WisDOT contract 20260113012 bid tabulation
Argyle - Mt Horeb; Lien Court to North Junction CTH H (STH 078, Green County Argyle - Mt Horeb). Let by Wisconsin DOT on January 13, 2026, Green. 3 bids received; low bid $4,758,826 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 13 JAN 2026
- Pay items
- 137
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $4,758,826 | Low |
| 2 | Rock Road Companies, Inc. | $4,959,356 | +4.0% |
| 3 | Iverson Construction, A Div. of Mathy Co | $5,066,838 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Rock Road Companies, Inc. | 3. Iverson Construction, A Div. of Mathy Co |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0220) | ID | 176 | $25.00 | $19.85 | $19.85 |
| 2 | Removing concrete pavement (204.0100) | SY | 1,238 | $6.15 | $6.15 | $10.50 |
| 3 | Removing asphaltic surface (204.0110) | SY | 760 | $7.98 | $7.98 | $10.50 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 514 | $0.52 | $6.63 | $10.50 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 112,480 | $0.52 | $0.50 | $1.64 |
| 6 | Removing curb & gutter (204.0150) | LF | 5,381 | $6.15 | $6.15 | $7.50 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 2,220 | $9.75 | $9.75 | $13.00 |
| 8 | Removing guardrail (204.0165) | LF | 1,636 | $2.45 | $2.45 | $2.45 |
| 9 | Removing manholes (204.0210) | EACH | 10 | $850.00 | $850.00 | $750.00 |
| 10 | Removing inlets (204.0220) | EACH | 22 | $525.00 | $525.00 | $750.00 |
| 11 | Removing storm sewer (size) 01. 15-inch (204.0245) | LF | 1,838 | $13.25 | $13.25 | $16.00 |
| 12 | Removing storm sewer (size) 02. 12-inch (204.0245) | LF | 332 | $13.25 | $13.25 | $25.00 |
| 13 | Excavation common (205.0100) | CY | 13,221 | $13.55 | $13.55 | $17.60 |
| 14 | Prepare foundation for asphaltic paving (project) 01. 5590-05-71 (211.0101) | EACH | 1 | $100.00 | $0.01 | $5,963.93 |
| 15 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 19 | $50.00 | $159.99 | $148.15 |
| 16 | Finishing roadway (project) 01. 5590-05-71 (213.0100) | EACH | 1 | $0.01 | $5,124.89 | $100.00 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 5,920 | $25.00 | $26.01 | $22.00 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 9,080 | $21.84 | $21.84 | $21.00 |
| 19 | Breaker run (311.0110) | TON | 130 | $21.84 | $21.84 | $25.00 |
| 20 | Select crushed material (312.0110) | TON | 11,940 | $21.84 | $21.84 | $20.50 |
| 21 | Tack coat (455.0605) | GAL | 14,280 | $0.01 | $3.19 | $2.25 |
| 22 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $100.00 | $3,500.00 | $1,400.00 |
| 23 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $100.00 | $3,500.00 | $1,400.00 |
| 24 | Incentive density HMA pavement (460.2000) | DOL | 4,360 | $1.00 | $1.00 | $1.00 |
| 25 | Incentive density PWL HMA pavement (460.2005) | DOL | 13,800 | $1.00 | $1.00 | $1.00 |
| 26 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 5,230 | $1.00 | $1.00 | $1.00 |
| 27 | Incentive air voids HMA pavement (460.2010) | DOL | 18,870 | $1.00 | $1.00 | $1.00 |
| 28 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 18,870 | $77.45 | $70.97 | $69.00 |
| 29 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 6,800 | $79.65 | $77.19 | $69.85 |
| 30 | Asphaltic surface (465.0105) | TON | 240 | $90.00 | $86.07 | $83.00 |
| 31 | Asphaltic surface patching (465.0110) | TON | 60 | $100.00 | $153.46 | $104.00 |
| 32 | Asphaltic surface driveways and field entrances (465.0120) | TON | 140 | $150.00 | $160.65 | $93.00 |
| 33 | Asphaltic flumes (465.0315) | SY | 49 | $45.00 | $62.82 | $31.00 |
| 34 | Asphaltic rumble strips, shoulder (465.0520) | LF | 974 | $0.30 | $1.00 | $0.50 |
| 35 | Asphaltic rumble strips, centerline (465.0560) | LF | 24,022 | $0.30 | $0.29 | $0.50 |
| 36 | Protective surface treatment (502.3200) | SY | 23 | $10.00 | $10.00 | $15.00 |
| 37 | Pigmented surface sealer (502.3210) | SY | 1 | $100.00 | $100.00 | $18.00 |
| 38 | Preparation decks type 1 (509.0301) | SY | 23 | $250.00 | $250.00 | $665.00 |
| 39 | Preparation decks type 2 (509.0302) | SY | 9 | $440.00 | $440.00 | $785.00 |
| 40 | Sawing pavement deck preparation areas (509.0310.S) | LF | 230 | $9.00 | $9.00 | $16.00 |
| 41 | Concrete surface repair (509.1500) | SF | 21 | $300.00 | $300.00 | $435.00 |
| 42 | Concrete masonry deck repair (509.2100.S) | CY | 2 | $5,000.00 | $5,000.00 | $2,865.00 |
| 43 | Epoxy crack sealing (509.9020.S) | LF | 1,100 | $2.50 | $2.50 | $6.00 |
| 44 | Concrete collars for pipe (520.8000) | EACH | 5 | $1,075.00 | $1,075.00 | $750.00 |
| 45 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 5,436 | $20.20 | $20.00 | $20.00 |
| 46 | Concrete curb pedestrian (601.0600) | LF | 206 | $70.71 | $70.00 | $70.00 |
| 47 | Concrete sidewalk 5-inch (602.0410) | SF | 22,042 | $5.56 | $5.50 | $5.50 |
| 48 | Curb ramp detectable warning field yellow (602.0505) | SF | 400 | $70.71 | $70.00 | $70.00 |
| 49 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 108 | $75.76 | $75.00 | $75.00 |
| 50 | Concrete driveway 6-inch (602.0810) | SY | 236 | $60.61 | $60.00 | $60.00 |
| 51 | Concrete steps (602.1500) | SF | 16 | $70.71 | $70.00 | $70.00 |
| 52 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 576 | $89.00 | $89.00 | $95.00 |
| 53 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 76 | $93.00 | $93.00 | $114.00 |
| 54 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 103 | $98.00 | $98.00 | $107.00 |
| 55 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 2,070 | $109.00 | $109.00 | $125.00 |
| 56 | Manhole covers type J (611.0530) | EACH | 16 | $1,025.00 | $1,025.00 | $850.00 |
| 57 | Inlet covers type H (611.0624) | EACH | 31 | $1,100.00 | $1,100.00 | $1,095.00 |
| 58 | Manholes 4-FT diameter (611.2004) | EACH | 14 | $3,975.00 | $3,975.00 | $3,110.00 |
| 59 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $5,875.00 | $5,875.00 | $4,250.00 |
| 60 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $10,500 | $10,500 | $8,625.00 |
| 61 | Inlets 4-FT diameter (611.3004) | EACH | 7 | $4,125.00 | $4,125.00 | $2,700.00 |
| 62 | Inlets 2X3-FT (611.3230) | EACH | 24 | $2,725.00 | $2,725.00 | $2,250.00 |
| 63 | Adjusting manhole covers (611.8110) | EACH | 6 | $1,050.00 | $1,050.00 | $1,175.00 |
| 64 | Adjusting inlet covers (611.8115) | EACH | 2 | $1,125.00 | $1,125.00 | $1,420.00 |
| 65 | Pipe underdrain 6-inch (612.0106) | LF | 4,400 | $10.68 | $10.68 | $10.00 |
| 66 | Barrier system grading shaping finishing (614.0010) | EACH | 5 | $7,085.00 | $2,441.32 | $3,450.00 |
| 67 | MGS guardrail 3 (614.2300) | LF | 1,163 | $28.00 | $28.00 | $28.00 |
| 68 | MGS guardrail 3 K (614.2330) | LF | 150 | $38.00 | $38.00 | $38.00 |
| 69 | MGS thrie beam transition (614.2500) | LF | 200 | $88.00 | $88.00 | $88.00 |
| 70 | MGS guardrail terminal eat (614.2610) | EACH | 7 | $3,750.00 | $3,750.00 | $3,750.00 |
| 71 | Maintenance and repair of haul roads (project) 01. 5590-05-71 (618.0100) | EACH | 1 | $0.01 | $0.01 | $1.00 |
| 72 | Mobilization (619.1000) | EACH | 1 | $20,000 | $308,221 | $275,440 |
| 73 | Water (624.0100) | MGAL | 226 | $0.01 | $0.01 | $25.00 |
| 74 | Topsoil (625.0100) | SY | 3,960 | $4.95 | $4.95 | $10.85 |
| 75 | Silt fence (628.1504) | LF | 1,812 | $2.10 | $2.10 | $2.10 |
| 76 | Silt fence maintenance (628.1520) | LF | 1,812 | $0.01 | $0.01 | $0.01 |
| 77 | Mobilizations erosion control (628.1905) | EACH | 2 | $100.00 | $100.00 | $100.00 |
| 78 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $100.00 | $100.00 |
| 79 | Erosion mat urban class I type B (628.2008) | SY | 2,370 | $1.90 | $1.90 | $1.90 |
| 80 | Inlet protection type A (628.7005) | EACH | 30 | $80.00 | $80.00 | $80.00 |
| 81 | Inlet protection type C (628.7015) | EACH | 37 | $75.00 | $75.00 | $75.00 |
| 82 | Fertilizer type B (629.0210) | CWT | 3.50 | $150.00 | $150.00 | $150.00 |
| 83 | Seeding mixture no. 40 (630.0140) | LB | 113 | $15.00 | $15.00 | $15.00 |
| 84 | Seed water (630.0500) | MGAL | 52 | $20.00 | $20.00 | $20.00 |
| 85 | Sod water (631.0300) | MGAL | 60 | $100.00 | $100.00 | $100.00 |
| 86 | Sod lawn (631.1000) | SY | 1,590 | $9.00 | $9.00 | $9.00 |
| 87 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 2 | $100.00 | $100.00 | $100.00 |
| 88 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 6 | $200.00 | $200.00 | $200.00 |
| 89 | Moving signs type II (638.2102) | EACH | 96 | $150.00 | $150.00 | $150.00 |
| 90 | Removing signs type II (638.2602) | EACH | 1 | $45.00 | $45.00 | $45.00 |
| 91 | Field office type B (642.5001) | EACH | 1 | $5,000.00 | $7,800.00 | $13,000 |
| 92 | Traffic control drums (643.0300) | DAY | 1,950 | $0.64 | $1.00 | $0.64 |
| 93 | Traffic control barricades type III (643.0420) | DAY | 10,220 | $0.73 | $0.35 | $0.73 |
| 94 | Traffic control warning lights type A (643.0705) | DAY | 20,430 | $0.16 | $0.10 | $0.16 |
| 95 | Traffic control signs (643.0900) | DAY | 59,240 | $0.30 | $0.25 | $0.30 |
| 96 | Traffic control covering signs type II (643.0920) | EACH | 3 | $65.28 | $25.00 | $65.28 |
| 97 | Traffic control signs PCMS (643.1050) | DAY | 14 | $60.93 | $99.00 | $60.93 |
| 98 | Temporary marking line paint 6- inch (643.3165) | LF | 115,920 | $0.19 | $0.19 | $0.19 |
| 99 | Temporary marking line epoxy 6- inch (643.3170) | LF | 45,510 | $0.80 | $0.80 | $0.80 |
| 100 | Temporary marking crosswalk epoxy 6-inch (643.3320) | LF | 662 | $8.50 | $8.50 | $8.50 |
| 101 | Traffic control (643.5000) | EACH | 1 | $26,071 | $5,500.00 | $26,071 |
| 102 | Temporary pedestrian surface matting (644.1440) | SF | 8,715 | $1.95 | $6.00 | $1.95 |
| 103 | Temporary pedestrian curb ramp (644.1601) | DAY | 560 | $16.52 | $10.00 | $16.52 |
| 104 | Temporary pedestrian detectable warning field (644.1605) | SF | 360 | $7.99 | $5.00 | $7.99 |
| 105 | Temporary pedestrian barricade (644.1810) | LF | 6,016 | $5.07 | $4.35 | $5.07 |
| 106 | Temporary audible message devices (644.1900.S) | DAY | 380 | $4.31 | $8.00 | $4.31 |
| 107 | Geotextile type DF schedule A (645.0111) | SY | 2,460 | $2.95 | $2.95 | $2.50 |
| 108 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 110,050 | $1.20 | $1.20 | $1.20 |
| 109 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 650 | $2.15 | $2.15 | $2.15 |
| 110 | Marking stop line epoxy 18-inch (646.6120) | LF | 283 | $16.00 | $16.00 | $16.00 |
| 111 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 830 | $13.00 | $13.00 | $13.00 |
| 112 | Marking parking stall epoxy (646.8320) | LF | 226 | $22.50 | $22.50 | $22.50 |
| 113 | Locating no-passing zones (648.0100) | MI | 5.79 | $700.00 | $700.00 | $700.00 |
| 114 | Construction staking storm sewer (650.4000) | EACH | 47 | $300.00 | $300.00 | $300.00 |
| 115 | Construction staking subgrade (650.4500) | LF | 2,529 | $0.02 | $0.02 | $0.02 |
| 116 | Construction staking base (650.5000) | LF | 2,529 | $0.50 | $0.50 | $0.50 |
| 117 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 5,436 | $1.00 | $1.00 | $1.00 |
| 118 | Construction staking resurfacing reference (650.8000) | LF | 30,749 | $0.20 | $0.20 | $0.20 |
| 119 | Construction staking curb ramps (650.9000) | EACH | 47 | $300.00 | $300.00 | $300.00 |
| 120 | Construction staking sidewalk (project) 01.5590-05-71 (650.9500) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 |
| 121 | Construction staking supplemental control (project) 01. 5590-05-71 (650.9911) | EACH | 1 | $100.00 | $100.00 | $100.00 |
| 122 | Construction staking slope stakes (650.9920) | LF | 2,479 | $1.00 | $1.00 | $1.00 |
| 123 | Sawing asphalt (690.0150) | LF | 1,276 | $1.68 | $1.55 | $1.49 |
| 124 | Sawing concrete (690.0250) | LF | 2,571 | $2.58 | $2.19 | $2.25 |
| 125 | Incentive iri ride (740.0440) | DOL | 28,000 | $1.00 | $1.00 | $1.00 |
| 126 | Installing and maintaining bird deterrent system (station) 01. 741+00 (999.2000.S) | EACH | 1 | $1.00 | $1.00 | $22,325 |
| 127 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 |
| 128 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,160 | $5.00 | $5.00 | $5.00 |
| 129 | Special 01. adjusting water valve box (SPV.0060) | EACH | 64 | $478.00 | $478.00 | $725.00 |
| 130 | Special 02. embedded galvanic anodes (SPV.0060) | EACH | 80 | $45.00 | $45.00 | $65.00 |
| 131 | Special 03. V-loc post anchor VS3 (SPV.0060) | EACH | 8 | $150.00 | $150.00 | $150.00 |
| 132 | Special 04. temporary mailbox station (SPV.0060) | EACH | 2 | $1,500.00 | $1,054.20 | $75.00 |
| 133 | Special 05. adjusting sanitary manhole castings with internal chimney seals (SPV.0060) | EACH | 25 | $1,850.00 | $1,850.00 | $1,200.00 |
| 134 | Special 01. removing existing wood timbers (SPV.0090) | LF | 26 | $42.00 | $42.00 | $57.00 |
| 135 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 1,450 | $5.00 | $7.07 | $3.50 |
| 136 | Special 01. exc, hauling, and disposal of petroleum-contaminate soil (bioremediation) (SPV.0195) | TON | 150 | $87.00 | $87.00 | $150.00 |
| 137 | Special 02. exc, hauling, and disposal of solid waste (direct landfill) (SPV.0195) | TON | 50 | $87.00 | $87.00 | $250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.