WisDOT contract 20251209028 bid tabulation

Stevens Point - Waupaca; Anderson Road to Appletree Lane Wb (USH 010, Waupaca County Stevens Point - Waupaca). Let by Wisconsin DOT on December 9, 2025, Waupaca. 5 bids received; low bid $4,395,023 by Chippewa Concrete Services, Inc..

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
161
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Chippewa Concrete Services, Inc.$4,395,023Low
2Zignego Company, Inc.$4,644,674+6.0%
3Sommers Construction Co., Inc.$4,868,811+11%
4Vinton Construction Company$4,880,459+11%
5Michels Road & Stone, Inc.$5,623,885+28%
WisDOT contract 20251209028: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Chippewa Concrete Services, Inc.2. Zignego Company, Inc.3. Sommers Construction Co., Inc.4. Vinton Construction Company5. Michels Road & Stone, Inc.
1Removing structure (structure) 01. B-68-0019 (203.0220)EACH1$20,220$10,000$10,000$10,000$10,000
2Removing structure (structure) 02. B-68-0073 (203.0220)EACH1$30,330$20,000$20,000$20,000$20,000
3Removing concrete pavement (204.0100)SY4,092$10.46$18.50$14.00$10.95$23.00
4Removing asphaltic surface (204.0110)SY33,966$3.21$3.25$3.25$3.25$3.25
5Removing asphaltic surface milling (204.0120)SY829$4.04$4.25$4.25$4.25$4.25
6Removing curb & gutter (204.0150)LF1,455$9.10$15.00$11.00$9.69$11.00
7Removing concrete sidewalk (204.0155)SY165$8.59$20.00$25.00$20.00$10.00
8Removing guardrail (204.0165)LF2,603$2.02$3.00$3.00$2.00$2.00
9Removing delineators and markers (204.0180)EACH129$10.11$25.00$25.00$10.00$10.00
10Removing surface drains (204.0190)EACH4$657.15$1,000.00$750.00$500.00$400.00
11Excavation for structures bridges (structure) 01. B-68-0019 (206.1001)EACH1$3,033.00$5,000.00$5,000.00$5,000.00$5,000.00
12Excavation for structures bridges (structure) 02. B-68-0073 (206.1001)EACH1$4,044.00$10,000$10,000$10,000$10,000
13Backfill structure type A (210.1500)TON46$151.65$32.00$50.00$50.00$50.00
14Prepare foundation for asphaltic shoulders (211.0400)STA617$47.47$2.00$2.00$2.00$2.00
15Finishing roadway (project) 01. 1510-01-61 (213.0100)EACH1$5,055.00$1,000.00$4,500.00$5,000.00$5,000.00
16Base aggregate dense 3/4-inch (305.0110)TON1,504$24.72$31.00$29.70$38.51$37.00
17Base aggregate dense 1 1/4-inch (305.0120)TON107$31.29$50.00$45.00$48.51$28.00
18Concrete pavement 6-inch (415.0060)SY190$142.63$100.00$88.00$95.00$175.00
19Concrete pavement 10-inch (415.0100)SY4,002$81.27$74.26$84.45$75.98$83.00
20Concrete pavement approach slab (415.0410)SY223$327.85$240.00$325.00$245.00$275.00
21Rout and seal (415.6000.S)LF63,823$0.87$0.86$0.86$0.95$0.86
22Drilled tie bars (416.0610)EACH3,446$8.09$15.00$8.45$8.75$7.00
23Drilled dowel bars (416.0620)EACH9,556$15.17$30.00$14.70$15.75$17.00
24Concrete pavement repair (416.1710)SY4,700$97.06$87.26$101.97$113.24$102.00
25Concrete pavement replacement (416.1720)SY7,500$97.06$87.26$101.97$117.24$103.00
26Continuous diamond grinding concrete pavement (420.1000)SY20,500$6.57$6.50$6.00$6.00$6.50
27HMA cold weather paving (450.4000)TON173$0.01$8.10$8.10$8.10$8.10
28Tack coat (455.0605)GAL50$10.01$15.00$15.00$15.00$15.00
29Incentive density HMA pavement (460.2000)DOL5,350$1.00$1.00$1.00$1.00$1.00
30HMA pavement 4 LT 58-28 S (460.5224)TON8,115$80.98$79.10$79.10$79.10$79.10
31Asphaltic surface (465.0105)TON4$339.70$235.00$235.00$235.00$235.00
32Asphaltic surface safety islands (465.0305)TON20$339.70$235.00$235.00$235.00$235.00
33Asphaltic flumes (465.0315)SY59$69.51$75.00$75.00$75.00$75.00
34Asphaltic rumble strips, shoulder divided roadway (465.0510)LF26,476$0.31$0.31$0.25$0.28$0.28
35Concrete masonry bridges (502.0100)CY15$1,516.50$1,250.00$1,250.00$1,250.00$1,250.00
36Expansion device (502.3101)LF3$1,011.00$1,250.00$1,250.00$1,250.00$1,250.00
37Protective surface treatment (502.3200)SY2$31.34$2.00$2.00$2.00$2.00
38Pigmented surface sealer (502.3210)SY16$32.35$5.00$5.00$5.00$5.00
39Adhesive anchors no. 5 bar (502.4205)EACH19$42.46$30.00$30.00$30.00$30.00
40Adhesive anchors no. 6 bar (502.4206)EACH32$45.50$35.00$35.00$35.00$35.00
41Bar steel reinforcement HS coated structures (505.0600)LB2,080$4.04$5.00$5.00$5.00$5.00
42Preparation decks type 1 (509.0301)SY5$303.30$500.00$500.00$500.00$500.00
43Preparation decks type 2 (509.0302)SY2$404.40$750.00$750.00$750.00$750.00
44Sawing pavement deck preparation areas (509.0310.S)LF50$15.17$5.00$5.00$5.00$5.00
45Concrete surface repair (509.1500)SF335$202.20$215.00$215.00$215.00$215.00
46Concrete masonry deck repair (509.2100.S)CY1$1,819.80$750.00$750.00$750.00$750.00
47Polymer overlay (509.5100.S)SY5$429.35$136.00$136.00$136.00$424.68
48Removing polymer overlay (structure) 01. B-68-0077 (509.9015.S)SY5$335.35$136.00$136.00$136.00$331.70
49Temporary shoring (structure) 01. B-68-0019 (511.1200)SF70$126.38$45.00$45.00$45.00$45.00
50Temporary shoring (structure) 02. B-68-0073 (511.1200)SF240$126.38$45.00$45.00$45.00$45.00
51Rubberized membrane waterproofing (516.0500)SY7$101.10$25.00$25.00$25.00$25.00
52Cleaning culvert pipes (520.8700)EACH6$842.16$2,000.00$2,000.00$833.00$833.00
53Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH2$495.39$375.00$375.00$490.00$2,000.00
54Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH1$2,810.58$1,550.00$1,550.00$2,500.00$4,500.00
55Culvert pipe corrugated polyethylene 12-inch (530.0112)LF112$100.14$78.50$78.50$135.60$107.00
56Concrete curb & gutter 18-inch type A (601.0405)LF75$49.09$100.00$88.00$55.00$35.00
57Concrete curb & gutter 30-inch type A (601.0409)LF1,270$48.01$45.00$88.00$60.00$41.00
58Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413)LF55$51.67$100.00$88.00$60.00$42.00
59Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF90$53.31$100.00$88.00$60.00$43.00
60Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF10$53.31$100.00$88.00$60.00$43.00
61Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF69$53.31$100.00$88.00$60.00$43.00
62Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF87$53.31$100.00$88.00$60.00$42.00
63Concrete curb pedestrian (601.0600)LF8$59.89$100.00$88.00$50.00$52.00
64Concrete sidewalk 4-inch (602.0405)SF2,093$13.82$10.00$8.25$12.70$11.00
65Curb ramp detectable warning field yellow (602.0505)SF108$63.20$50.00$35.00$35.00$38.00
66Curb ramp detectable warning field radial yellow (602.0605)SF60$68.59$100.00$68.00$58.00$55.00
67Concrete surface drains (602.3010)CY3.40$1,365.11$1,000.00$1,800.00$1,000.00$1,700.00
68Concrete rumble strips, shoulder divided roadway (602.3210)LF16,406$0.86$0.85$1.00$0.68$0.68
69Concrete barrier temporary precast delivered (603.8000)LF4,275$14.63$7.50$7.50$7.50$7.50
70Concrete barrier temporary precast installed (603.8125)LF4,275$4.67$4.50$4.50$4.50$4.50
71Riprap medium (606.0200)CY61$151.65$115.00$115.00$174.00$190.00
72Inlet covers type V (611.0654)EACH2$758.25$1,135.50$1,135.50$721.00$1,000.00
73Inlets 2X2-FT (611.3220)EACH2$2,603.33$2,635.58$2,635.58$4,230.00$4,800.00
74Adjusting inlet covers (611.8115)EACH20$530.78$1,250.00$1,250.00$530.00$550.00
75Pipe underdrain wrapped 6-inch (612.0406)LF60$25.28$12.50$6.00$6.00$6.00
76Barrier system grading shaping finishing (614.0010)EACH7$4,198.68$5,141.00$5,141.00$5,833.00$2,933.00
77Anchor assemblies for steel plate beam guard (614.0150)EACH3$404.40$175.00$175.00$175.00$175.00
78Crash cushions temporary (614.0905)EACH4$4,802.25$8,000.00$3,750.00$5,000.00$3,750.00
79Replacing guardrail posts and blocks (614.0950)EACH18$114.24$250.00$250.00$113.00$113.00
80MGS guardrail 3 (614.2300)LF2,125$26.32$28.00$28.00$26.03$26.03
81MGS guardrail 3 K (614.2330)LF50$50.55$40.00$40.00$50.00$50.00
82MGS thrie beam transition (614.2500)LF165.80$92.00$92.00$92.00$91.00$91.00
83MGS guardrail terminal eat (614.2610)EACH6$3,369.66$4,850.00$4,850.00$3,333.00$3,333.00
84MGS guardrail terminal type 2 (614.2620)EACH3$2,884.38$3,000.00$3,000.00$2,853.00$2,853.00
85Maintenance and repair of haul roads (project) 01. 1510-01-61 (618.0100)EACH1$1,213.20$1.00$0.01$0.01$1.00
86Mobilization (619.1000)EACH1$264,326$512,000$600,206$625,000$395,768
87Topsoil (625.0100)SY415$9.60$8.25$8.25$15.00$8.00
88Silt fence (628.1504)LF3,680$1.77$2.00$2.00$1.75$1.75
89Silt fence maintenance (628.1520)LF7,360$0.03$0.01$0.01$0.03$0.03
90Mobilizations erosion control (628.1905)EACH5$195.12$500.00$500.00$193.00$193.00
91Mobilizations emergency erosion control (628.1910)EACH2$397.32$0.01$0.01$393.00$393.00
92Erosion mat urban class I type B (628.2008)SY415$4.04$4.00$4.00$4.00$4.00
93Inlet protection type C (628.7015)EACH40$50.55$75.00$75.00$50.00$50.00
94Temporary ditch checks (628.7504)LF40$8.09$10.00$10.00$8.00$8.00
95Culvert pipe checks (628.7555)EACH12$25.28$12.00$12.00$25.00$25.00
96Rock bags (628.7570)EACH300$6.07$12.00$12.00$6.00$6.00
97Fertilizer type B (629.0210)CWT0.40$202.20$500.00$500.00$200.00$200.00
98Seeding mixture no. 30 (630.0130)LB20$15.17$22.00$22.00$15.00$15.00
99Seed water (630.0500)MGAL11$75.83$150.00$150.00$75.00$75.00
100Delineator posts steel (633.0100)EACH129$33.36$65.00$65.00$33.00$33.00
101Delineator reflectors (633.0500)EACH129$15.17$15.00$15.00$15.00$15.00
102Markers culvert end (633.5200)EACH2$75.83$85.00$85.00$75.00$75.00
103Moving signs type II (638.2102)EACH5$101.10$250.00$250.00$100.00$100.00
104Moving small sign supports (638.4000)EACH5$101.10$50.00$50.00$100.00$100.00
105Field office type C (642.5201)EACH1$7,582.50$20,000$8,500.00$10,000$16,500
106Traffic control drums (643.0300)DAY77,500$0.61$0.60$0.13$0.60$13.00
107Digital speed reduction system (DSRS) (643.0370.S)DAY125$96.05$95.00$87.25$95.00$87.25
108Traffic control barricades type III (643.0420)DAY3,550$1.01$1.00$0.55$1.00$0.55
109Traffic control warning lights type A (643.0705)DAY6,650$0.10$0.10$0.13$0.10$0.13
110Traffic control warning lights type C (643.0715)DAY20,800$0.10$0.10$0.13$0.10$0.13
111Traffic control connected arrow boards (643.0810)DAY245$15.17$15.00$12.50$15.00$12.50
112Traffic control signs (643.0900)DAY17,500$1.01$1.00$0.18$1.00$0.18
113Traffic control covering signs type I (643.0910)EACH5$657.15$650.00$250.00$650.00$250.00
114Traffic control covering signs type II (643.0920)EACH28$25.28$25.00$85.00$25.00$85.00
115Traffic control signs fixed message (643.1000)SF451$12.03$11.90$19.50$11.90$19.50
116Traffic control signs PCMS (643.1050)DAY45$45.50$45.00$35.00$45.00$35.00
117Truck or trailer mounted attenuator (643.1055.S)DAY10$298.25$295.00$1,515.00$295.00$1,515.00
118Traffic control cones 42-inch (643.1070)DAY30,000$0.51$0.50$0.13$0.50$0.13
119Basic traffic queue warning system (643.1205.S)DAY125$70.77$70.00$115.00$70.00$115.00
120Traffic control connected work zone start and end location markers (643.1220)DAY245$8.09$8.00$8.45$8.00$8.45
121Temporary marking line removable tape 6-inch (643.3180)LF26,270$1.72$1.70$1.85$1.70$1.85
122Temporary marking line removable tape 10-inch (643.3280)LF4,535$5.06$5.00$3.25$5.00$3.25
123Temporary marking removable mask out tape 6-inch (643.3960)LF840$3.03$3.00$2.35$3.00$2.35
124Traffic control (643.5000)EACH1$20,773$20,547$108,500$20,547$63,500
125Temporary pedestrian surface matting (644.1440)SF265$8.09$8.00$3.95$8.00$3.95
126Temporary pedestrian curb ramp (644.1601)DAY150$5.06$5.00$8.50$5.00$8.50
127Temporary pedestrian barricade (644.1810)LF1,705$6.07$6.00$6.00$6.00$6.00
128Geotextile type HR (645.0120)SY195$5.06$6.00$6.00$10.00$7.00
129Marking line epoxy 6-inch (646.2020)LF777$1.52$1.50$0.60$1.50$0.60
130Marking line grooved black epoxy 6-inch (646.2025)LF7,535$0.89$0.88$0.92$0.88$0.92
131Marking line grooved wet ref epoxy 6-inch (646.2040)LF73,924$1.29$1.28$1.47$1.28$1.47
132Marking line grooved wet ref epoxy 10-inch (646.4040)LF11,425$2.33$2.30$2.93$2.30$2.93
133Marking arrow epoxy (646.5020)EACH17$303.30$300.00$398.00$300.00$398.00
134Marking word epoxy (646.5120)EACH8$328.58$325.00$403.00$325.00$403.00
135Marking stop line epoxy 18-inch (646.6120)LF241$14.15$14.00$17.00$14.00$17.00
136Cold weather marking epoxy 6-inch (646.6466)LF1,250$0.76$0.75$0.50$0.75$0.50
137Cold weather marking epoxy 10- inch (646.6470)LF640$1.42$1.40$1.10$1.40$1.10
138Marking diagonal epoxy 12-inch (646.7120)LF195$12.13$12.00$16.50$12.00$16.50
139Marking chevron epoxy 24-inch (646.7220)LF620$16.18$16.00$27.50$16.00$27.50
140Marking crosswalk epoxy transverse line 6-inch (646.7420)LF415$10.11$10.00$15.90$10.00$15.90
141Marking curb epoxy (646.8120)LF565$8.09$8.00$8.75$8.00$8.75
142Marking island nose epoxy (646.8220)EACH12$353.85$350.00$300.00$350.00$300.00
143Marking removal line 4-inch (646.9000)LF5,520$0.51$0.50$0.45$0.50$0.45
144Marking removal line grooved contrast permanent tape 6-inch (646.9065)LF6,964$1.11$1.10$3.25$1.10$3.25
145Marking removal line 8-inch (646.9100)LF895$0.76$0.75$1.00$0.75$1.00
146Marking removal line wide (646.9200)LF66$0.76$0.75$3.00$0.75$3.00
147Construction staking storm sewer (650.4000)EACH4$202.20$200.00$150.00$150.00$150.00
148Construction staking concrete pavement (650.7000)LF2,330$1.26$0.50$1.60$1.60$1.60
149Construction staking resurfacing reference (650.8000)LF27,300$0.15$0.20$0.11$0.11$0.11
150Construction staking curb ramps (650.9000)EACH11$202.20$300.00$93.05$93.05$93.05
151Construction staking supplemental control (project) 01. 1510-01-61 (650.9911)EACH1$909.90$2,394.00$1,246.98$1,246.98$1,246.98
152Sawing asphalt (690.0150)LF538$1.77$1.69$1.69$1.69$1.69
153Sawing concrete (690.0250)LF28,606$2.38$2.10$2.10$2.30$4.25
154Incentive compressive strength concrete pavement (715.0720)DOL1,201$1.00$1.00$1.00$1.00$1.00
155Installing and maintaining climbing turtle exclusion fence (999.2100.S)LF500$7.08$4.00$8.00$7.00$7.00
156On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00$5.00
157On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,980$5.00$5.00$5.00$5.00$5.00
158Special 01. digital speed limit trailer pad (SPV.0060)EACH5$1,516.50$3,000.00$1,000.00$3,080.00$500.00
159Special 02. coring of existing concrete pavement (SPV.0060)EACH60$75.83$100.00$210.00$200.00$85.00
160Special 01. remove, salvage, and reinstall guardrail (SPV.0090)LF50$20.22$55.00$55.00$20.00$20.00
161Special 01. reinforced concrete pavement approach slab repair (SPV.0165)SF50$171.87$200.00$204.45$175.00$133.00
WisDOT contract 20251209028: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy