WisDOT contract 20251111026 bid tabulation
Ellsworth - Durand; STH 25 N Intersection (USH 010, Pepin County Ellsworth - Durand). Let by Wisconsin DOT on November 11, 2025, Pepin. 5 bids received; low bid $2,619,137 by Mattison Contractors, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 130
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mattison Contractors, Inc. | $2,619,137 | Low |
| 2 | Chippewa Concrete Services, Inc. | $2,624,572 | 0.0% |
| 3 | Haas Sons, Inc. | $2,760,792 | +5.0% |
| 4 | McCabe Construction, Inc. | $2,854,854 | +9.0% |
| 5 | A-1 Excavating LLC | $3,099,709 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mattison Contractors, Inc. | 2. Chippewa Concrete Services, Inc. | 3. Haas Sons, Inc. | 4. McCabe Construction, Inc. | 5. A-1 Excavating LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 4 | $565.00 | $577.43 | $650.00 | $1,884.67 | $1,000.00 |
| 2 | Grubbing (201.0205) | STA | 4 | $285.00 | $291.27 | $650.00 | $471.43 | $2,000.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 2 | $230.00 | $235.06 | $813.00 | $450.00 | $500.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 625 | $24.92 | $25.47 | $24.92 | $26.16 | $27.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 162 | $4.60 | $4.70 | $5.68 | $6.25 | $10.00 |
| 6 | Removing concrete bases (204.0195) | EACH | 1 | $230.00 | $235.06 | $500.00 | $225.00 | $800.00 |
| 7 | Removing inlets (204.0220) | EACH | 1 | $365.00 | $373.03 | $542.00 | $500.00 | $500.00 |
| 8 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 33 | $13.85 | $14.15 | $37.27 | $14.30 | $25.00 |
| 9 | Excavation common (205.0100) | CY | 13,261 | $8.05 | $8.23 | $21.11 | $18.50 | $22.00 |
| 10 | Borrow (208.0100) | CY | 202 | $17.00 | $17.37 | $30.25 | $21.50 | $26.00 |
| 11 | Finishing roadway (project) 01. 1530-05-75 (213.0100) | EACH | 1 | $1,005.00 | $5,110.00 | $1.00 | $1,556.37 | $2,000.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,083 | $26.45 | $27.03 | $24.25 | $25.30 | $28.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 13,398 | $22.20 | $22.69 | $18.14 | $22.80 | $22.00 |
| 14 | Coloring concrete wisdot red (405.0100) | CY | 363 | $85.20 | $87.07 | $85.20 | $90.35 | $94.00 |
| 15 | Concrete pavement 9-inch (415.0090) | SY | 6,569 | $81.19 | $82.98 | $81.19 | $86.10 | $89.50 |
| 16 | Concrete truck apron 12-inch (415.2010) | SY | 1,085 | $86.91 | $88.82 | $86.91 | $92.16 | $95.50 |
| 17 | Concrete pavement joint filling (415.4100) | SY | 6,569 | $3.27 | $3.34 | $3.27 | $3.47 | $3.60 |
| 18 | Tack coat (455.0605) | GAL | 750 | $6.10 | $6.23 | $6.10 | $6.40 | $6.10 |
| 19 | Incentive density HMA pavement (460.2000) | DOL | 940 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 20 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,160 | $142.16 | $145.29 | $142.16 | $149.26 | $157.00 |
| 21 | HMA pavement 4 MT 58-34 H (460.6444) | TON | 306 | $148.54 | $151.81 | $148.54 | $155.96 | $163.00 |
