WisDOT contract 20251209016 bid tabulation
Port Washington-Sheboygan; Wilson/Lima Road - STH 42 (IH 043, Sheboygan County Port Washington - Sheboygan). Let by Wisconsin DOT on December 9, 2025, Sheboygan. 2 bids received; low bid $21,071,774 by Northeast Asphalt, Inc.
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 224
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northeast Asphalt, Inc | $21,071,774 | Low |
| 2 | Stark Pavement Corporation | $23,378,000 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northeast Asphalt, Inc | 2. Stark Pavement Corporation |
|---|---|---|---|---|---|
| 1 | Removing structure (structure) 01. B-59-0075 (203.0220) | EACH | 1 | $110,000 | $110,000 |
| 2 | Removing structure (structure) 02. B-59-0076 (203.0220) | EACH | 1 | $110,000 | $110,000 |
| 3 | Removing structure (structure) 03. B-59-0077 (203.0220) | EACH | 1 | $110,000 | $110,000 |
| 4 | Removing structure (structure) 04. B-59-0078 (203.0220) | EACH | 1 | $110,000 | $110,000 |
| 5 | Removing concrete pavement (204.0100) | SY | 1,203 | $8.50 | $33.50 |
| 6 | Removing asphaltic surface (204.0110) | SY | 100 | $10.00 | $30.00 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 9,909 | $12.40 | $8.20 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 575,609 | $1.00 | $2.61 |
| 9 | Removing asphaltic longitudinal notched wedge joint milling (204.0126.S) | LF | 106,209 | $0.55 | $1.76 |
| 10 | Removing curb & gutter (204.0150) | LF | 88 | $12.50 | $15.00 |
| 11 | Removing guardrail (204.0165) | LF | 28,628 | $2.00 | $2.50 |
| 12 | Removing fence (204.0170) | LF | 191,841 | $1.50 | $1.68 |
| 13 | Removing delineators and markers (204.0180) | EACH | 38 | $50.00 | $20.00 |
| 14 | Removing ancillary structure (structure) 01. S-59-0002 (204.0246) | EACH | 1 | $13,500 | $6,000.00 |
| 15 | Removing ancillary structure (structure) 02. S-59-0003 (204.0246) | EACH | 1 | $10,500 | $5,000.00 |
| 16 | Removing ancillary structure (structure) 03. S-59-0004 (204.0246) | EACH | 1 | $10,500 | $6,000.00 |
| 17 | Removing ancillary structure (structure) 04. S-59-0005 (204.0246) | EACH | 1 | $13,500 | $5,000.00 |
| 18 | Removing ancillary structure (structure) 05. S-59-0006 (204.0246) | EACH | 1 | $13,500 | $6,000.00 |
| 19 | Removing ancillary structure (structure) 06. S-59-0009 (204.0246) | EACH | 1 | $13,500 | $6,000.00 |
| 20 | Removing ancillary structure (structure) 07. S-59-0010 (204.0246) | EACH | 1 | $13,500 | $6,000.00 |
| 21 | Excavation common (205.0100) | CY | 387 | $25.25 | $60.72 |
| 22 | Excavation for structures bridges (structure) 01. B-59-0018 (206.1001) | EACH | 1 | $3,500.00 | $3,500.00 |
| 23 | Excavation for structures bridges (structure) 02. B-59-0019 (206.1001) | EACH | 1 | $3,500.00 | $3,500.00 |
| 24 | Excavation for structures bridges (structure) 03. B-59-0035 (206.1001) | EACH | 1 | $3,500.00 | $3,500.00 |
| 25 | Excavation for structures bridges (structure) 04. B-59-0037 (206.1001) | EACH | 1 | $3,500.00 | $3,500.00 |
| 26 | Excavation for structures bridges (structure) 05. B-59-0075 (206.1001) | EACH | 1 | $3,500.00 | $3,500.00 |
| 27 | Excavation for structures bridges (structure) 06. B-59-0076 (206.1001) | EACH | 1 | $3,500.00 | $3,500.00 |
| 28 | Excavation for structures bridges (structure) 07. B-59-0077 (206.1001) | EACH | 1 | $3,500.00 | $3,500.00 |
| 29 | Excavation for structures bridges (structure) 08. B-59-0078 (206.1001) | EACH | 1 | $3,500.00 | $3,500.00 |
| 30 | Backfill controlled low strength (209.0200.S) | CY | 3 | $500.00 | $500.00 |
| 31 | Backfill structure type A (210.1500) | TON | 936 | $26.25 | $40.00 |
| 32 | Prepare foundation for asphaltic paving (project) 01. 1222-13-71 (211.0101) | EACH | 1 | $15,870 | $17,000 |
| 33 | Prepare foundation for concrete pavement (project) 01. 1222-13-71 (211.0201) | EACH | 1 | $2,000.00 | $2,000.00 |
| 34 | Prepare foundation for concrete base (project) 01. 1222-13-71 (211.0301) | EACH | 1 | $2,000.00 | $2,000.00 |
| 35 | Finishing roadway (project) 01. 1222-13-71 (213.0100) | EACH | 1 | $5,000.00 | $1.00 |
| 36 | Base aggregate dense 3/4-inch (305.0110) | TON | 8,610 | $33.65 | $33.65 |
| 37 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 588 | $22.75 | $27.45 |
| 38 | Select crushed material (312.0110) | TON | 102 | $28.25 | $60.00 |
| 39 | Concrete base 9-inch (320.0155) | SY | 200 | $98.50 | $98.50 |
| 40 | Removing pavement for base patching (390.0100) | CY | 219 | $0.01 | $0.01 |
| 41 | Base patching concrete hes (390.0305) | CY | 219 | $420.00 | $420.00 |
| 42 | Concrete pavement 6-inch (415.0060) | SY | 216 | $110.00 | $110.00 |
| 43 | Concrete pavement 12-inch (415.0120) | SY | 278 | $139.00 | $139.00 |
| 44 | Concrete pavement approach slab (415.0410) | SY | 460 | $240.00 | $240.00 |
| 45 | Drilled tie bars (416.0610) | EACH | 33 | $10.00 | $10.00 |
| 46 | Drilled dowel bars (416.0620) | EACH | 886 | $18.50 | $18.50 |
| 47 | HMA cold weather paving (450.4000) | TON | 5,000 | $2.70 | $4.00 |
| 48 | Tack coat (455.0605) | GAL | 65,421 | $3.00 | $3.00 |
| 49 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $2,640.00 | $6,000.00 |
| 50 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,680.00 | $6,000.00 |
| 51 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 1 | $2,640.00 | $6,000.00 |
| 52 | HMA pavement test strip density (460.0120.S) | EACH | 1 | $3,680.00 | $6,000.00 |
| 53 | Incentive density HMA pavement (460.2000) | DOL | 48,670 | $1.00 | $1.00 |
| 54 | Incentive density PWL HMA pavement (460.2005) | DOL | 36,430 | $1.00 | $1.00 |
| 55 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 21,250 | $1.00 | $1.00 |
| 56 | Incentive air voids HMA pavement (460.2010) | DOL | 45,520 | $1.00 | $1.00 |
| 57 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 31,390 | $71.10 | $94.70 |
| 58 | HMA pavement 4 HT 58-28 S (460.7224) | TON | 53,600 | $71.10 | $81.00 |
| 59 | HMA pavement 4 SMA 58-28 V (460.8624) | TON | 36,570 | $90.80 | $101.00 |
| 60 | Material transfer vehicle (460.9000.S) | EACH | 1 | $98,739 | $40,000 |
| 61 | Asphaltic surface (465.0105) | TON | 442 | $177.00 | $175.00 |
| 62 | Asphaltic surface temporary (465.0125) | TON | 30 | $177.00 | $175.00 |
| 63 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 202,869 | $0.30 | $0.14 |
| 64 | Concrete masonry bridges (502.0100) | CY | 233 | $3,075.00 | $3,075.00 |
| 65 | Expansion device (502.3101) | LF | 121 | $250.00 | $250.00 |
| 66 | Protective surface treatment (502.3200) | SY | 478 | $5.00 | $5.00 |
| 67 | Pigmented surface sealer reseal (502.3205) | SY | 3,796 | $17.00 | $17.00 |
| 68 | Pigmented surface sealer (502.3210) | SY | 77 | $12.00 | $12.00 |
| 69 | Adhesive anchors no. 4 bar (502.4204) | EACH | 162 | $25.00 | $25.00 |
