| 1 | Removing asphaltic surface (204.0110) | SY | 190 | $9.00 | $5.00 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 520 | $13.17 | $20.00 |
| 3 | Removing asphaltic surface milling (204.0120) | SY | 24,900 | $2.77 | $3.95 |
| 4 | Removing curb (204.0130) | LF | 70 | $9.75 | $28.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 600 | $9.75 | $32.50 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 350 | $14.25 | $88.15 |
| 7 | Excavation common (205.0100) | CY | 17 | $54.00 | $150.00 |
| 8 | Prepare foundation for asphaltic paving (project) 01. 1175-18-76 (211.0101) | EACH | 1 | $13,000 | $2,500.00 |
| 9 | Finishing roadway (project) 01. 1175-18-76 (213.0100) | EACH | 1 | $2,500.00 | $5,000.00 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 40 | $52.00 | $85.95 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 35 | $52.00 | $18.25 |
| 12 | Stamping colored concrete (405.1000) | CY | 4 | $323.74 | $350.00 |
| 13 | HMA cold weather paving (450.4000) | TON | 620 | $0.50 | $3.00 |
| 14 | Tack coat (455.0605) | GAL | 1,910 | $5.04 | $4.10 |
| 15 | Incentive density HMA pavement (460.2000) | DOL | 1,590 | $1.00 | $1.00 |
| 16 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 2,480 | $106.25 | $91.55 |
| 17 | Asphaltic surface patching (465.0110) | TON | 100 | $249.46 | $140.00 |
| 18 | Asphaltic curb (465.0310) | LF | 25 | $23.62 | $5.00 |
| 19 | Asphaltic flumes (465.0315) | SY | 8 | $62.19 | $20.00 |
| 20 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 600 | $68.41 | $54.00 |
| 21 | Concrete curb pedestrian (601.0600) | LF | 92 | $50.77 | $48.00 |
| 22 | Concrete sidewalk 6-inch (602.0415) | SF | 3,380 | $18.77 | $10.30 |
| 23 | Curb ramp detectable warning field natural patina (602.0515) | SF | 140 | $63.14 | $59.50 |
| 24 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 84 | $68.52 | $62.75 |
| 25 | Riprap light (606.0100) | CY | 2 | $225.00 | $250.00 |
| 26 | Adjusting manhole covers (611.8110) | EACH | 11 | $975.00 | $750.00 |
| 27 | Adjusting inlet covers (611.8115) | EACH | 3 | $560.00 | $750.00 |
| 28 | Maintenance and repair of haul roads (project) 01. 1175-18-76 (618.0100) | EACH | 1 | $100.00 | $1.00 |
| 29 | Mobilization (619.1000) | EACH | 1 | $55,750 | $126,550 |
| 30 | Water (624.0100) | MGAL | 101 | $1.00 | $45.00 |
| 31 | Topsoil (625.0100) | SY | 220 | $9.95 | $6.00 |
| 32 | Mobilizations erosion control (628.1905) | EACH | 4 | $420.00 | $420.00 |
| 33 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $350.00 | $350.00 |
| 34 | Erosion mat urban class I type A (628.2006) | SY | 220 | $2.19 | $2.19 |
| 35 | Inlet protection type C (628.7015) | EACH | 68 | $72.00 | $72.00 |
| 36 | Fertilizer type B (629.0210) | CWT | 0.18 | $110.00 | $110.00 |
| 37 | Seeding mixture no. 40 (630.0140) | LB | 12 | $13.80 | $13.80 |
| 38 | Seed water (630.0500) | MGAL | 4 | $25.00 | $25.00 |
| 39 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 1 | $129.00 | $129.00 |
| 40 | Posts tubular steel 2X2-inch X 18- FT (634.0818) | EACH | 7 | $285.00 | $285.00 |
| 41 | Moving signs type II (638.2102) | EACH | 15 | $119.00 | $119.00 |
| 42 | Removing small sign supports (638.3000) | EACH | 8 | $34.30 | $34.30 |
| 43 | Field office type B (642.5001) | EACH | 1 | $10,000 | $8,500.00 |
| 44 | Traffic control drums (643.0300) | DAY | 3,770 | $1.01 | $1.00 |
| 45 | Traffic control signs (643.0900) | DAY | 6,410 | $1.16 | $1.15 |
| 46 | Traffic control signs fixed message (643.1000) | SF | 36 | $11.01 | $10.90 |
| 47 | Temporary marking line paint 6- inch (643.3165) | LF | 28,666 | $0.43 | $0.35 |
| 48 | Temporary marking line removable tape 6-inch (643.3180) | LF | 1,148 | $1.71 | $1.69 |
| 49 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 194 | $1.71 | $1.69 |
| 50 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 1,132 | $2.93 | $2.90 |
| 51 | Traffic control (643.5000) | EACH | 1 | $1,873.55 | $1,855.00 |
| 52 | Temporary pedestrian surface plate (644.1430) | SF | 56 | $11.52 | $20.00 |
| 53 | Temporary pedestrian surface matting (644.1440) | SF | 72 | $5.05 | $5.00 |
| 54 | Temporary pedestrian curb ramp (644.1601) | DAY | 40 | $4.04 | $4.00 |
| 55 | Temporary pedestrian detectable warning field (644.1605) | SF | 32 | $4.04 | $4.00 |
| 56 | Temporary pedestrian barricade (644.1810) | LF | 562 | $5.05 | $5.00 |
| 57 | Geotextile type R (645.0130) | SY | 8 | $10.00 | $10.00 |
| 58 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 18,110 | $2.25 | $1.75 |
| 59 | Marking stop line epoxy 18-inch (646.6120) | LF | 168 | $19.00 | $19.84 |
| 60 | Cold weather marking epoxy 6-inch (646.6466) | LF | 5,298 | $0.55 | $0.58 |
| 61 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,415 | $14.00 | $18.84 |
| 62 | Marking curb epoxy (646.8120) | LF | 363 | $14.00 | $9.50 |
| 63 | Marking parking stall epoxy (646.8320) | LF | 236 | $25.00 | $23.64 |
| 64 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 600 | $1.75 | $1.75 |
| 65 | Construction staking resurfacing reference (650.8000) | LF | 5,298 | $0.22 | $0.22 |
| 66 | Construction staking curb ramps (650.9000) | EACH | 18 | $275.00 | $275.00 |
| 67 | Construction staking supplemental control (project) 01. 1175-18-76 (650.9911) | EACH | 1 | $2,500.00 | $2,500.00 |
| 68 | Adjusting pull boxes (653.0900) | EACH | 1 | $350.00 | $800.00 |
| 69 | Sawing asphalt (690.0150) | LF | 840 | $6.11 | $2.00 |
| 70 | Sawing concrete (690.0250) | LF | 290 | $7.65 | $3.00 |
| 71 | Incentive iri ride (740.0440) | DOL | 4,014 | $1.00 | $1.00 |
| 72 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 |
| 73 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 74 | Special 01. repairing storm sewer structures (SPV.0060) | EACH | 2 | $1,600.00 | $3,000.00 |
| 75 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 189 | $20.18 | $22.90 |