| 22 | Asphaltic surface patching (465.0110) | TON | 120 | $160.03 | $163.55 | $160.03 | $168.02 | $180.00 |
| 23 | Asphaltic surface driveways and field entrances (465.0120) | TON | 39 | $181.41 | $185.40 | $181.41 | $190.47 | $201.00 |
| 24 | Asphaltic surface temporary (465.0125) | TON | 1,496 | $118.02 | $120.62 | $118.02 | $123.92 | $129.00 |
| 25 | Asphaltic flumes (465.0315) | SY | 138 | $65.55 | $66.99 | $65.55 | $68.82 | $76.00 |
| 26 | Asphaltic rumble strips, shoulder (465.0520) | LF | 2,930 | $1.00 | $1.53 | $1.50 | $1.59 | $2.00 |
| 27 | Asphaltic rumble strips, centerline (465.0560) | LF | 620 | $1.00 | $3.07 | $3.00 | $3.18 | $2.00 |
| 28 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 2 | $908.00 | $927.98 | $1,042.00 | $220.00 | $575.00 |
| 29 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 2 | $429.00 | $438.44 | $1,042.00 | $475.00 | $510.00 |
| 30 | Culvert pipe class III-A 18-inch (520.3318) | LF | 64 | $50.70 | $51.82 | $63.59 | $43.75 | $92.00 |
| 31 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 184 | $138.00 | $141.04 | $126.70 | $100.00 | $165.00 |
| 32 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 3 | $1,585.00 | $1,619.87 | $1,362.00 | $970.00 | $1,275.00 |
| 33 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 4 | $1,970.00 | $2,013.34 | $1,612.00 | $1,340.00 | $1,400.00 |
| 34 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 163 | $54.39 | $55.59 | $54.39 | $57.68 | $60.00 |
| 35 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 1,135 | $30.40 | $31.07 | $30.40 | $32.24 | $34.00 |
| 36 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 1,872 | $32.09 | $32.80 | $32.09 | $34.03 | $36.00 |
| 37 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 248 | $42.89 | $43.83 | $42.89 | $45.48 | $47.00 |
| 38 | Concrete sidewalk 4-inch (602.0405) | SF | 9,485 | $8.10 | $8.28 | $8.10 | $8.59 | $9.00 |
| 39 | Riprap medium (606.0200) | CY | 42 | $132.30 | $135.21 | $120.15 | $76.25 | $94.00 |
| 40 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 364 | $74.75 | $76.38 | $93.00 | $74.00 | $94.00 |
| 41 | Inlet covers type B (611.0606) | EACH | 1 | $1,454.00 | $1,485.99 | $1,030.00 | $1,000.00 | $1,350.00 |
| 42 | Inlet covers type H (611.0624) | EACH | 2 | $1,315.00 | $1,343.93 | $930.00 | $900.00 | $1,250.00 |
| 43 | Inlet covers type HM (611.0627) | EACH | 6 | $1,315.00 | $1,343.93 | $930.00 | $920.00 | $1,275.00 |
| 44 | Inlet covers type H-S (611.0639) | EACH | 2 | $1,315.00 | $1,343.93 | $930.00 | $900.00 | $1,250.00 |
| 45 | Inlet covers type T (611.0652) | EACH | 3 | $1,655.00 | $1,691.41 | $1,205.00 | $1,170.00 | $1,525.00 |
| 46 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $2,950.00 | $3,014.90 | $3,280.50 | $2,415.00 | $3,350.00 |
| 47 | Inlets 2X2-FT (611.3220) | EACH | 1 | $1,575.00 | $1,609.65 | $2,580.50 | $1,715.00 | $1,625.00 |
| 48 | Inlets 2X2.5-FT (611.3225) | EACH | 3 | $1,875.00 | $1,916.25 | $2,519.17 | $1,960.00 | $1,875.00 |
| 49 | Inlets 2X3-FT (611.3230) | EACH | 9 | $2,075.00 | $2,120.65 | $2,431.67 | $2,120.00 | $2,000.00 |
| 50 | Cover plates temporary (611.8120.S) | EACH | 6 | $115.00 | $117.53 | $386.33 | $300.00 | $250.00 |
| 51 | Maintenance and repair of haul roads (project) 01. 1530-05-75 (618.0100) | EACH | 1 | $100.00 | $1.02 | $1.00 | $100.00 | $1,500.00 |
| 52 | Mobilization (619.1000) | EACH | 1 | $234,875 | $208,539 | $193,025 | $177,000 | $265,725 |
| 53 | Concrete median sloped nose (620.0300) | SF | 505 | $13.90 | $14.21 | $13.90 | $14.74 | $15.00 |
| 54 | Water (624.0100) | MGAL | 240 | $1.00 | $1.02 | $1.00 | $44.00 | $40.00 |
| 55 | Topsoil (625.0100) | SY | 17,800 | $1.20 | $1.23 | $3.75 | $5.50 | $4.00 |
| 56 | Silt fence (628.1504) | LF | 6,700 | $1.75 | $1.79 | $1.75 | $1.84 | $2.00 |
| 57 | Silt fence maintenance (628.1520) | LF | 6,700 | $0.01 | $0.01 | $0.01 | $0.01 | $0.05 |
| 58 | Mobilizations erosion control (628.1905) | EACH | 5 | $165.00 | $168.63 | $165.00 | $173.24 | $180.00 |
| 59 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $102.20 | $100.00 | $105.00 | $110.00 |
| 60 | Erosion mat urban class I type B (628.2008) | SY | 17,800 | $1.50 | $1.53 | $1.50 | $1.57 | $1.70 |
| 61 | Inlet protection type A (628.7005) | EACH | 13 | $68.00 | $69.50 | $68.00 | $71.40 | $75.00 |
| 62 | Inlet protection type C (628.7015) | EACH | 12 | $41.00 | $41.90 | $41.00 | $43.05 | $45.00 |
| 63 | Temporary ditch checks (628.7504) | LF | 75 | $7.50 | $7.67 | $7.50 | $7.87 | $9.00 |
| 64 | Culvert pipe checks (628.7555) | EACH | 10 | $20.00 | $20.44 | $20.00 | $21.00 | $22.00 |
| 65 | Fertilizer type B (629.0210) | CWT | 12.50 | $89.00 | $90.96 | $89.00 | $93.45 | $98.00 |
| 66 | Seeding mixture no. 40 (630.0140) | LB | 325 | $16.00 | $16.35 | $16.00 | $16.80 | $18.00 |
| 67 | Seeding mixture no. 70 (630.0170) | LB | 5 | $240.00 | $245.28 | $240.00 | $251.99 | $265.00 |
| 68 | Seeding temporary (630.0200) | LB | 128 | $3.75 | $3.83 | $3.75 | $3.94 | $4.00 |
| 69 | Seeding nurse crop (630.0400) | LB | 2 | $10.00 | $10.22 | $10.00 | $10.50 | $11.00 |
| 70 | Seed water (630.0500) | MGAL | 310 | $0.01 | $0.01 | $0.01 | $0.01 | $0.10 |
| 71 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 7 | $76.00 | $77.67 | $76.00 | $79.80 | $84.00 |
| 72 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 30 | $82.00 | $83.80 | $82.00 | $86.10 | $90.00 |
| 73 | Signs type II non reflective (637.2110) | SF | 151.29 | $17.25 | $17.63 | $17.25 | $18.11 | $19.00 |
| 74 | Signs type II reflective F (637.2230) | SF | 57.93 | $21.25 | $21.72 | $21.25 | $22.31 | $24.00 |
| 75 | Removing signs type II (638.2602) | EACH | 27 | $19.50 | $19.93 | $19.50 | $20.47 | $22.00 |
| 76 | Removing small sign supports (638.3000) | EACH | 27 | $19.50 | $19.93 | $19.50 | $20.47 | $22.00 |
| 77 | Field office type C (642.5201) | EACH | 1 | $35,800 | $7,665.00 | $35,800 | $9,000.00 | $15,000 |
| 78 | Traffic control drums (643.0300) | DAY | 17,150 | $0.50 | $0.51 | $0.17 | $0.52 | $0.55 |
| 79 | Traffic control barricades type III (643.0420) | DAY | 2,030 | $0.55 | $0.56 | $0.55 | $0.58 | $0.60 |
| 80 | Traffic control warning lights type A (643.0705) | DAY | 4,050 | $0.10 | $0.10 | $0.09 | $0.10 | $0.15 |
| 81 | Traffic control warning lights type C (643.0715) | DAY | 4,680 | $0.10 | $0.10 | $0.08 | $0.10 | $0.15 |
| 82 | Traffic control signs (643.0900) | DAY | 22,100 | $0.40 | $0.41 | $0.19 | $0.42 | $0.45 |
| 83 | Traffic control covering signs type II (643.0920) | EACH | 10 | $40.00 | $40.88 | $75.32 | $42.00 | $44.00 |
| 84 | Traffic control signs PCMS (643.1050) | DAY | 42 | $75.00 | $76.65 | $61.47 | $78.75 | $83.00 |
| 85 | Temporary marking line paint 6- inch (643.3165) | LF | 30,952 | $0.60 | $0.61 | $0.45 | $0.63 | $0.65 |
| 86 | Temporary marking line removable tape 6-inch (643.3180) | LF | 1,528 | $1.69 | $1.73 | $2.55 | $1.77 | $1.90 |
| 87 | Temporary marking stop line paint 18-inch (643.3805) | LF | 49 | $2.50 | $2.56 | $7.00 | $2.62 | $2.75 |
| 88 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 34 | $5.25 | $5.37 | $6.47 | $5.51 | $5.75 |
| 89 | Traffic control (643.5000) | EACH | 1 | $4,000.00 | $4,088.00 | $23,921 | $4,199.81 | $16,900 |
| 90 | Geotextile type HR (645.0120) | SY | 140 | $3.75 | $3.83 | $5.89 | $7.00 | $6.00 |
| 91 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 15,982 | $1.82 | $2.24 | $2.30 | $1.93 | $2.55 |
| 92 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 246 | $3.65 | $3.58 | $3.50 | $3.87 | $3.85 |
| 93 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 309 | $20.75 | $11.24 | $11.00 | $22.00 | $12.00 |
| 94 | Marking diagonal epoxy 12-inch (646.7120) | LF | 298 | $20.25 | $10.73 | $10.50 | $21.47 | $11.50 |
| 95 | Marking curb epoxy (646.8120) | LF | 40 | $10.00 | $13.29 | $13.00 | $10.60 | $14.50 |
| 96 | Marking island nose epoxy (646.8220) | EACH | 4 | $372.00 | $260.61 | $255.00 | $394.49 | $280.00 |
| 97 | Marking removal line 6-inch (646.9002) | LF | 6,700 | $0.95 | $0.97 | $0.75 | $1.00 | $1.05 |
| 98 | Construction staking storm sewer (650.4000) | EACH | 19 | $350.00 | $357.70 | $350.00 | $367.48 | $385.00 |
| 99 | Construction staking subgrade (650.4500) | LF | 6,818 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 100 | Construction staking base (650.5000) | LF | 3,861 | $0.25 | $0.26 | $0.25 | $0.26 | $0.30 |
| 101 | Construction staking pipe culverts (650.6000) | EACH | 2 | $300.00 | $306.60 | $300.00 | $314.99 | $330.00 |
| 102 | Construction staking concrete pavement (650.7000) | LF | 2,957 | $6.50 | $6.64 | $6.50 | $6.82 | $7.00 |
| 103 | Construction staking electrical installations (project) 01. 1530-05- 75 (650.8501) | EACH | 1 | $5,000.00 | $5,110.00 | $5,000.00 | $5,249.77 | $1.10 |
| 104 | Construction staking supplemental control (project) 01. 1530-05-75 (650.9911) | EACH | 1 | $7,500.00 | $7,665.00 | $7,500.00 | $7,874.65 | $1.10 |
| 105 | Construction staking slope stakes (650.9920) | LF | 6,863 | $0.25 | $0.26 | $0.25 | $0.26 | $0.30 |