| 70 | Adhesive anchors no. 5 bar (502.4205) | EACH | 124 | $25.00 | $25.00 |
| 71 | Bar steel reinforcement HS structures (505.0400) | LB | 580 | $2.15 | $2.15 |
| 72 | Bar steel reinforcement HS coated structures (505.0600) | LB | 44,520 | $2.85 | $2.85 |
| 73 | Bar couplers no. 4 (505.0904) | EACH | 8 | $27.00 | $27.00 |
| 74 | Bar couplers no. 5 (505.0905) | EACH | 180 | $34.00 | $34.00 |
| 75 | Bar couplers no. 6 (505.0906) | EACH | 42 | $44.00 | $44.00 |
| 76 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 48 | $100.00 | $100.00 |
| 77 | Welded stud shear connectors 5/8X6-inch (506.3013) | EACH | 195 | $50.00 | $50.00 |
| 78 | Removing bearings (structure) 01. B-59-0075 (506.7050.S) | EACH | 12 | $1,500.00 | $1,500.00 |
| 79 | Removing bearings (structure) 02. B-59-0076 (506.7050.S) | EACH | 12 | $1,500.00 | $1,500.00 |
| 80 | Removing bearings (structure) 03. B-59-0077 (506.7050.S) | EACH | 12 | $1,500.00 | $1,500.00 |
| 81 | Removing bearings (structure) 04. B-59-0078 (506.7050.S) | EACH | 12 | $1,500.00 | $1,500.00 |
| 82 | Joint repair (509.1000) | SY | 53 | $2,050.00 | $2,050.00 |
| 83 | Curb repair (509.1200) | LF | 109 | $55.00 | $55.00 |
| 84 | Concrete surface repair (509.1500) | SF | 1,295 | $175.00 | $175.00 |
| 85 | Concrete masonry deck repair (509.2100.S) | CY | 21 | $450.00 | $450.00 |
| 86 | Epoxy injection crack repair (509.9025.S) | LF | 555 | $55.00 | $55.00 |
| 87 | Cored holes 2-inch diameter (509.9026.S) | EACH | 2 | $500.00 | $500.00 |
| 88 | Temporary shoring (structure) 01. B-59-0076 (511.1200) | SF | 100 | $65.00 | $65.00 |
| 89 | Temporary shoring (structure) 02. B-59-0077 (511.1200) | SF | 100 | $65.00 | $65.00 |
| 90 | Piling steel sheet permanent delivered (512.0500) | SF | 5,460 | $31.00 | $31.00 |
| 91 | Piling steel sheet permanent driven (512.0600) | SF | 5,460 | $12.00 | $12.00 |
| 92 | Rubberized membrane waterproofing (516.0500) | SY | 76 | $35.00 | $35.00 |
| 93 | Concrete masonry ancillary structures type NS (531.1100) | CY | 2.40 | $2,200.00 | $1,000.00 |
| 94 | Steel reinforcement HS ancillary structures type NS (531.1140) | LB | 360 | $5.00 | $4.75 |
| 95 | Drilling shaft 24-inch (531.2024) | LF | 20 | $100.00 | $50.00 |
| 96 | Drilling shaft 36-inch (531.2036) | LF | 520 | $215.00 | $200.00 |
| 97 | Foundation two-shaft type FC-I (structure) 01. S-59-0078 (531.6010) | EACH | 1 | $22,000 | $27,560 |
| 98 | Foundation two-shaft type FC-I (structure) 02. S-59-0080 (531.6010) | EACH | 1 | $22,000 | $27,560 |
| 99 | Foundation two-shaft type FC-I (structure) 03. S-59-0081 (531.6010) | EACH | 1 | $22,000 | $27,560 |
| 100 | Foundation two-shaft type FC-I (structure) 04. S-59-0084 (531.6010) | EACH | 1 | $22,000 | $27,560 |
| 101 | Foundation two-shaft type FC-I (structure) 05. S-59-0085 (531.6010) | EACH | 1 | $22,000 | $27,560 |
| 102 | Foundation two-shaft type FC-I (structure) 06. S-59-0086 (531.6010) | EACH | 1 | $22,000 | $27,560 |
| 103 | Foundation two-shaft type FF-I (structure) 01. S-59-0077 (531.6110) | EACH | 2 | $22,500 | $28,975 |
| 104 | Foundation two-shaft type FF-I (structure) 02. S-59-0079 (531.6110) | EACH | 2 | $22,500 | $28,975 |
| 105 | Foundation two-shaft type FF-II (structure) 01. S-59-0082 (531.6120) | EACH | 2 | $22,500 | $34,500 |
| 106 | Foundation two-shaft type FF-II (structure) 02. S-59-0083 (531.6120) | EACH | 2 | $22,500 | $34,500 |
| 107 | Truss cantilever 4-chord type I (structure) 01. S-59-0078 (532.6010) | EACH | 1 | $53,000 | $50,250 |
| 108 | Truss cantilever 4-chord type I (structure) 02. S-59-0080 (532.6010) | EACH | 1 | $53,000 | $50,250 |
| 109 | Truss cantilever 4-chord type I (structure) 03. S-59-0081 (532.6010) | EACH | 1 | $53,000 | $50,250 |
| 110 | Truss cantilever 4-chord type I (structure) 04. S-59-0084 (532.6010) | EACH | 1 | $53,000 | $50,250 |
| 111 | Truss cantilever 4-chord type I (structure) 05. S-59-0085 (532.6010) | EACH | 1 | $53,000 | $50,250 |
| 112 | Truss cantilever 4-chord type I (structure) 06. S-59-0086 (532.6010) | EACH | 1 | $53,000 | $50,250 |
| 113 | Truss full span 4-chord type I (structure) 01. S-59-0077 (532.6110) | EACH | 1 | $65,000 | $78,250 |
| 114 | Truss full span 4-chord type I (structure) 02. S-59-0079 (532.6110) | EACH | 1 | $65,000 | $78,250 |
| 115 | Truss full span 4-chord type II (structure) 01. S-59-0082 (532.6120) | EACH | 1 | $75,500 | $86,250 |
| 116 | Truss full span 4-chord type II (structure) 02. S-59-0083 (532.6120) | EACH | 1 | $75,500 | $86,250 |
| 117 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 450 | $85.00 | $85.00 |
| 118 | Concrete surface drains (602.3010) | CY | 3.50 | $1,500.00 | $1,500.00 |
| 119 | Concrete barrier temporary precast delivered (603.8000) | LF | 4,840 | $14.00 | $14.00 |
| 120 | Concrete barrier temporary precast installed (603.8125) | LF | 7,340 | $4.00 | $4.00 |
| 121 | Anchoring concrete barrier temporary precast (603.8500) | LF | 3,738 | $12.00 | $12.00 |
| 122 | Anchoring concrete barrier temporary precast on bridge decks (603.8505) | LF | 412 | $15.00 | $15.00 |
| 123 | Slope paving repair crushed aggregate (604.9010.S) | CY | 26 | $300.00 | $95.00 |
| 124 | Reseal crushed aggregate slope paving (604.9015.S) | SY | 2,526 | $16.20 | $22.00 |
| 125 | Riprap medium (606.0200) | CY | 6.50 | $145.00 | $1,000.00 |
| 126 | Riprap heavy (606.0300) | CY | 67 | $132.00 | $160.00 |
| 127 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 73 | $115.25 | $130.70 |
| 128 | Reconstructing inlets (611.0430) | EACH | 1 | $1,650.00 | $1,780.30 |
| 129 | Inlet covers type MS (611.0642) | EACH | 1 | $950.00 | $554.00 |
| 130 | Inlets median 1 grate (611.3901) | EACH | 1 | $3,395.25 | $3,452.00 |
| 131 | Adjusting inlet covers (611.8115) | EACH | 1 | $1,350.00 | $520.00 |
| 132 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 30 | $16.66 | $7.00 |
| 133 | Barrier system grading shaping finishing (614.0010) | EACH | 56 | $1,714.50 | $4,250.00 |
| 134 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 1 | $250.00 | $250.00 |
| 135 | Steel thrie beam bullnose terminal (614.0220) | EACH | 1 | $15,500 | $11,000 |
| 136 | Steel thrie beam (614.0230) | LF | 1,031 | $35.00 | $36.00 |
| 137 | Crash cushions temporary (614.0905) | EACH | 14 | $3,585.00 | $5,872.20 |
| 138 | MGS guardrail 3 (614.2300) | LF | 23,525 | $25.00 | $28.00 |
| 139 | MGS guardrail 3 HS (614.2310) | LF | 659 | $35.00 | $38.00 |
| 140 | MGS thrie beam transition (614.2500) | LF | 1,724 | $89.00 | $90.00 |
| 141 | MGS guardrail terminal eat (614.2610) | EACH | 59 | $4,800.00 | $3,400.00 |
| 142 | MGS guardrail terminal type 2 (614.2620) | EACH | 28 | $3,000.00 | $2,800.00 |
| 143 | Fence woven wire (height) 01. 4- FT (616.0100) | LF | 191,346 | $6.24 | $5.93 |
