WisDOT contract 20251209019 bid tabulation
Fond Du Lac Co, CTH K; Taycheedah Creek Bridge (CTH K, Fond du Lac County Fond du lac Co, CTH K). Let by Wisconsin DOT on December 9, 2025, Fond Du Lac. 5 bids received; low bid $1,241,604 by Sheet Piling Services LLC.
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 83
- Data through
- 10 NOV 2026
4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sheet Piling Services LLC | $1,241,604 | Low |
| 3 | Lunda Construction Company | $1,293,140 | +4.0% |
| 4 | Radtke Contractors Inc. | $1,360,610 | +10% |
| 5 | Zenith Tech., Inc. - Waukesha | $1,483,292 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sheet Piling Services LLC | 2. Lunda Construction Company | 3. Radtke Contractors Inc. | 4. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 8 | $1,195.00 | $1,195.00 | $1,000.00 | $1,195.00 |
| 2 | Grubbing (201.0205) | STA | 8 | $385.00 | $385.00 | $600.00 | $385.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 1 | $700.00 | $700.00 | $200.00 | $700.00 |
| 4 | Removing structure over waterway remove debris (structure) 01. B-20- 015 (203.0250) | EACH | 1 | $75,000 | $100,000 | $68,297 | $80,000 |
| 5 | Removing guardrail (204.0165) | LF | 600 | $3.50 | $3.50 | $2.85 | $3.00 |
| 6 | Excavation common (205.0100) | CY | 4,350 | $11.60 | $11.60 | $22.00 | $11.60 |
| 7 | Excavation for structures bridges (structure) 01. B-20-265 (206.1001) | EACH | 1 | $35,000 | $25,000 | $70,220 | $75,000 |
| 8 | Backfill structure type A (210.1500) | TON | 330 | $28.50 | $28.50 | $35.29 | $28.50 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 4812-00-01 (211.0101) | EACH | 1 | $8,750.00 | $4,210.00 | $1,000.00 | $4,210.00 |
| 10 | Finishing roadway (project) 01. 4812-00-01 (213.0100) | EACH | 1 | $0.01 | $1,500.00 | $500.00 | $1,539.79 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 310 | $32.00 | $32.00 | $24.75 | $32.00 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 3,470 | $13.50 | $13.50 | $22.75 | $13.50 |
| 13 | Breaker run (311.0110) | TON | 2,700 | $12.50 | $12.50 | $22.50 | $12.50 |
| 14 | Concrete pavement approach slab (415.0410) | SY | 195 | $215.00 | $215.00 | $216.00 | $259.79 |
| 15 | Tack coat (455.0605) | GAL | 150 | $7.45 | $3.10 | $3.10 | $3.10 |
| 16 | Asphaltic surface (465.0105) | TON | 780 | $86.45 | $93.70 | $99.10 | $93.70 |
| 17 | Concrete masonry bridges (502.0100) | CY | 375 | $800.00 | $700.00 | $795.33 | $995.00 |
| 18 | Protective surface treatment (502.3200) | SY | 535 | $2.50 | $5.00 | $3.69 | $4.00 |
| 19 | Pigmented surface sealer (502.3210) | SY | 110 | $2.50 | $12.00 | $10.84 | $13.00 |
| 20 | Prestressed girder type I 36W-inch (503.0137) | LF | 330 | $300.00 | $350.00 | $271.43 | $250.00 |
| 21 | Bar steel reinforcement HS structures (505.0400) | LB | 6,750 | $1.45 | $1.25 | $1.40 | $1.25 |
| 22 | Bar steel reinforcement HS coated structures (505.0600) | LB | 47,380 | $1.55 | $1.40 | $1.33 | $1.50 |
| 23 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 1,460 | $5.00 | $3.80 | $3.84 | $4.25 |
| 24 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 10 | $125.00 | $100.00 | $247.91 | $150.00 |
| 25 | Steel diaphragms (structure) 01. B- 20-265 (506.4000) | EACH | 4 | $1,250.00 | $1,500.00 | $1,128.85 | $1,500.00 |
| 26 | Rubberized membrane waterproofing (516.0500) | SY | 18 | $18.00 | $35.00 | $64.32 | $60.00 |
| 27 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 2 | $750.00 | $750.00 | $400.00 | $750.00 |
| 28 | Culvert pipe class III-A 24-inch (520.3324) | LF | 46 | $68.00 | $68.00 | $69.00 | $68.00 |
| 29 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 1,200 | $40.00 | $45.00 | $32.24 | $70.00 |
| 30 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 26 | $58.00 | $58.00 | $100.00 | $218.79 |
| 31 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 28 | $58.00 | $58.00 | $100.00 | $206.47 |
| 32 | Concrete surface drains (602.3010) | CY | 1 | $850.00 | $850.00 | $3,000.00 | $2,116.85 |
| 33 | Riprap light (606.0100) | CY | 150 | $81.00 | $81.00 | $74.00 | $81.00 |
| 34 | Riprap extra-heavy (606.0400) | CY | 465 | $81.00 | $85.00 | $78.98 | $90.00 |
| 35 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 220 | $6.00 | $6.00 | $4.26 | $6.00 |
| 36 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $250.00 | $200.00 | $365.69 | $375.00 |
| 37 | MGS guardrail 3 (614.2300) | LF | 150 | $27.00 | $27.00 | $30.00 | $30.00 |
| 38 | MGS thrie beam transition (614.2500) | LF | 160 | $92.00 | $92.00 | $95.00 | $100.00 |
| 39 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $4,000.00 | $4,000.00 | $4,200.00 | $4,200.00 |
| 40 | Mobilization (619.1000) | EACH | 1 | $95,967 | $147,684 | $109,992 | $169,500 |
| 41 | Water (624.0100) | MGAL | 90 | $50.00 | $50.00 | $85.00 | $50.00 |
| 42 | Salvaged topsoil (625.0500) | SY | 5,000 | $2.70 | $2.70 | $3.00 | $2.70 |
| 43 | Silt fence (628.1504) | LF | 1,100 | $2.20 | $2.20 | $2.05 | $2.50 |
| 44 | Silt fence maintenance (628.1520) | LF | 3,400 | $0.01 | $0.01 | $0.01 | $0.25 |
| 45 | Mobilizations erosion control (628.1905) | EACH | 5 | $420.00 | $420.00 | $200.00 | $110.00 |
| 46 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $350.00 | $350.00 | $200.00 | $150.00 |
| 47 | Erosion mat class I type B (628.2004) | SY | 1,300 | $1.70 | $1.70 | $1.25 | $2.00 |
| 48 | Erosion mat urban class I type B (628.2008) | SY | 3,750 | $2.29 | $2.29 | $1.95 | $2.10 |
| 49 | Turbidity barriers (628.6005) | SY | 475 | $46.00 | $46.00 | $40.00 | $40.00 |
| 50 | Temporary ditch checks (628.7504) | LF | 70 | $8.95 | $8.95 | $8.95 | $8.00 |
| 51 | Culvert pipe checks (628.7555) | EACH | 3 | $21.30 | $21.30 | $20.00 | $20.00 |
| 52 | Rock bags (628.7570) | EACH | 21 | $14.00 | $14.00 | $12.00 | $10.00 |
| 53 | Fertilizer type B (629.0210) | CWT | 5 | $110.00 | $110.00 | $85.00 | $100.00 |
| 54 | Seeding mixture no. 20 (630.0120) | LB | 320 | $8.75 | $8.75 | $7.95 | $8.00 |
| 55 | Seeding mixture no. 60 (630.0160) | LB | 2 | $26.00 | $26.00 | $100.00 | $20.00 |
| 56 | Seeding temporary (630.0200) | LB | 190 | $3.55 | $3.55 | $3.50 | $4.00 |
| 57 | Seed water (630.0500) | MGAL | 150 | $25.00 | $25.00 | $15.00 | $5.00 |
| 58 | Markers row (633.5100) | EACH | 16 | $74.00 | $74.00 | $75.00 | $60.00 |
| 59 | Removing signs type II (638.2602) | EACH | 4 | $25.00 | $25.00 | $35.00 | $20.00 |
| 60 | Removing small sign supports (638.3000) | EACH | 4 | $25.00 | $25.00 | $35.00 | $20.00 |
| 61 | Field office type B (642.5001) | EACH | 1 | $3,000.00 | $3,000.00 | $1,514.52 | $6,000.00 |
| 62 | Traffic control barricades type III (643.0420) | DAY | 1,890 | $0.68 | $0.68 | $0.68 | $0.68 |
| 63 | Traffic control warning lights type A (643.0705) | DAY | 2,940 | $0.20 | $0.20 | $0.20 | $0.20 |
| 64 | Traffic control signs (643.0900) | DAY | 1,470 | $0.62 | $0.62 | $0.62 | $0.62 |
| 65 | Traffic control signs PCMS (643.1050) | DAY | 14 | $45.00 | $45.00 | $45.00 | $45.00 |
| 66 | Traffic control (643.5000) | EACH | 1 | $2,520.00 | $2,520.00 | $2,520.00 | $2,520.00 |
| 67 | Geotextile type DF schedule A (645.0111) | SY | 90 | $7.00 | $7.00 | $4.71 | $7.00 |
| 68 | Geotextile type HR (645.0120) | SY | 615 | $2.50 | $5.00 | $5.10 | $7.78 |
| 69 | Geotextile type R (645.0130) | SY | 535 | $5.00 | $5.00 | $7.00 | $5.00 |
| 70 | Marking line epoxy 6-inch (646.2020) | LF | 3,200 | $2.00 | $2.00 | $2.10 | $2.30 |
| 71 | Construction staking subgrade (650.4500) | LF | 730 | $0.01 | $0.01 | $0.01 | $0.01 |
| 72 | Construction staking base (650.5000) | LF | 645 | $1.32 | $1.50 | $1.50 | $1.50 |
| 73 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 26 | $5.50 | $30.00 | $30.00 | $30.00 |
| 74 | Construction staking structure layout (structure) 01. 4812-00-01 (650.6501) | EACH | 1 | $4,369.96 | $4,000.00 | $4,000.00 | $4,000.00 |
| 75 | Construction staking concrete pavement (650.7000) | LF | 90 | $5.50 | $15.00 | $15.00 | $15.00 |
| 76 | Construction staking supplemental control (project) 01. 4812-00-01 (650.9911) | EACH | 1 | $860.39 | $1,000.00 | $1,000.00 | $1,000.00 |
| 77 | Construction staking slope stakes (650.9920) | LF | 730 | $0.93 | $1.00 | $1.00 | $1.00 |
| 78 | Sawing asphalt (690.0150) | LF | 80 | $2.95 | $2.95 | $2.95 | $2.95 |
| 79 | Incentive strength concrete structures (715.0502) | DOL | 2,250 | $1.00 | $1.00 | $1.00 | $1.00 |
| 80 | Installing and maintaining bird deterrent system (station) 01. station 13+21 (999.2000.S) | EACH | 1 | $0.01 | $1.00 | $0.01 | $2,500.00 |
| 81 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 82 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 |
| 83 | Special 01. select crushed material for travel corridor (SPV.0195) | TON | 200 | $40.00 | $40.00 | $29.12 | $45.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.