| 1 | Grubbing (201.0205) | STA | 9 | $400.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 1 | $449.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 13,200 | $1.60 |
| 4 | Removing curb & gutter (204.0150) | LF | 26 | $10.00 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 1,770 | $6.61 |
| 6 | Removing delineators and markers (204.0180) | EACH | 6 | $30.00 |
| 7 | Removing manholes (204.0210) | EACH | 3 | $310.00 |
| 8 | Removing inlets (204.0220) | EACH | 9 | $258.00 |
| 9 | Removing storm sewer (size) 01. 8- inch (204.0245) | LF | 9 | $15.00 |
| 10 | Removing storm sewer (size) 02. 12-inch (204.0245) | LF | 119 | $13.15 |
| 11 | Removing storm sewer (size) 03. 15-inch (204.0245) | LF | 692 | $14.50 |
| 12 | Removing storm sewer (size) 04. 18-inch (204.0245) | LF | 32 | $14.50 |
| 13 | Removing storm sewer (size) 05. 21-inch (204.0245) | LF | 24 | $21.20 |
| 14 | Removing storm sewer (size) 06. 24-inch (204.0245) | LF | 24 | $21.20 |
| 15 | Removing (item description) 01. bollard base (204.9060.S) | EACH | 2 | $350.00 |
| 16 | Excavation common (205.0100) | CY | 12,335 | $19.91 |
| 17 | Finishing roadway (project) 01. 4991-06-77 (213.0100) | EACH | 1 | $5,000.00 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 7,050 | $15.00 |
| 19 | Base aggregate open-graded (310.0115) | CY | 18 | $55.00 |
| 20 | Select crushed material (312.0110) | TON | 7,000 | $14.75 |
| 21 | Concrete pavement 9-inch (415.0090) | SY | 10,420 | $55.13 |
| 22 | Concrete pavement gaps (415.0210) | EACH | 4 | $1,000.00 |
| 23 | Concrete pavement hes 9-inch (415.1090) | SY | 1,920 | $59.13 |
| 24 | Concrete pavement joint filling (415.4100) | SY | 13,460 | $2.00 |
| 25 | Drilled tie bars (416.0610) | EACH | 8 | $9.00 |
| 26 | Drilled dowel bars (416.0620) | EACH | 18 | $16.50 |
| 27 | Asphaltic surface (465.0105) | TON | 20 | $246.00 |
| 28 | Asphaltic surface driveways and field entrances (465.0120) | TON | 50 | $246.00 |
| 29 | Asphaltic surface temporary (465.0125) | TON | 30 | $362.00 |
| 30 | Concrete collars for pipe (520.8000) | EACH | 9 | $790.00 |
| 31 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 386 | $38.00 |
| 32 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 22 | $46.00 |
| 33 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 30 | $65.00 |
| 34 | Concrete curb & gutter integral 30- inch type D (601.0452) | LF | 4,255 | $25.00 |
| 35 | Concrete sidewalk 5-inch (602.0410) | SF | 15,430 | $6.25 |
| 36 | Concrete sidewalk 6-inch (602.0415) | SF | 910 | $8.05 |
| 37 | Curb ramp detectable warning field yellow (602.0505) | SF | 168 | $35.00 |
| 38 | Concrete driveway 8-inch (602.0820) | SY | 850 | $79.00 |
| 39 | Concrete driveway hes 8-inch (602.0870) | SY | 370 | $82.50 |
| 40 | Concrete surface drains (602.3010) | CY | 1 | $800.00 |
| 41 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 39 | $105.80 |
| 42 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 16 | $154.35 |
| 43 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 685 | $107.75 |
| 44 | Storm sewer pipe reinforced concrete class III 21-inch (608.0321) | LF | 28 | $148.60 |
| 45 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 24 | $177.15 |
| 46 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 8 | $115.00 |
| 47 | Reconstructing manholes (611.0420) | EACH | 3 | $3,115.00 |
| 48 | Manhole covers type J-special (611.0535) | EACH | 4 | $535.00 |
| 49 | Inlet covers type C (611.0612) | EACH | 1 | $540.00 |
| 50 | Inlet covers type DW (611.0613) | EACH | 1 | $753.00 |
| 51 | Inlet covers type H (611.0624) | EACH | 5 | $742.00 |
| 52 | Inlet covers type H-S (611.0639) | EACH | 3 | $742.00 |
| 53 | Inlet covers type Z (611.0666) | EACH | 1 | $750.00 |
| 54 | Catch basins 3-FT diameter (611.1003) | EACH | 1 | $3,929.00 |
| 55 | Catch basins 5-FT diameter (611.1005) | EACH | 1 | $6,208.00 |
| 56 | Catch basins 2X3-FT (611.1230) | EACH | 9 | $3,332.00 |
| 57 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $4,060.00 |
| 58 | Manholes 5-FT diameter (611.2005) | EACH | 2 | $6,266.00 |
| 59 | Pipe underdrain 6-inch (612.0106) | LF | 450 | $20.70 |
| 60 | Mobilization (619.1000) | EACH | 1 | $172,500 |
| 61 | Dust control surface treatment (623.0200) | SY | 22,480 | $0.01 |
| 62 | Water (624.0100) | MGAL | 80 | $0.01 |
| 63 | Topsoil (625.0100) | SY | 8,700 | $8.19 |
| 64 | Mobilizations erosion control (628.1905) | EACH | 6 | $200.00 |
| 65 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $100.00 |
| 66 | Erosion mat class I type B (628.2004) | SY | 10 | $2.00 |
| 67 | Erosion mat urban class I type A (628.2006) | SY | 8,700 | $1.70 |
| 68 | Inlet protection type A (628.7005) | EACH | 16 | $10.00 |
| 69 | Inlet protection type B (628.7010) | EACH | 6 | $68.00 |
| 70 | Inlet protection type C (628.7015) | EACH | 6 | $70.00 |
| 71 | Inlet protection type D (628.7020) | EACH | 4 | $135.00 |
| 72 | Fertilizer type B (629.0210) | CWT | 6 | $100.00 |
| 73 | Seeding mixture no. 40 (630.0140) | LB | 400 | $7.85 |
| 74 | Seed water (630.0500) | MGAL | 200 | $5.00 |
| 75 | Posts tubular steel 2X2-inch X 11- FT (634.0811) | EACH | 10 | $210.00 |
| 76 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 3 | $215.00 |
| 77 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 10 | $225.00 |
| 78 | Signs type II reflective H (637.2210) | SF | 72.68 | $22.20 |
| 79 | Signs type II reflective F (637.2230) | SF | 82.50 | $23.40 |
| 80 | Moving signs type II (638.2102) | EACH | 2 | $75.00 |
| 81 | Removing signs type II (638.2602) | EACH | 36 | $35.00 |
| 82 | Removing small sign supports (638.3000) | EACH | 24 | $35.00 |
| 83 | Field office type B (642.5001) | EACH | 1 | $9,500.00 |
| 84 | Traffic control drums (643.0300) | DAY | 16,990 | $0.15 |
| 85 | Traffic control barricades type III (643.0420) | DAY | 1,624 | $0.50 |
| 86 | Traffic control warning lights type A (643.0705) | DAY | 2,852 | $0.12 |
| 87 | Traffic control signs (643.0900) | DAY | 2,272 | $0.20 |
| 88 | Traffic control signs PCMS (643.1050) | DAY | 14 | $15.00 |
| 89 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 140 | $2.10 |
| 90 | Traffic control (643.5000) | EACH | 1 | $17,900 |
| 91 | Temporary pedestrian surface matting (644.1440) | SF | 910 | $2.45 |
| 92 | Temporary pedestrian curb ramp (644.1601) | DAY | 180 | $5.00 |
| 93 | Temporary pedestrian detectable warning field (644.1605) | SF | 40 | $6.05 |
| 94 | Temporary pedestrian barricade (644.1810) | LF | 570 | $6.45 |
| 95 | Geotextile type DF schedule A (645.0111) | SY | 207 | $4.80 |
| 96 | Geotextile type sas (645.0140) | SY | 2,950 | $2.00 |
| 97 | Marking line epoxy 4-inch (646.1020) | LF | 12,820 | $0.37 |
| 98 | Marking line epoxy 8-inch (646.3020) | LF | 100 | $1.00 |
| 99 | Marking arrow epoxy (646.5020) | EACH | 12 | $414.20 |
| 100 | Marking word epoxy (646.5120) | EACH | 6 | $419.10 |
| 101 | Marking symbol epoxy (646.5220) | EACH | 10 | $402.32 |
| 102 | Marking stop line epoxy 18-inch (646.6120) | LF | 60 | $17.35 |
| 103 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 408 | $28.48 |
| 104 | Marking parking stall paint (646.8305) | LF | 400 | $5.00 |
| 105 | Construction staking storm sewer (650.4000) | EACH | 14 | $43.83 |
| 106 | Construction staking subgrade (650.4500) | LF | 2,517 | $0.01 |
| 107 | Construction staking concrete pavement (650.7000) | LF | 2,520 | $1.29 |
| 108 | Construction staking curb ramps (650.9000) | EACH | 13 | $93.05 |
| 109 | Construction staking sidewalk (project) 01. 4991-06-77 (650.9500) | EACH | 1 | $2,254.92 |
| 110 | Construction staking supplemental control (project) 01. 4991-06-77 (650.9911) | EACH | 1 | $446.98 |
| 111 | Construction staking slope stakes (650.9920) | LF | 2,517 | $0.90 |
| 112 | Sawing asphalt (690.0150) | LF | 610 | $3.00 |
| 113 | Sawing concrete (690.0250) | LF | 2,430 | $3.00 |
| 114 | Incentive compressive strength concrete pavement (715.0720) | DOL | 3,495 | $1.00 |
| 115 | Incentive iri ride (740.0440) | DOL | 1,910 | $1.00 |
| 116 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 |
| 117 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 |
| 118 | Special 01. rectangular rapid flashing beacon (RRFB) system (SPV.0060) | EACH | 5 | $7,625.00 |
| 119 | Special 02. remove and replace sanitary manhole casting (SPV.0060) | EACH | 1 | $985.00 |
| 120 | Special 03. adjusting sanitary manhole covers (SPV.0060) | EACH | 1 | $590.00 |
| 121 | Special 04. reconstructing sanitary manhole (SPV.0060) | EACH | 2 | $7,900.00 |
| 122 | Special 01. storm sewer PVC 8- inch (SPV.0090) | LF | 8 | $88.60 |
| 123 | Special 02. storm sewer PVC 12- inch (SPV.0090) | LF | 8 | $122.40 |
| 124 | Special 03. storm sewer PVC 15- inch (SPV.0090) | LF | 8 | $118.80 |
| 125 | Special 04. storm sewer PVC 18- inch (SPV.0090) | LF | 8 | $144.40 |
| 126 | Special 05. concrete curb & gutter integral 30-inch type D hes (SPV.0090) | LF | 787 | $26.50 |