Superior - Wentworth; STH 13 Bridge B-16-0024 (USH 002, Douglas County Superior - Wentworth). Let by Wisconsin DOT on November 11, 2025, Douglas. 3 bids received; low bid $1,433,705 by Pciroads, LLC.
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 77
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pciroads, LLC | $1,433,705 | Low |
| 2 | Zenith Tech., Inc. - Waukesha | $1,569,111 | +9.0% |
| 3 | Lunda Construction Company | $1,592,189 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pciroads, LLC | 2. Zenith Tech., Inc. - Waukesha | 3. Lunda Construction Company |
|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 4 | $515.00 | $515.00 | $515.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 230 | $34.30 | $34.30 | $34.30 |
| 3 | Removing guardrail (204.0165) | LF | 1,075 | $3.35 | $3.35 | $3.35 |
| 4 | Excavation common (205.0100) | CY | 94 | $32.85 | $32.85 | $32.85 |
| 5 | Borrow (208.0100) | CY | 645 | $27.50 | $27.50 | $27.50 |
| 6 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 18 | $381.00 | $381.00 | $381.00 |
| 7 | Finishing roadway (project) 01 1195-03-70 (213.0100) | EACH | 1 | $1,050.00 | $1,050.00 | $1,050.00 |
| 8 | Base aggregate dense 3/4-inch (305.0110) | TON | 260 | $34.45 | $34.45 | $34.45 |
| 9 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 310 | $28.10 | $28.10 | $28.10 |
| 10 | Concrete pavement 6-inch (415.0060) | SY | 89 | $141.14 | $141.14 | $141.14 |
| 11 | Concrete pavement approach slab (415.0410) | SY | 124 | $311.55 | $311.55 | $311.55 |
| 12 | Tack coat (455.0605) | GAL | 100 | $13.37 | $13.37 | $13.37 |
| 13 | Asphaltic surface (465.0105) | TON | 240 | $197.67 | $197.67 | $197.67 |
| 14 | Asphaltic surface temporary (465.0125) | TON | 55 | $194.03 | $194.03 | $194.03 |
| 15 | Expansion device (502.3101) | LF | 106 | $220.80 | $350.00 | $375.00 |
| 16 | Pigmented surface sealer reseal (502.3205) | SY | 385 | $14.25 | $30.00 | $35.00 |
| 17 | Pigmented surface sealer (502.3210) | SY | 10 | $14.25 | $30.00 | $35.00 |
| 18 | Adhesive anchors 3/4-inch (502.4106) | EACH | 10 | $36.20 | $150.00 | $50.00 |
| 19 | Adhesive anchors 1 1/2-inch (502.4112) | EACH | 38 | $42.50 | $225.00 | $250.00 |
| 20 | Adhesive anchors no. 5 bar (502.4205) | EACH | 116 | $28.60 | $30.00 | $30.00 |
| 21 | Bar steel reinforcement HS coated structures (505.0600) | LB | 4,850 | $3.10 | $3.00 | $3.50 |
| 22 | Bar couplers no. 7 (505.0907) | EACH | 18 | $67.70 | $100.00 | $75.00 |
| 23 | Structural steel HS (506.0605) | LB | 615 | $12.00 | $150.00 | $55.00 |
| 24 | Bearing assemblies expansion (structure) 01. B-16-24 (506.6000) | EACH | 10 | $14,886 | $10,000 | $15,000 |
| 25 | Removing bearings (structure) 01. B-16-24 (506.7050.S) | EACH | 10 | $4,608.14 | $6,850.00 | $1,500.00 |
| 26 | Joint repair (509.1000) | SY | 46 | $955.75 | $1,500.00 | $1,800.00 |
| 27 | Concrete surface repair (509.1500) | SF | 150 | $162.50 | $205.00 | $200.00 |
| 28 | Concrete masonry deck repair (509.2100.S) | CY | 19 | $2,827.15 | $1,100.00 | $1,000.00 |
| 29 | Structure repainting recycled abrasive (structure) 01. B-16-24 (517.1801.S) | EACH | 1 | $269,100 | $242,650 | $242,650 |
| 30 | Negative pressure containment and collection of waste materials (structure) 01. B-16-24 (517.4501.S) | EACH | 1 | $161,460 | $189,950 | $189,950 |
| 31 | Portable decontamination facility (517.6001.S) | EACH | 1 | $1,000.00 | $2,000.00 | $2,000.00 |
| 32 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 195 | $72.25 | $72.25 | $72.25 |
| 33 | Concrete surface drains (602.3010) | CY | 25 | $1,356.00 | $1,356.00 | $1,356.00 |
| 34 | Concrete barrier temporary precast delivered (603.8000) | LF | 1,606 | $16.46 | $16.46 | $16.46 |
| 35 | Concrete barrier temporary precast installed (603.8125) | LF | 3,212 | $5.27 | $5.27 | $5.27 |
| 36 | Riprap medium (606.0200) | CY | 12 | $96.75 | $96.75 | $96.75 |
| 37 | Crash cushions temporary (614.0905) | EACH | 8 | $2,047.77 | $3,000.00 | $4,750.00 |
| 38 | MGS guardrail 3 (614.2300) | LF | 365 | $23.50 | $23.50 | $23.50 |
| 39 | MGS guardrail short radius (614.2350) | LF | 443 | $26.70 | $26.70 | $26.70 |
| 40 | MGS thrie beam transition (614.2500) | LF | 157.60 | $91.50 | $91.50 | $91.50 |
| 41 | MGS guardrail terminal eat (614.2610) | EACH | 2 | $3,453.00 | $3,453.00 | $3,453.00 |
| 42 | MGS guardrail terminal type 2 (614.2620) | EACH | 2 | $3,059.00 | $3,059.00 | $3,059.00 |
| 43 | Maintenance and repair of haul roads (project) 01. 1195-03-70 (618.0100) | EACH | 1 | $100.00 | $150.00 | $1.00 |
| 44 | Mobilization (619.1000) | EACH | 1 | $175,520 | $200,000 | $257,678 |
| 45 | Water (624.0100) | MGAL | 13 | $0.50 | $0.50 | $0.50 |
| 46 | Salvaged topsoil (625.0500) | SY | 2,820 | $1.77 | $1.77 | $1.77 |
| 47 | Silt fence (628.1504) | LF | 1,280 | $2.30 | $2.30 | $2.30 |
| 48 | Silt fence maintenance (628.1520) | LF | 1,280 | $0.01 | $0.01 | $0.01 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 2 | $1,177.00 | $1,177.00 | $1,177.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $50.00 | $50.00 | $50.00 |
| 51 | Erosion mat urban class I type B (628.2008) | SY | 2,820 | $1.90 | $1.90 | $1.90 |
| 52 | Fertilizer type B (629.0210) | CWT | 1.79 | $182.50 | $182.50 | $182.50 |
| 53 | Seeding mixture no. 10 (630.0110) | LB | 80 | $20.00 | $20.00 | $20.00 |
| 54 | Moving signs type II (638.2102) | EACH | 11 | $78.25 | $78.25 | $78.25 |
| 55 | Moving small sign supports (638.4000) | EACH | 17 | $78.25 | $78.25 | $78.25 |
| 56 | Field office type B (642.5001) | EACH | 1 | $15,000 | $10,000 | $3,000.00 |
| 57 | Traffic control drums (643.0300) | DAY | 4,430 | $0.26 | $0.26 | $1.50 |
| 58 | Traffic control barricades type III (643.0420) | DAY | 420 | $0.67 | $0.67 | $2.00 |
| 59 | Traffic control warning lights type A (643.0705) | DAY | 840 | $0.18 | $0.18 | $0.25 |
| 60 | Traffic control warning lights type C (643.0715) | DAY | 2,110 | $0.16 | $0.16 | $0.25 |
| 61 | Traffic control connected arrow boards (643.0810) | DAY | 20 | $15.00 | $15.00 | $50.00 |
| 62 | Traffic control signs (643.0900) | DAY | 2,278 | $0.43 | $0.43 | $3.25 |
| 63 | Traffic control covering signs type II (643.0920) | EACH | 10 | $77.35 | $77.35 | $0.40 |
| 64 | Temporary marking line paint 6- inch (643.3165) | LF | 2,360 | $1.21 | $1.21 | $1.00 |
| 65 | Temporary marking line removable tape 6-inch (643.3180) | LF | 5,040 | $2.30 | $2.30 | $1.68 |
| 66 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 96 | $5.27 | $5.27 | $5.25 |
| 67 | Traffic control (643.5000) | EACH | 1 | $12,943 | $12,943 | $10,900 |
| 68 | Geotextile type HR (645.0120) | SY | 48 | $6.40 | $6.40 | $6.40 |
| 69 | Marking line epoxy 6-inch (646.2020) | LF | 6,045 | $2.50 | $2.50 | $2.50 |
| 70 | Marking removal line 4-inch (646.9000) | LF | 3,765 | $0.70 | $0.70 | $0.85 |
| 71 | Temporary traffic signals for bridges (structure) 01. B-16-24 (661.0101) | EACH | 1 | $30,980 | $30,980 | $23,400 |
| 72 | Sawing asphalt (690.0150) | LF | 1,177 | $1.77 | $1.77 | $1.77 |
| 73 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 74 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 75 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 76 | Special 01. steel fatigue crack repair (SPV.0060) | EACH | 8 | $210.00 | $2,500.00 | $2,500.00 |
| 77 | Special 01. abutment seat cleaning and sealing (SPV.0180) | SY | 28 | $42.00 | $100.00 | $200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.