WisDOT contract 20251111027 bid tabulation

Cumberland - Spooner; Charrie Ln to Barron/Washburn Co Ln (USH 063, Barron County Cumberland - Spooner). Let by Wisconsin DOT on November 11, 2025, Barron. 1 bid received; low bid $4,635,813 by Monarch Paving Company.

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
77
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Monarch Paving Company$4,635,813Low
WisDOT contract 20251111027: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Monarch Paving Company
1Removing asphaltic surface (204.0110)SY753$15.50
2Removing asphaltic surface butt joints (204.0115)SY836$17.74
3Removing asphaltic surface milling (204.0120)SY163,338$2.44
4Removing curb & gutter (204.0150)LF253$15.00
5Removing concrete sidewalk (204.0155)SY154$12.00
6Prepare foundation for asphaltic paving (project) 01. 1550-04-77 (211.0101)EACH1$14,580
7Finishing roadway (project) 01. 1550-04-77 (213.0100)EACH1$3,990.00
8Base aggregate dense 3/4-inch (305.0110)TON2,062$51.66
9Shaping shoulders (305.0500)STA47$260.48
10Drilled tie bars (416.0610)EACH18$16.03
11Tack coat (455.0605)GAL19,279$3.29
12HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$11,830
13HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$2,180.00
14Incentive density HMA pavement (460.2000)DOL6,500$1.00
15Incentive density PWL HMA pavement (460.2005)DOL19,190$1.00
16Incentive density HMA pavement longitudinal joints (460.2007)DOL17,860$1.00
17Incentive air voids HMA pavement (460.2010)DOL29,340$1.00
18HMA pavement 4 MT 58-34 V (460.6644)TON15,550$94.48
19HMA pavement 5 MT 58-34 V (460.6645)TON13,791$99.36
20Material transfer vehicle (460.9000.S)EACH1$20,350
21Asphaltic surface (465.0105)TON22$356.02
22Asphaltic surface patching (465.0110)TON300$231.81
23Asphaltic surface driveways and field entrances (465.0120)TON117$280.41
24Asphaltic rumble strips, shoulder (465.0520)LF48,121$0.26
25Asphaltic rumble strips, centerline (465.0560)LF24,551$0.36
26Cleaning culvert pipes (520.8700)EACH31$100.00
27Concrete curb & gutter 30-inch type D (601.0411)LF253$76.84
28Concrete sidewalk 4-inch (602.0405)SF928$20.31
29Curb ramp detectable warning field yellow (602.0505)SF10$60.61
30Curb ramp detectable warning field radial yellow (602.0605)SF84$74.30
31Adjusting manhole covers (611.8110)EACH9$1,155.00
32Adjusting inlet covers (611.8115)EACH1$1,060.00
33Maintenance and repair of haul roads (project) 01. 1550-04-77 (618.0100)EACH1$1.00
34Mobilization (619.1000)EACH1$461,030
35Water (624.0100)MGAL17$58.19
36Topsoil (625.0100)SY69$10.00
37Silt fence (628.1504)LF1,075$2.80
38Silt fence maintenance (628.1520)LF1,075$0.01
39Mobilizations erosion control (628.1905)EACH2$725.00
40Mobilizations emergency erosion control (628.1910)EACH1$10.00
41Erosion mat urban class I type B (628.2008)SY69$4.00
42Inlet protection type C (628.7015)EACH16$75.00
43Fertilizer type B (629.0210)CWT0.20$500.00
44Seeding mixture no. 40 (630.0140)LB3.10$200.00
45Seeding temporary (630.0200)LB1.90$100.00
46Seed water (630.0500)MGAL1.50$1.00
47Moving signs type II (638.2102)EACH1$400.00
48Field office type B (642.5001)EACH1$15,239
49Traffic control signs (643.0900)DAY2,895$0.39
50Traffic control signs PCMS (643.1050)DAY14$68.82
51Temporary marking line paint 6- inch (643.3165)LF176,979$0.21
52Temporary marking crosswalk removable tape 6-inch (643.3350)LF216$2.22
53Traffic control (643.5000)EACH1$85,811
54Temporary pedestrian curb ramp (644.1601)DAY24$19.47
55Temporary pedestrian detectable warning field (644.1605)SF80$8.75
56Temporary pedestrian barricade (644.1810)LF692$5.78
57Marking line epoxy 6-inch (646.2020)LF119$0.70
58Marking line grooved wet ref epoxy 6-inch (646.2040)LF123,247$1.27
59Marking line grooved wet ref epoxy 10-inch (646.4040)LF3,157$2.25
60Marking arrow epoxy (646.5020)EACH26$330.00
61Marking word epoxy (646.5120)EACH13$340.00
62Marking stop line epoxy 18-inch (646.6120)LF48$21.00
63Marking diagonal epoxy 12-inch (646.7120)LF297$10.00
64Marking crosswalk epoxy transverse line 6-inch (646.7420)LF198$10.50
65Marking corrugated median epoxy (646.8020)SF590$6.00
66Marking curb epoxy (646.8120)LF660$9.00
67Marking island nose epoxy (646.8220)EACH2$330.00
68Construction staking curb gutter and curb & gutter (650.5500)LF253$3.00
69Construction staking resurfacing reference (650.8000)LF34,450$0.08
70Construction staking curb ramps (650.9000)EACH6$100.00
71Construction staking sidewalk (project) 01. 1550-04-77 (650.9500)EACH1$500.00
72Construction staking supplemental control (project) 01. 1550-04-77 (650.9911)EACH1$500.00
73Sawing asphalt (690.0150)LF754$1.95
74Sawing concrete (690.0250)LF71$4.00
75Incentive iri ride (740.0440)DOL23,990$1.00
76On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,500$5.00
77On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS990$5.00
WisDOT contract 20251111027: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy