| 1 | Grubbing (201.0205) | STA | 3 | $1,000.00 | $1,500.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 1 | $500.00 | $920.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 61 | $17.70 | $15.50 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 15,120 | $2.10 | $1.55 |
| 5 | Removing curb & gutter (204.0150) | LF | 43 | $17.50 | $15.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 10 | $27.00 | $10.00 |
| 7 | Removing guardrail (204.0165) | LF | 1,641 | $2.50 | $2.00 |
| 8 | Excavation common (205.0100) | CY | 1,811 | $21.61 | $25.61 |
| 9 | Borrow (208.0100) | CY | 780 | $25.00 | $24.27 |
| 10 | Finishing roadway (project) 01. 4488-00-01 (213.0100) | EACH | 1 | $2,150.00 | $5,125.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 4,230 | $23.25 | $23.25 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,270 | $21.00 | $25.51 |
| 13 | Base aggregate open-graded (310.0115) | CY | 20 | $50.00 | $56.00 |
| 14 | Select crushed material (312.0110) | TON | 1,440 | $18.00 | $19.66 |
| 15 | Pulverize and relay (325.0100) | SY | 76,180 | $1.50 | $1.15 |
| 16 | QMP pulverize and relay compaction (374.1020.S) | SY | 76,180 | $0.07 | $0.40 |
| 17 | HMA cold weather paving (450.4000) | TON | 4,800 | $0.01 | $0.01 |
| 18 | Tack coat (455.0605) | GAL | 6,410 | $3.10 | $3.65 |
| 19 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $2,150.00 | $5,520.00 |
| 20 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $3,150.00 | $6,325.00 |
| 21 | Incentive density PWL HMA pavement (460.2005) | DOL | 14,340 | $1.00 | $1.00 |
| 22 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 9,350 | $1.00 | $1.00 |
| 23 | Incentive air voids HMA pavement (460.2010) | DOL | 19,030 | $1.00 | $1.00 |
| 24 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 9,850 | $62.70 | $71.20 |
| 25 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 9,380 | $68.70 | $74.70 |
| 26 | Asphaltic surface patching (465.0110) | TON | 50 | $162.50 | $227.00 |
| 27 | Asphaltic surface driveways and field entrances (465.0120) | TON | 65 | $162.50 | $204.00 |
| 28 | Asphaltic rumble strips, centerline (465.0560) | LF | 24,122 | $0.31 | $0.43 |
| 29 | Apron endwalls for pipe arch steel 57X38-inch (521.1257) | EACH | 2 | $1,665.00 | $2,985.00 |
| 30 | Pipe arch corrugated steel 57X38- inch (521.3757) | LF | 68 | $183.00 | $235.50 |
| 31 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 43 | $55.00 | $94.00 |
| 32 | Riprap medium (606.0200) | CY | 145 | $100.00 | $75.00 |
| 33 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 252 | $32.00 | $52.50 |
| 34 | MGS guardrail 3 (614.2300) | LF | 237.50 | $32.00 | $29.25 |
| 35 | MGS guardrail 3 K (614.2330) | LF | 362.50 | $42.00 | $42.00 |
| 36 | MGS thrie beam transition (614.2500) | LF | 157.60 | $92.00 | $95.00 |
| 37 | MGS guardrail terminal eat (614.2610) | EACH | 11 | $3,800.00 | $3,433.00 |
| 38 | Mobilization (619.1000) | EACH | 1 | $122,425 | $111,832 |
| 39 | Water (624.0100) | MGAL | 490 | $77.00 | $55.00 |
| 40 | Salvaged topsoil (625.0500) | SY | 7,160 | $3.00 | $3.74 |
| 41 | Silt fence (628.1504) | LF | 4,145 | $1.98 | $2.00 |
| 42 | Silt fence maintenance (628.1520) | LF | 4,145 | $0.01 | $0.03 |
| 43 | Mobilizations erosion control (628.1905) | EACH | 2 | $250.00 | $351.00 |
| 44 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $352.00 |
| 45 | Erosion mat urban class I type B (628.2008) | SY | 2,250 | $1.80 | $2.00 |
| 46 | Erosion mat class II type C (628.2027) | SY | 4,910 | $2.65 | $3.85 |
| 47 | Temporary ditch checks (628.7504) | LF | 30 | $8.50 | $10.00 |
| 48 | Culvert pipe checks (628.7555) | EACH | 65 | $15.00 | $25.00 |
| 49 | Rock bags (628.7570) | EACH | 40 | $15.00 | $8.00 |
| 50 | Fertilizer type B (629.0210) | CWT | 4.50 | $100.00 | $125.00 |
| 51 | Seeding mixture no. 30 (630.0130) | LB | 140 | $7.75 | $12.00 |
| 52 | Seed water (630.0500) | MGAL | 44 | $5.00 | $7.00 |
| 53 | Markers culvert end (633.5200) | EACH | 2 | $70.00 | $92.00 |
| 54 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 2 | $100.00 | $125.00 |
| 55 | Signs type II reflective F (637.2230) | SF | 18 | $27.00 | $35.00 |
| 56 | Moving signs type II (638.2102) | EACH | 8 | $75.00 | $100.00 |
| 57 | Removing signs type II (638.2602) | EACH | 4 | $35.00 | $30.00 |
| 58 | Removing small sign supports (638.3000) | EACH | 4 | $35.00 | $30.00 |
| 59 | Moving small sign supports (638.4000) | EACH | 6 | $75.00 | $100.00 |
| 60 | Field office type B (642.5001) | EACH | 1 | $7,250.00 | $12,335 |
| 61 | Traffic control barricades type III (643.0420) | DAY | 196 | $0.75 | $2.50 |
| 62 | Traffic control warning lights type A (643.0705) | DAY | 280 | $0.20 | $1.00 |
| 63 | Traffic control signs (643.0900) | DAY | 3,378 | $0.65 | $1.50 |
| 64 | Traffic control covering signs type II (643.0920) | EACH | 5 | $75.00 | $25.00 |
| 65 | Traffic control signs PCMS (643.1050) | DAY | 28 | $85.00 | $60.00 |
| 66 | Temporary marking line paint 4- inch (643.3105) | LF | 14,897 | $0.55 | $0.85 |
| 67 | Traffic control (643.5000) | EACH | 1 | $3,500.00 | $8,450.00 |
| 68 | Geotextile type DF schedule A (645.0111) | SY | 235 | $7.00 | $4.00 |
| 69 | Geotextile type HR (645.0120) | SY | 285 | $5.00 | $9.00 |
| 70 | Marking line epoxy 4-inch (646.1020) | LF | 65,653 | $0.38 | $0.68 |
| 71 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $1,500.00 | $1,700.00 |
| 72 | Marking stop line epoxy 18-inch (646.6120) | LF | 44 | $25.00 | $13.00 |
| 73 | Locating no-passing zones (648.0100) | MI | 4.81 | $650.00 | $415.00 |
| 74 | Construction staking pipe culverts (650.6000) | EACH | 1 | $650.00 | $650.00 |
| 75 | Construction staking resurfacing reference (650.8000) | LF | 25,083 | $0.12 | $0.12 |
| 76 | Construction staking supplemental control (project) 01. 4482-00-01 (650.9911) | EACH | 1 | $10.00 | $10.00 |
| 77 | Construction staking slope stakes (650.9920) | LF | 1,322 | $1.00 | $1.00 |
| 78 | Sawing asphalt (690.0150) | LF | 594 | $1.89 | $1.95 |
| 79 | Sawing concrete (690.0250) | LF | 15 | $2.95 | $2.95 |
| 80 | Incentive iri ride (740.0440) | DOL | 9,500 | $1.00 | $1.00 |
| 81 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 |
| 82 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,200 | $5.00 | $5.00 |
| 83 | Special 01. MSKT SP-MGS LT-2 terminal (SPV.0060) | EACH | 1 | $3,500.00 | $3,895.00 |