| 144 | Fence chain link 10-FT (616.0210) | LF | 500 | $65.00 | $40.00 |
| 145 | Maintenance and repair of haul roads (project) 01. 1222-13-71 (618.0100) | EACH | 1 | $10.00 | $1.00 |
| 146 | Mobilization (619.1000) | EACH | 1 | $1,210,870 | $617,319 |
| 147 | Water (624.0100) | MGAL | 129.50 | $186.85 | $186.85 |
| 148 | Salvaged topsoil (625.0500) | SY | 530 | $6.50 | $10.00 |
| 149 | Silt fence (628.1504) | LF | 14,490 | $2.00 | $1.85 |
| 150 | Silt fence maintenance (628.1520) | LF | 3,623 | $0.01 | $0.01 |
| 151 | Mobilizations erosion control (628.1905) | EACH | 10 | $1.00 | $200.00 |
| 152 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $1.00 | $50.00 |
| 153 | Erosion mat class I type B (628.2004) | SY | 530 | $4.00 | $2.00 |
| 154 | Inlet protection type A (628.7005) | EACH | 4 | $200.00 | $150.00 |
| 155 | Fertilizer type B (629.0210) | CWT | 0.40 | $500.00 | $250.00 |
| 156 | Seeding mixture no. 30 (630.0130) | LB | 1.20 | $50.00 | $100.00 |
| 157 | Seed water (630.0500) | MGAL | 12.70 | $200.00 | $90.00 |
| 158 | Markers permanent flexible (633.5350) | EACH | 38 | $85.00 | $60.00 |
| 159 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 10 | $200.00 | $80.00 |
| 160 | Sign supports structural steel HS (635.0200) | LB | 1,440 | $8.00 | $4.75 |
| 161 | Signs type I reflective SH (637.1220) | SF | 1,566.50 | $26.00 | $28.50 |
| 162 | Signs type II reflective H (637.2210) | SF | 33 | $30.00 | $23.50 |
| 163 | Moving signs type I (638.2101) | EACH | 12 | $1,500.00 | $800.00 |
| 164 | Moving signs type II (638.2102) | EACH | 8 | $200.00 | $125.00 |
| 165 | Removing signs type I (638.2601) | EACH | 10 | $500.00 | $350.00 |
| 166 | Removing signs type II (638.2602) | EACH | 3 | $50.00 | $50.00 |
| 167 | Removing small sign supports (638.3000) | EACH | 4 | $50.00 | $50.00 |
| 168 | Removing structural steel sign supports (638.3100) | EACH | 4 | $750.00 | $350.00 |
| 169 | Field office type C (642.5201) | EACH | 1 | $25,610 | $27,000 |
| 170 | Traffic control drums (643.0300) | DAY | 230,652 | $0.25 | $0.33 |
| 171 | Temporary tape rumble strip orange (643.0320.S) | LF | 1,296 | $10.75 | $20.08 |
| 172 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 418 | $160.00 | $124.21 |
| 173 | Traffic control barricades type III (643.0420) | DAY | 2,482 | $2.50 | $1.14 |
| 174 | Traffic control warning lights type A (643.0705) | DAY | 4,934 | $1.00 | $0.38 |
| 175 | Traffic control warning lights type C (643.0715) | DAY | 26,558 | $0.25 | $0.22 |
| 176 | Traffic control connected arrow boards (643.0810) | DAY | 1,010 | $9.75 | $13.61 |
| 177 | Traffic control signs (643.0900) | DAY | 18,878 | $0.45 | $0.67 |
| 178 | Traffic control covering signs type I (643.0910) | EACH | 46 | $235.00 | $99.44 |
| 179 | Traffic control covering signs type II (643.0920) | EACH | 78 | $90.00 | $70.41 |
| 180 | Traffic control signs fixed message (643.1000) | SF | 396 | $18.15 | $29.36 |
| 181 | Traffic control signs PCMS (643.1050) | DAY | 273 | $18.50 | $70.87 |
| 182 | Basic traffic queue warning system (643.1205.S) | DAY | 418 | $160.00 | $96.28 |
| 183 | Temporary marking line paint 4- inch (643.3105) | LF | 27,820 | $0.21 | $0.45 |
| 184 | Temporary marking line paint 6- inch (643.3165) | LF | 580,499 | $0.23 | $0.48 |
| 185 | Temporary marking line removable tape 6-inch (643.3180) | LF | 1,513 | $2.25 | $3.22 |
| 186 | Temporary marking line paint 10- inch (643.3265) | LF | 3,200 | $0.75 | $1.00 |
| 187 | Temporary marking line removable tape 10-inch (643.3280) | LF | 337 | $4.00 | $5.96 |
| 188 | Temporary marking stop line paint 18-inch (643.3805) | LF | 24 | $25.00 | $15.00 |
| 189 | Traffic control (643.5000) | EACH | 1 | $282,500 | $155,895 |
| 190 | Temporary pedestrian barricade (644.1810) | LF | 830 | $5.70 | $8.96 |
| 191 | Geotextile type HR (645.0120) | SY | 141 | $6.00 | $8.00 |
| 192 | Marking line epoxy 4-inch (646.1020) | LF | 3,570 | $0.33 | $0.30 |
| 193 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 27,464 | $0.84 | $0.85 |
| 194 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 274,341 | $1.22 | $1.25 |
| 195 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 27,464 | $7.11 | $7.50 |
| 196 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 18,082 | $12.69 | $12.50 |
| 197 | Marking aerial enforcement bar epoxy (646.5420) | EACH | 20 | $370.10 | $260.00 |
| 198 | Marking diagonal epoxy 12-inch (646.7120) | LF | 180 | $15.21 | $18.00 |
| 199 | Marking removal line 4-inch (646.9000) | LF | 12,650 | $0.50 | $0.50 |
| 200 | Marking removal line grooved permanent tape 4-inch (646.9050) | LF | 530 | $3.45 | $0.55 |
| 201 | Marking removal line 8-inch (646.9100) | LF | 180 | $2.50 | $1.00 |
| 202 | Marking removal line grooved permanent tape 8-inch (646.9150) | LF | 1,160 | $3.95 | $1.05 |
| 203 | Construction staking storm sewer (650.4000) | EACH | 1 | $43.83 | $43.83 |
| 204 | Construction staking subgrade (650.4500) | LF | 75 | $0.01 | $3.00 |
| 205 | Construction staking base (650.5000) | LF | 75 | $1.28 | $3.00 |
| 206 | Construction staking resurfacing reference (650.8000) | LF | 138,390 | $0.09 | $0.09 |
| 207 | Construction staking supplemental control (project) 01. 1222-13-71 (650.9911) | EACH | 1 | $446.98 | $446.98 |
| 208 | Construction staking slope stakes (650.9920) | LF | 9,810 | $0.90 | $0.90 |
| 209 | Temporary traffic signals for bridges (structure) 01. B-59-0020 (661.0101) | EACH | 4 | $750.00 | $1,758.97 |
| 210 | Sawing asphalt (690.0150) | LF | 92 | $1.75 | $2.55 |
| 211 | Sawing concrete (690.0250) | LF | 3,201 | $2.55 | $2.75 |
| 212 | Incentive strength concrete structures (715.0502) | DOL | 1,404 | $1.00 | $1.00 |
| 213 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 |
| 214 | Incentive iri ride (740.0440) | DOL | 166,000 | $1.00 | $1.00 |
| 215 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 |
| 216 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 5,760 | $5.00 | $5.00 |
| 217 | Special 01. removing sand barrel array and concrete pad (SPV.0060) | EACH | 12 | $2,850.00 | $3,000.00 |
| 218 | Special 02. storm sewer tap (SPV.0060) | EACH | 1 | $1,550.00 | $820.00 |
| 219 | Special 03. joint sealant parapet (SPV.0060) | EACH | 130 | $35.00 | $35.00 |
| 220 | Special 01. native seeding mixture no. 75 updated (SPV.0085) | LB | 3.60 | $250.00 | $150.00 |
| 221 | Special 02. joint sealing (SPV.0090) | LF | 2,099 | $12.00 | $10.00 |
| 222 | Special 01. removing loose concrete overhead (SPV.0165) | SF | 4 | $150.00 | $150.00 |
| 223 | Special 01. abutment seat cleaning and sealing (SPV.0180) | SY | 44 | $120.00 | $120.00 |
| 224 | Special 02. bearing seat surface preparation (SPV.0180) | SY | 72 | $95.00 | $95.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.