WisDOT contract 20251209022 bid tabulation

C Manitowoc, South 30th Street; Dewey Street to Viebahn Street (LOC STR, Manitowoc County C Manitowoc, South 30th Street). Let by Wisconsin DOT on December 9, 2025, Manitowoc. 1 bid received; low bid $2,252,676 by Vinton Construction Company.

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
126
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vinton Construction Company$2,252,676Low
WisDOT contract 20251209022: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vinton Construction Company
1Grubbing (201.0205)STA9$400.00
2Removing small pipe culverts (203.0100)EACH1$449.00
3Removing concrete pavement (204.0100)SY13,200$1.60
4Removing curb & gutter (204.0150)LF26$10.00
5Removing concrete sidewalk (204.0155)SY1,770$6.61
6Removing delineators and markers (204.0180)EACH6$30.00
7Removing manholes (204.0210)EACH3$310.00
8Removing inlets (204.0220)EACH9$258.00
9Removing storm sewer (size) 01. 8- inch (204.0245)LF9$15.00
10Removing storm sewer (size) 02. 12-inch (204.0245)LF119$13.15
11Removing storm sewer (size) 03. 15-inch (204.0245)LF692$14.50
12Removing storm sewer (size) 04. 18-inch (204.0245)LF32$14.50
13Removing storm sewer (size) 05. 21-inch (204.0245)LF24$21.20
14Removing storm sewer (size) 06. 24-inch (204.0245)LF24$21.20
15Removing (item description) 01. bollard base (204.9060.S)EACH2$350.00
16Excavation common (205.0100)CY12,335$19.91
17Finishing roadway (project) 01. 4991-06-77 (213.0100)EACH1$5,000.00
18Base aggregate dense 1 1/4-inch (305.0120)TON7,050$15.00
19Base aggregate open-graded (310.0115)CY18$55.00
20Select crushed material (312.0110)TON7,000$14.75
21Concrete pavement 9-inch (415.0090)SY10,420$55.13
22Concrete pavement gaps (415.0210)EACH4$1,000.00
23Concrete pavement hes 9-inch (415.1090)SY1,920$59.13
24Concrete pavement joint filling (415.4100)SY13,460$2.00
25Drilled tie bars (416.0610)EACH8$9.00
26Drilled dowel bars (416.0620)EACH18$16.50
27Asphaltic surface (465.0105)TON20$246.00
28Asphaltic surface driveways and field entrances (465.0120)TON50$246.00
29Asphaltic surface temporary (465.0125)TON30$362.00
30Concrete collars for pipe (520.8000)EACH9$790.00
31Concrete curb & gutter 18-inch type A (601.0405)LF386$38.00
32Concrete curb & gutter 18-inch type D (601.0407)LF22$46.00
33Concrete curb & gutter 30-inch type D (601.0411)LF30$65.00
34Concrete curb & gutter integral 30- inch type D (601.0452)LF4,255$25.00
35Concrete sidewalk 5-inch (602.0410)SF15,430$6.25
36Concrete sidewalk 6-inch (602.0415)SF910$8.05
37Curb ramp detectable warning field yellow (602.0505)SF168$35.00
38Concrete driveway 8-inch (602.0820)SY850$79.00
39Concrete driveway hes 8-inch (602.0870)SY370$82.50
40Concrete surface drains (602.3010)CY1$800.00
41Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF39$105.80
42Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF16$154.35
43Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF685$107.75
44Storm sewer pipe reinforced concrete class III 21-inch (608.0321)LF28$148.60
45Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF24$177.15
46Storm sewer pipe class III-A 18- inch (608.3018)LF8$115.00
47Reconstructing manholes (611.0420)EACH3$3,115.00
48Manhole covers type J-special (611.0535)EACH4$535.00
49Inlet covers type C (611.0612)EACH1$540.00
50Inlet covers type DW (611.0613)EACH1$753.00
51Inlet covers type H (611.0624)EACH5$742.00
52Inlet covers type H-S (611.0639)EACH3$742.00
53Inlet covers type Z (611.0666)EACH1$750.00
54Catch basins 3-FT diameter (611.1003)EACH1$3,929.00
55Catch basins 5-FT diameter (611.1005)EACH1$6,208.00
56Catch basins 2X3-FT (611.1230)EACH9$3,332.00
57Manholes 4-FT diameter (611.2004)EACH1$4,060.00
58Manholes 5-FT diameter (611.2005)EACH2$6,266.00
59Pipe underdrain 6-inch (612.0106)LF450$20.70
60Mobilization (619.1000)EACH1$172,500
61Dust control surface treatment (623.0200)SY22,480$0.01
62Water (624.0100)MGAL80$0.01
63Topsoil (625.0100)SY8,700$8.19
64Mobilizations erosion control (628.1905)EACH6$200.00
65Mobilizations emergency erosion control (628.1910)EACH4$100.00
66Erosion mat class I type B (628.2004)SY10$2.00
67Erosion mat urban class I type A (628.2006)SY8,700$1.70
68Inlet protection type A (628.7005)EACH16$10.00
69Inlet protection type B (628.7010)EACH6$68.00
70Inlet protection type C (628.7015)EACH6$70.00
71Inlet protection type D (628.7020)EACH4$135.00
72Fertilizer type B (629.0210)CWT6$100.00
73Seeding mixture no. 40 (630.0140)LB400$7.85
74Seed water (630.0500)MGAL200$5.00
75Posts tubular steel 2X2-inch X 11- FT (634.0811)EACH10$210.00
76Posts tubular steel 2X2-inch X 12- FT (634.0812)EACH3$215.00
77Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH10$225.00
78Signs type II reflective H (637.2210)SF72.68$22.20
79Signs type II reflective F (637.2230)SF82.50$23.40
80Moving signs type II (638.2102)EACH2$75.00
81Removing signs type II (638.2602)EACH36$35.00
82Removing small sign supports (638.3000)EACH24$35.00
83Field office type B (642.5001)EACH1$9,500.00
84Traffic control drums (643.0300)DAY16,990$0.15
85Traffic control barricades type III (643.0420)DAY1,624$0.50
86Traffic control warning lights type A (643.0705)DAY2,852$0.12
87Traffic control signs (643.0900)DAY2,272$0.20
88Traffic control signs PCMS (643.1050)DAY14$15.00
89Temporary marking crosswalk removable tape 6-inch (643.3350)LF140$2.10
90Traffic control (643.5000)EACH1$17,900
91Temporary pedestrian surface matting (644.1440)SF910$2.45
92Temporary pedestrian curb ramp (644.1601)DAY180$5.00
93Temporary pedestrian detectable warning field (644.1605)SF40$6.05
94Temporary pedestrian barricade (644.1810)LF570$6.45
95Geotextile type DF schedule A (645.0111)SY207$4.80
96Geotextile type sas (645.0140)SY2,950$2.00
97Marking line epoxy 4-inch (646.1020)LF12,820$0.37
98Marking line epoxy 8-inch (646.3020)LF100$1.00
99Marking arrow epoxy (646.5020)EACH12$414.20
100Marking word epoxy (646.5120)EACH6$419.10
101Marking symbol epoxy (646.5220)EACH10$402.32
102Marking stop line epoxy 18-inch (646.6120)LF60$17.35
103Marking crosswalk epoxy block style 24-inch (646.7520)LF408$28.48
104Marking parking stall paint (646.8305)LF400$5.00
105Construction staking storm sewer (650.4000)EACH14$43.83
106Construction staking subgrade (650.4500)LF2,517$0.01
107Construction staking concrete pavement (650.7000)LF2,520$1.29
108Construction staking curb ramps (650.9000)EACH13$93.05
109Construction staking sidewalk (project) 01. 4991-06-77 (650.9500)EACH1$2,254.92
110Construction staking supplemental control (project) 01. 4991-06-77 (650.9911)EACH1$446.98
111Construction staking slope stakes (650.9920)LF2,517$0.90
112Sawing asphalt (690.0150)LF610$3.00
113Sawing concrete (690.0250)LF2,430$3.00
114Incentive compressive strength concrete pavement (715.0720)DOL3,495$1.00
115Incentive iri ride (740.0440)DOL1,910$1.00
116On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00
117On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,320$5.00
118Special 01. rectangular rapid flashing beacon (RRFB) system (SPV.0060)EACH5$7,625.00
119Special 02. remove and replace sanitary manhole casting (SPV.0060)EACH1$985.00
120Special 03. adjusting sanitary manhole covers (SPV.0060)EACH1$590.00
121Special 04. reconstructing sanitary manhole (SPV.0060)EACH2$7,900.00
122Special 01. storm sewer PVC 8- inch (SPV.0090)LF8$88.60
123Special 02. storm sewer PVC 12- inch (SPV.0090)LF8$122.40
124Special 03. storm sewer PVC 15- inch (SPV.0090)LF8$118.80
125Special 04. storm sewer PVC 18- inch (SPV.0090)LF8$144.40
126Special 05. concrete curb & gutter integral 30-inch type D hes (SPV.0090)LF787$26.50
WisDOT contract 20251209022: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy