| 1 | Removing small pipe culverts (203.0100) | EACH | 6 | $600.00 | $500.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 100 | $32.90 | $52.20 |
| 3 | Removing asphaltic surface (204.0110) | SY | 1,020 | $4.00 | $14.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 140 | $37.50 | $22.20 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 134,000 | $1.00 | $1.00 |
| 6 | Removing curb & gutter (204.0150) | LF | 1,332 | $4.00 | $8.00 |
| 7 | Excavation common (205.0100) | CY | 1,377 | $20.16 | $18.50 |
| 8 | Borrow (208.0100) | CY | 955 | $5.90 | $20.00 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 3030-02-66 (211.0101) | EACH | 1 | $29,185 | $4,000.00 |
| 10 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 722 | $48.25 | $62.35 |
| 11 | Finishing roadway (project) 01. 3030-02-66 (213.0100) | EACH | 1 | $4,300.00 | $2,750.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,485 | $24.00 | $25.10 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,765 | $24.90 | $22.00 |
| 14 | Tack coat (455.0605) | GAL | 17,860 | $3.00 | $3.00 |
| 15 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $2,800.00 | $3,750.00 |
| 16 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $3,500.00 | $3,500.00 |
| 17 | Incentive density PWL HMA pavement (460.2005) | DOL | 22,350 | $1.00 | $1.00 |
| 18 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 14,960 | $1.00 | $1.00 |
| 19 | Incentive air voids HMA pavement (460.2010) | DOL | 32,940 | $1.00 | $1.00 |
| 20 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 18,224 | $61.10 | $75.30 |
| 21 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 14,710 | $65.95 | $77.40 |
| 22 | Asphaltic surface (465.0105) | TON | 465 | $139.70 | $135.50 |
| 23 | Asphaltic surface driveways and field entrances (465.0120) | TON | 98 | $205.00 | $155.00 |
| 24 | Asphaltic flumes (465.0315) | SY | 19 | $56.50 | $100.00 |
| 25 | Asphaltic rumble strips, shoulder (465.0520) | LF | 50,800 | $0.24 | $0.14 |
| 26 | Asphaltic rumble strips, centerline (465.0560) | LF | 31,100 | $0.24 | $0.17 |
| 27 | Asphaltic rumble strips, transverse (465.0580) | SY | 80 | $46.50 | $96.90 |
| 28 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 4 | $500.00 | $900.00 |
| 29 | Culvert pipe class III-A 24-inch (520.3324) | LF | 82 | $110.25 | $95.00 |
| 30 | Culvert pipe class III-B 24-inch (520.3524) | LF | 121 | $172.40 | $150.00 |
| 31 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 312 | $251.85 | $395.00 |
| 32 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 110 | $174.05 | $125.00 |
| 33 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 4 | $1,112.00 | $2,450.00 |
| 34 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 4 | $1,508.00 | $3,250.00 |
| 35 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 1,332 | $28.85 | $28.25 |
| 36 | Riprap medium (606.0200) | CY | 25 | $131.00 | $155.00 |
| 37 | Adjusting steel plate beam guard (614.0400) | LF | 1,300 | $9.95 | $9.95 |
| 38 | Salvaged rail (614.0920) | LF | 1,300 | $3.00 | $3.00 |
| 39 | Salvaged guardrail end treatments (614.0925) | EACH | 26 | $250.00 | $250.00 |
| 40 | Replacing guardrail posts and blocks (614.0950) | EACH | 15 | $110.00 | $110.00 |
| 41 | Replacing guardrail reflectors (614.0952) | EACH | 39 | $10.00 | $10.00 |
| 42 | Maintenance and repair of haul roads (project) 01. 3030-02-66 (618.0100) | EACH | 1 | $1.00 | $100.00 |
| 43 | Mobilization (619.1000) | EACH | 1 | $160,500 | $49,100 |
| 44 | Water (624.0100) | MGAL | 61 | $40.40 | $50.00 |
| 45 | Topsoil (625.0100) | SY | 500 | $7.40 | $12.00 |
| 46 | Salvaged topsoil (625.0500) | SY | 3,920 | $1.25 | $4.50 |
| 47 | Silt fence (628.1504) | LF | 270 | $4.00 | $4.00 |
| 48 | Silt fence maintenance (628.1520) | LF | 270 | $0.01 | $0.01 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 6 | $100.00 | $100.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $100.00 |
| 51 | Erosion mat urban class I type A (628.2006) | SY | 4,480 | $2.00 | $2.00 |
| 52 | Culvert pipe checks (628.7555) | EACH | 22 | $20.00 | $20.00 |
| 53 | Fertilizer type B (629.0210) | CWT | 2.80 | $150.00 | $150.00 |
| 54 | Seeding mixture no. 20 (630.0120) | LB | 118 | $12.00 | $12.00 |
| 55 | Seeding temporary (630.0200) | LB | 60 | $8.00 | $8.00 |
| 56 | Seed water (630.0500) | MGAL | 24 | $20.00 | $20.00 |
| 57 | Markers culvert end (633.5200) | EACH | 12 | $75.00 | $75.00 |
| 58 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 1 | $150.00 | $150.00 |
| 59 | Signs type II reflective H (637.2210) | SF | 5.18 | $30.00 | $30.00 |
| 60 | Field office type C (642.5201) | EACH | 1 | $14,150 | $12,600 |
| 61 | Traffic control drums (643.0300) | DAY | 4,374 | $0.50 | $0.50 |
| 62 | Traffic control barricades type III (643.0420) | DAY | 1,782 | $0.50 | $0.50 |
| 63 | Traffic control warning lights type A (643.0705) | DAY | 3,564 | $0.10 | $0.10 |
| 64 | Traffic control signs (643.0900) | DAY | 30,281 | $0.10 | $0.10 |
| 65 | Traffic control covering signs type II (643.0920) | EACH | 11 | $20.00 | $20.00 |
| 66 | Traffic control signs PCMS (643.1050) | DAY | 14 | $79.95 | $79.95 |
| 67 | Temporary marking line paint 6- inch (643.3165) | LF | 95,600 | $0.28 | $0.28 |
| 68 | Traffic control (643.5000) | EACH | 1 | $15,000 | $15,000 |
| 69 | Geotextile type HR (645.0120) | SY | 50 | $10.00 | $5.15 |
| 70 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 120,120 | $1.26 | $1.26 |
| 71 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 645 | $1.94 | $1.94 |
| 72 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $1,100.20 | $1,100.20 |
| 73 | Marking stop line epoxy 18-inch (646.6120) | LF | 160 | $14.49 | $14.49 |
| 74 | Construction staking subgrade (650.4500) | LF | 370 | $0.01 | $1.36 |
| 75 | Construction staking base (650.5000) | LF | 370 | $1.36 | $1.36 |
| 76 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,332 | $0.73 | $0.73 |
| 77 | Construction staking pipe culverts (650.6000) | EACH | 6 | $119.41 | $119.41 |
| 78 | Construction staking resurfacing reference (650.8000) | LF | 37,384 | $0.10 | $0.10 |
| 79 | Construction staking supplemental control (project) 01. 3030-02-66 (650.9911) | EACH | 1 | $474.20 | $474.20 |
| 80 | Sawing asphalt (690.0150) | LF | 2,203 | $1.20 | $1.20 |
| 81 | Incentive iri ride (740.0440) | DOL | 28,330 | $1.00 | $1.00 |
| 82 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 450 | $5.00 | $5.00 |
| 83 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 325 | $5.00 | $5.00 |
| 84 | Special 01. foundation backfill (SPV.0035) | CY | 230 | $49.90 | $21.00 |
| 85 | Special 01. verify landmark reference monuments (SPV.0060) | EACH | 9 | $856.45 | $856.45 |
| 86 | Special 02. reinstalling energy absorbing terminal (eat) (SPV.0060) | EACH | 26 | $1,700.00 | $1,700.00 |
| 87 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 2,000 | $8.40 | $12.90 |