| 106 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,190 | $12.45 | $12.72 | $12.45 | $13.07 | $13.75 |
| 107 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 14 | $17.50 | $17.89 | $17.50 | $18.37 | $19.25 |
| 108 | Conduit special 2-inch (652.0605) | LF | 290 | $23.80 | $24.32 | $23.80 | $24.99 | $26.00 |
| 109 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 17 | $1,958.17 | $2,001.25 | $1,958.17 | $2,055.99 | $2,150.00 |
| 110 | Concrete bases type 5 (654.0105) | EACH | 13 | $1,570.29 | $1,604.84 | $1,570.29 | $1,648.73 | $3,140.00 |
| 111 | Concrete control cabinet bases type L30 (654.0230) | EACH | 1 | $3,426.52 | $3,501.90 | $3,426.52 | $3,597.69 | $3,770.00 |
| 112 | Electrical wire lighting 12 AWG (655.0610) | LF | 10,210 | $0.81 | $0.83 | $0.81 | $0.85 | $0.90 |
| 113 | Electrical service meter breaker pedestal (location) 01. station 12+59 'rab', 60.1' RT (656.0201) | EACH | 1 | $3,843.32 | $3,927.87 | $3,843.32 | $4,035.31 | $4,230.00 |
| 114 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 13 | $753.30 | $769.87 | $753.30 | $790.93 | $830.00 |
| 115 | Poles type 5-aluminum (657.0322) | EACH | 13 | $1,932.34 | $1,974.85 | $1,932.34 | $2,028.87 | $2,125.00 |
| 116 | Luminaire arms truss type 4 1/2- inch clamp 15-FT (657.0715) | EACH | 13 | $855.06 | $873.87 | $855.06 | $897.77 | $940.00 |
| 117 | Luminaires utility LED A (659.1115) | EACH | 13 | $632.87 | $646.79 | $632.87 | $664.48 | $696.00 |
| 118 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 1 | $9,574.56 | $9,785.20 | $9,574.56 | $10,053 | $10,530 |
| 119 | Salvage geodetic survey disk (682.0100) | EACH | 1 | $225.00 | $511.00 | $500.00 | $250.00 | $500.00 |
| 120 | Geodetic survey monument (682.0200) | EACH | 1 | $795.00 | $2,555.00 | $2,500.00 | $3,000.00 | $1,000.00 |
| 121 | Sawing asphalt (690.0150) | LF | 219 | $2.95 | $3.01 | $2.95 | $3.00 | $5.00 |
| 122 | Sawing concrete (690.0250) | LF | 63 | $2.95 | $3.01 | $2.95 | $6.00 | $7.00 |
| 123 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,975 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 124 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 125 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 800 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 126 | Special 01. temporary lighting (SPV.0060) | EACH | 1 | $6,098.32 | $6,232.48 | $6,098.32 | $6,402.95 | $6,700.00 |
| 127 | Special 02. salvaging solar powered flashing beacons (SPV.0060) | EACH | 1 | $358.08 | $365.96 | $358.08 | $375.97 | $395.00 |
| 128 | Special 01. cure and seal treatment, concrete curb and gutter (SPV.0090) | LF | 3,418 | $0.36 | $0.37 | $0.36 | $0.38 | $0.40 |
| 129 | Special 02. filling rumble strips (SPV.0090) | LF | 1,150 | $29.86 | $30.52 | $29.86 | $31.35 | $33.00 |
| 130 | Special 01. cure and seal treatment, concrete sidewalk (SPV.0165) | SF | 9,485 | $0.09 | $0.09 | $0.09 | $0.10 | $0.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.