WisDOT contract 20251209019 bid tabulation

Fond Du Lac Co, CTH K; Taycheedah Creek Bridge (CTH K, Fond du Lac County Fond du lac Co, CTH K). Let by Wisconsin DOT on December 9, 2025, Fond Du Lac. 5 bids received; low bid $1,241,604 by Sheet Piling Services LLC.

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
83
Data through
10 NOV 2026

4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Sheet Piling Services LLC$1,241,604Low
3Lunda Construction Company$1,293,140+4.0%
4Radtke Contractors Inc.$1,360,610+10%
5Zenith Tech., Inc. - Waukesha$1,483,292+19%
WisDOT contract 20251209019: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sheet Piling Services LLC2. Lunda Construction Company3. Radtke Contractors Inc.4. Zenith Tech., Inc. - Waukesha
1Clearing (201.0105)STA8$1,195.00$1,195.00$1,000.00$1,195.00
2Grubbing (201.0205)STA8$385.00$385.00$600.00$385.00
3Removing small pipe culverts (203.0100)EACH1$700.00$700.00$200.00$700.00
4Removing structure over waterway remove debris (structure) 01. B-20- 015 (203.0250)EACH1$75,000$100,000$68,297$80,000
5Removing guardrail (204.0165)LF600$3.50$3.50$2.85$3.00
6Excavation common (205.0100)CY4,350$11.60$11.60$22.00$11.60
7Excavation for structures bridges (structure) 01. B-20-265 (206.1001)EACH1$35,000$25,000$70,220$75,000
8Backfill structure type A (210.1500)TON330$28.50$28.50$35.29$28.50
9Prepare foundation for asphaltic paving (project) 01. 4812-00-01 (211.0101)EACH1$8,750.00$4,210.00$1,000.00$4,210.00
10Finishing roadway (project) 01. 4812-00-01 (213.0100)EACH1$0.01$1,500.00$500.00$1,539.79
11Base aggregate dense 3/4-inch (305.0110)TON310$32.00$32.00$24.75$32.00
12Base aggregate dense 1 1/4-inch (305.0120)TON3,470$13.50$13.50$22.75$13.50
13Breaker run (311.0110)TON2,700$12.50$12.50$22.50$12.50
14Concrete pavement approach slab (415.0410)SY195$215.00$215.00$216.00$259.79
15Tack coat (455.0605)GAL150$7.45$3.10$3.10$3.10
16Asphaltic surface (465.0105)TON780$86.45$93.70$99.10$93.70
17Concrete masonry bridges (502.0100)CY375$800.00$700.00$795.33$995.00
18Protective surface treatment (502.3200)SY535$2.50$5.00$3.69$4.00
19Pigmented surface sealer (502.3210)SY110$2.50$12.00$10.84$13.00
20Prestressed girder type I 36W-inch (503.0137)LF330$300.00$350.00$271.43$250.00
21Bar steel reinforcement HS structures (505.0400)LB6,750$1.45$1.25$1.40$1.25
22Bar steel reinforcement HS coated structures (505.0600)LB47,380$1.55$1.40$1.33$1.50
23Bar steel reinforcement HS stainless structures (505.0800.S)LB1,460$5.00$3.80$3.84$4.25
24Bearing pads elastomeric non- laminated (506.2605)EACH10$125.00$100.00$247.91$150.00
25Steel diaphragms (structure) 01. B- 20-265 (506.4000)EACH4$1,250.00$1,500.00$1,128.85$1,500.00
26Rubberized membrane waterproofing (516.0500)SY18$18.00$35.00$64.32$60.00
27Apron endwalls for culvert pipe 24- inch (520.1024)EACH2$750.00$750.00$400.00$750.00
28Culvert pipe class III-A 24-inch (520.3324)LF46$68.00$68.00$69.00$68.00
29Piling steel HP 10-inch X 42 LB (550.1100)LF1,200$40.00$45.00$32.24$70.00
30Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF26$58.00$58.00$100.00$218.79
31Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF28$58.00$58.00$100.00$206.47
32Concrete surface drains (602.3010)CY1$850.00$850.00$3,000.00$2,116.85
33Riprap light (606.0100)CY150$81.00$81.00$74.00$81.00
34Riprap extra-heavy (606.0400)CY465$81.00$85.00$78.98$90.00
35Pipe underdrain wrapped 6-inch (612.0406)LF220$6.00$6.00$4.26$6.00
36Anchor assemblies for steel plate beam guard (614.0150)EACH4$250.00$200.00$365.69$375.00
37MGS guardrail 3 (614.2300)LF150$27.00$27.00$30.00$30.00
38MGS thrie beam transition (614.2500)LF160$92.00$92.00$95.00$100.00
39MGS guardrail terminal eat (614.2610)EACH4$4,000.00$4,000.00$4,200.00$4,200.00
40Mobilization (619.1000)EACH1$95,967$147,684$109,992$169,500
41Water (624.0100)MGAL90$50.00$50.00$85.00$50.00
42Salvaged topsoil (625.0500)SY5,000$2.70$2.70$3.00$2.70
43Silt fence (628.1504)LF1,100$2.20$2.20$2.05$2.50
44Silt fence maintenance (628.1520)LF3,400$0.01$0.01$0.01$0.25
45Mobilizations erosion control (628.1905)EACH5$420.00$420.00$200.00$110.00
46Mobilizations emergency erosion control (628.1910)EACH4$350.00$350.00$200.00$150.00
47Erosion mat class I type B (628.2004)SY1,300$1.70$1.70$1.25$2.00
48Erosion mat urban class I type B (628.2008)SY3,750$2.29$2.29$1.95$2.10
49Turbidity barriers (628.6005)SY475$46.00$46.00$40.00$40.00
50Temporary ditch checks (628.7504)LF70$8.95$8.95$8.95$8.00
51Culvert pipe checks (628.7555)EACH3$21.30$21.30$20.00$20.00
52Rock bags (628.7570)EACH21$14.00$14.00$12.00$10.00
53Fertilizer type B (629.0210)CWT5$110.00$110.00$85.00$100.00
54Seeding mixture no. 20 (630.0120)LB320$8.75$8.75$7.95$8.00
55Seeding mixture no. 60 (630.0160)LB2$26.00$26.00$100.00$20.00
56Seeding temporary (630.0200)LB190$3.55$3.55$3.50$4.00
57Seed water (630.0500)MGAL150$25.00$25.00$15.00$5.00
58Markers row (633.5100)EACH16$74.00$74.00$75.00$60.00
59Removing signs type II (638.2602)EACH4$25.00$25.00$35.00$20.00
60Removing small sign supports (638.3000)EACH4$25.00$25.00$35.00$20.00
61Field office type B (642.5001)EACH1$3,000.00$3,000.00$1,514.52$6,000.00
62Traffic control barricades type III (643.0420)DAY1,890$0.68$0.68$0.68$0.68
63Traffic control warning lights type A (643.0705)DAY2,940$0.20$0.20$0.20$0.20
64Traffic control signs (643.0900)DAY1,470$0.62$0.62$0.62$0.62
65Traffic control signs PCMS (643.1050)DAY14$45.00$45.00$45.00$45.00
66Traffic control (643.5000)EACH1$2,520.00$2,520.00$2,520.00$2,520.00
67Geotextile type DF schedule A (645.0111)SY90$7.00$7.00$4.71$7.00
68Geotextile type HR (645.0120)SY615$2.50$5.00$5.10$7.78
69Geotextile type R (645.0130)SY535$5.00$5.00$7.00$5.00
70Marking line epoxy 6-inch (646.2020)LF3,200$2.00$2.00$2.10$2.30
71Construction staking subgrade (650.4500)LF730$0.01$0.01$0.01$0.01
72Construction staking base (650.5000)LF645$1.32$1.50$1.50$1.50
73Construction staking curb gutter and curb & gutter (650.5500)LF26$5.50$30.00$30.00$30.00
74Construction staking structure layout (structure) 01. 4812-00-01 (650.6501)EACH1$4,369.96$4,000.00$4,000.00$4,000.00
75Construction staking concrete pavement (650.7000)LF90$5.50$15.00$15.00$15.00
76Construction staking supplemental control (project) 01. 4812-00-01 (650.9911)EACH1$860.39$1,000.00$1,000.00$1,000.00
77Construction staking slope stakes (650.9920)LF730$0.93$1.00$1.00$1.00
78Sawing asphalt (690.0150)LF80$2.95$2.95$2.95$2.95
79Incentive strength concrete structures (715.0502)DOL2,250$1.00$1.00$1.00$1.00
80Installing and maintaining bird deterrent system (station) 01. station 13+21 (999.2000.S)EACH1$0.01$1.00$0.01$2,500.00
81On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00
82On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00
83Special 01. select crushed material for travel corridor (SPV.0195)TON200$40.00$40.00$29.12$45.00
WisDOT contract 20251209019: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy