95
41Apron endwalls for culvert pipe 30- inch (520.1030)EACH8$949.86$750.00$768.01$1,227.26
42Apron endwalls for culvert pipe 36- inch (520.1036)EACH5$1,192.99$1,100.00$1,064.21$1,564.17
43Culvert pipe class III-A non-metal 24-inch (520.3424)LF838$142.02$113.00$141.12$168.13
44Culvert pipe class III-A non-metal 30-inch (520.3430)LF270$168.75$142.00$162.49$187.78
45Culvert pipe class III-A non-metal 36-inch (520.3436)LF286$183.28$185.00$188.72$203.94
46Apron endwalls for culvert pipe sloped cross drains steel 36-inch 4 to 1 (521.0336)EACH5$3,796.55$4,615.00$3,626.29$4,893.95
47Culvert pipe reinforced concrete class III 48-inch (522.0148)LF128$380.15$311.31$340.71$382.49
48Culvert pipe reinforced concrete class III 66-inch (522.0166)LF96$438.26$428.24$661.78$680.27
49Culvert pipe reinforced concrete class III 72-inch (522.0172)LF120$536.71$583.95$794.57$948.40
50Culvert pipe reinforced concrete class III 78-inch (522.0178)LF120$777.90$698.94$989.89$1,179.15
51Culvert pipe reinforced concrete class III 96-inch (522.0196)LF96$884.97$817.10$1,248.40$1,400.45
52Culvert pipe reinforced concrete class III 108-inch (522.0208)LF108$1,426.18$1,337.76$1,793.18$2,150.79
53Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF264$155.73$142.10$188.58$210.98
54Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF288$182.66$178.67$221.28$233.75
55Culvert pipe reinforced concrete class IV 36-inch (522.0436)LF104$241.15$217.36$259.88$308.07
56Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH10$1,765.46$1,473.75$1,646.21$2,168.72
57Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH10$2,165.75$1,700.00$1,884.00$2,504.37
58Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048)EACH4$3,526.15$3,189.00$3,364.90$4,593.44
59Apron endwalls for culvert pipe reinforced concrete 66-inch (522.1066)EACH2$5,042.65$4,991.50$5,632.40$6,464.20
60Apron endwalls for culvert pipe reinforced concrete 72-inch (522.1072)EACH2$7,584.65$5,311.50$6,573.15$7,088.10
61Culvert pipe reinforced concrete horizontal elliptical class HE-III 58X91-inch (522.2358)LF64$815.97$730.59$914.15$1,065.35
62Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 58X91-inch (522.2658)EACH4$6,993.03$7,250.00$8,681.31$9,386.53
63Riprap medium (606.0200)CY150$70.00$125.00$77.66$193.44
64Riprap heavy (606.0300)CY61$70.00$125.00$77.66$115.52
65MGS guardrail 3 (614.2300)LF325$27.00$32.00$32.00$27.00
66MGS guardrail terminal eat (614.2610)EACH4$3,433.00$5,100.00$5,100.00$3,433.00
67Maintenance and repair of haul roads (project) 01. 9670-16-71 (618.0100)EACH1$0.01$500.00$1.00$1.00
68Mobilization (619.1000)EACH1$417,000$209,680$239,663$446,044
69Water (624.0100)MGAL88$0.01$50.00$50.00$32.60
70Salvaged topsoil (625.0500)SY12,800$2.74$5.00$5.31$1.36
71Mulching (627.0200)SY2,550$0.50$1.30$1.30$0.50
72Silt fence (628.1504)LF9,930$1.70$2.00$2.00$1.70
73Silt fence maintenance (628.1520)LF9,930$0.03$0.01$0.01$0.03
74Mobilizations erosion control (628.1905)EACH32$303.00$1.00$1.00$303.00
75Mobilizations emergency erosion control (628.1910)EACH9$413.00$1.00$1.00$413.00
76Erosion mat urban class I type A (628.2006)SY12,800$1.77$3.50$3.50$1.77
77Turbidity barriers (628.6005)SY50$52.00$80.00$80.00$52.00
78Temporary ditch checks (628.7504)LF350$8.00$9.00$9.00$8.00
79Culvert pipe checks (628.7555)EACH210$20.00$11.00$11.00$20.00
80Rock bags (628.7570)EACH320$6.00$11.00$11.00$6.00
81Fertilizer type B (629.0210)CWT5$100.00$150.00$150.00$100.00
82Seeding mixture no. 30 (630.0130)LB760$7.13$8.00$8.00$7.13
83Seeding temporary (630.0200)LB70$5.33$5.00$5.00$5.33
84Seed water (630.0500)MGAL380$1.03$1.00$1.00$1.03
85Markers culvert end (633.5200)EACH80$65.00$70.00$70.00$65.00
86Posts wood 4X6-inch X 16-FT (634.0616)EACH7$95.00$175.00$175.00$95.00
87Posts wood 4X6-inch X 18-FT (634.0618)EACH2$98.00$200.00$200.00$98.00
88Moving signs type II (638.2102)EACH8$150.00$100.00$100.00$150.00
89Removing small sign supports (638.3000)EACH9$25.00$50.00$50.00$25.00
90Field office type B (642.5001)EACH1$9,000.00$15,000$9,000.00$15,000
91Traffic control drums (643.0300)DAY210$1.54$1.54$1.54$1.54
92Traffic control barricades type III (643.0420)DAY14,330$0.47$0.47$0.47$0.47
93Traffic control warning lights type A (643.0705)DAY27,436$0.15$0.15$0.15$0.15
94Traffic control signs (643.0900)DAY28,375$0.44$0.44$0.44$0.44
95Traffic control covering signs type II (643.0920)EACH18$87.36$87.36$87.36$87.36
96Traffic control signs fixed message (643.1000)SF96$22.62$22.62$22.62$22.62
97Traffic control signs PCMS (643.1050)DAY28$68.79$68.79$68.79$68.79
98Traffic control (643.5000)EACH1$36,801$36,801$36,801$36,801
99Geotextile type C (645.0105)SY444$3.50$6.00$12.29$5.55
100Geotextile type HR (645.0120)SY604$3.50$6.00$8.31$10.18
101Marking line epoxy 6-inch (646.2020)LF10,140$2.20$2.20$2.20$2.20
102Cold weather marking epoxy 6-inch (646.6466)LF6,837$0.50$0.50$0.50$0.50
103Construction staking subgrade (650.4500)LF3,579$0.01$0.01$0.76$0.01
104Construction staking base (650.5000)LF3,579$0.01$0.01$0.96$0.01
105Construction staking pipe culverts (650.6000)EACH41$135.93$200.00$227.25$200.00
106Construction staking structure layout (structure) 01. C-38-128 (650.6501)EACH1$3,460.14$1,677.00$1,212.00$1,677.00
107Construction staking supplemental control (project) 01. 9670-16-71 (650.9911)EACH1$460.39$10.00$1,212.00$10.00
108Construction staking slope stakes (650.9920)LF4,074$0.01$0.01$1.52$0.01
109Sawing asphalt (690.0150)LF3,161$2.00$4.00$3.00$2.25
110Incentive strength concrete structures (715.0502)DOL1,026$1.00$1.00$1.00$1.00
111On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00
112On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,100$5.00$5.00$5.00$5.00
113Special 01. foundation backfill (SPV.0035)CY7,120$22.29$39.00$33.47$34.50
114Special 01. apron endwalls for culvert pipe reinforced concrete 78-inch (SPV.0060)EACH2$9,693.75$8,750.00$9,689.25$9,743.46
115Special 01. culvert pipe reinforced concrete horizontal elliptical class HE-IV 58X91-in (SPV.0090)LF64$926.76$872.88$1,045.16$1,210.40
WisDOT contract 20251111021: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy