WisDOT contract 20251209033 bid tabulation

Waupaca - Clintonville; STH 54 to S Jct CTH B (STH 022, Waupaca County Waupaca - Clintonville). Let by Wisconsin DOT on December 9, 2025, Waupaca. 2 bids received; low bid $2,243,764 by American Asphalt of Wisconsin.

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
99
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1American Asphalt of Wisconsin$2,243,764Low
2Northeast Asphalt, Inc$2,252,1580.0%
WisDOT contract 20251209033: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. American Asphalt of Wisconsin2. Northeast Asphalt, Inc
1Grubbing (201.0205)STA1$450.00$450.00
2Removing small pipe culverts (203.0100)EACH8$500.00$500.00
3Removing structure (structure) 01. sta 33+79 (203.0220)EACH1$5,500.00$5,500.00
4Removing structure (structure) 02. sta 64+37 (203.0220)EACH1$6,500.00$6,500.00
5Removing structure (structure) 03. sta 103+47 (203.0220)EACH1$5,500.00$5,500.00
6Removing structure (structure) 04. sta 121+19 (203.0220)EACH1$7,500.00$7,500.00
7Removing structure (structure) 05. sta 161+62 (203.0220)EACH1$5,500.00$5,500.00
8Removing concrete pavement (204.0100)SY2,200$8.50$8.50
9Removing asphaltic surface (204.0110)SY50$20.00$20.00
10Removing asphaltic surface butt joints (204.0115)SY575$10.95$4.50
11Removing asphaltic surface milling (204.0120)SY65,000$0.30$2.00
12Removing curb & gutter (204.0150)LF128$10.00$10.00
13Removing guardrail (204.0165)LF1,760$3.00$3.00
14Removing manholes (204.0210)EACH1$1,250.00$1,250.00
15Excavation common (205.0100)CY5,730$22.65$22.65
16Temporary lane shift during culvert work (208.1500.S)EACH22$1.00$1.00
17Prepare foundation for asphaltic shoulders (211.0400)STA354$3.75$21.10
18Finishing roadway (project) 01. 6590-01-74 (213.0100)EACH1$100.00$2,150.00
19Base aggregate dense 3/4-inch (305.0110)TON1,880$28.45$28.45
20Base aggregate dense 1 1/4-inch (305.0120)TON3,170$21.25$21.25
21HMA cold weather paving (450.4000)TON6,380$0.10$0.01
22Tack coat (455.0605)GAL7,570$4.40$3.25
23Incentive density HMA pavement (460.2000)DOL9,030$1.00$1.00
24HMA pavement 3 MT 58-28 S (460.6223)TON7,720$66.34$61.10
25HMA pavement 4 MT 58-28 S (460.6224)TON6,380$73.02$67.40
26Asphaltic surface (465.0105)TON1,320$123.58$91.80
27Asphaltic surface patching (465.0110)TON148$257.31$210.00
28Asphaltic surface driveways and field entrances (465.0120)TON10$258.08$210.00
29Asphaltic flumes (465.0315)SY24$95.39$79.66
30Apron endwalls for culvert pipe 24- inch (520.1024)EACH4$528.25$528.25
31Apron endwalls for culvert pipe 30- inch (520.1030)EACH2$746.65$746.65
32Culvert pipe class III-A non-metal 24-inch (520.3424)LF128$113.78$113.78
33Culvert pipe class III-A non-metal 30-inch (520.3430)LF56$125.70$125.70
34Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH2$391.75$391.75
35Culvert pipe corrugated steel 18- inch (521.3118)LF32$97.40$97.40
36Culvert pipe reinforced concrete class III 42-inch (522.0142)LF52$252.15$252.15
37Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF48$140.46$140.46
38Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF110$178.77$178.77
39Culvert pipe reinforced concrete class IV 54-inch (522.0454)LF56$440.84$440.84
40Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH2$1,745.04$1,745.04
41Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH4$2,049.25$2,049.25
42Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042)EACH2$3,241.67$3,241.67
43Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054)EACH2$4,224.68$4,224.68
44Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419)LF80$203.02$203.02
45Culvert pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (522.2434)LF60$345.07$345.07
46Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619)EACH4$1,833.87$1,833.87
47Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634)EACH2$3,236.00$3,236.00
48Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF128$115.00$115.00
49Riprap light (606.0100)CY4$150.00$150.00
50Riprap medium (606.0200)CY38$110.00$110.00
51Riprap heavy (606.0300)CY4$185.00$185.00
52Barrier system grading shaping finishing (614.0010)EACH9$2,166.00$2,166.00
53Guardrail mow strip emulsified asphalt (614.0397)SY881$22.00$11.10
54MGS guardrail 3 (614.2300)LF1,053$30.00$30.00
55MGS guardrail 3 K (614.2330)LF350$31.00$31.00
56MGS thrie beam transition (614.2500)LF320$97.00$97.00
57MGS guardrail terminal eat (614.2610)EACH10$4,925.00$4,925.00
58Maintenance and repair of haul roads (project) 01. 6590-01-74 (618.0100)EACH1$100.00$1.00
59Mobilization (619.1000)EACH1$75,100$120,000
60Concrete median sloped nose (620.0300)SF87$21.25$21.25
61Water (624.0100)MGAL101$35.00$35.00
62Topsoil (625.0100)SY5,420$5.25$5.25
63Silt fence (628.1504)LF4,620$2.00$2.00
64Silt fence maintenance (628.1520)LF4,620$0.01$0.01
65Mobilizations erosion control (628.1905)EACH3$350.00$350.00
66Mobilizations emergency erosion control (628.1910)EACH3$0.01$0.01
67Erosion mat urban class I type B (628.2008)SY5,420$2.50$2.50
68Temporary ditch checks (628.7504)LF36$10.00$10.00
69Culvert pipe checks (628.7555)EACH90$10.00$10.00
70Rock bags (628.7570)EACH100$10.00$10.00
71Fertilizer type B (629.0210)CWT4.30$200.00$200.00
72Seeding mixture no. 30 (630.0130)LB249$11.00$11.00
73Seed water (630.0500)MGAL67$1.00$1.00
74Markers culvert end (633.5200)EACH22$70.00$70.00
75Moving signs type II (638.2102)EACH9$100.00$100.00
76Field office type B (642.5001)EACH1$7,400.00$8,950.00
77Traffic control drums (643.0300)DAY3,600$0.16$0.16
78Traffic control signs (643.0900)DAY1,000$0.30$0.30
79Traffic control signs fixed message (643.1000)SF36$15.00$15.00
80Temporary marking line paint 6- inch (643.3165)LF57,710$0.20$0.20
81Traffic control (643.5000)EACH1$9,650.00$9,650.00
82Geotextile type HR (645.0120)SY81$6.00$6.00
83Geotextile type R (645.0130)SY11$10.00$10.00
84Marking line epoxy 6-inch (646.2020)LF120$4.00$4.00
85Marking line grooved wet ref epoxy 6-inch (646.2040)LF57,190$1.29$1.29
86Marking line grooved wet ref epoxy 10-inch (646.4040)LF30$3.00$3.00
87Cold weather marking epoxy 6-inch (646.6466)LF57,340$0.34$0.34
88Locating no-passing zones (648.0100)MI3.31$545.00$545.00
89Construction staking curb gutter and curb & gutter (650.5500)LF128$0.69$0.69
90Construction staking pipe culverts (650.6000)EACH11$112.55$112.55
91Construction staking resurfacing reference (650.8000)LF17,696$0.09$0.09
92Construction staking supplemental control (project) 01. 6590-01-74 (650.9911)EACH1$446.98$446.98
93Sawing asphalt (690.0150)LF265$3.90$1.78
94Sawing concrete (690.0250)LF1,874$3.95$2.57
95Incentive iri ride (740.0440)DOL13,200$1.00$1.00
96On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00
97On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,260$5.00$5.00
98Special 01. maintaining exclusion fence (SPV.0090)LF2,120$1.85$1.85
99Special 01. removing distressed asphaltic surface milling (SPV.0180)SY1,320$8.38$4.75
WisDOT contract 20251209033: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy