WisDOT contract 20260113012 bid tabulation

Argyle - Mt Horeb; Lien Court to North Junction CTH H (STH 078, Green County Argyle - Mt Horeb). Let by Wisconsin DOT on January 13, 2026, Green. 3 bids received; low bid $4,758,826 by Payne and Dolan, Inc.

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
137
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Payne and Dolan, Inc$4,758,826Low
2Rock Road Companies, Inc.$4,959,356+4.0%
3Iverson Construction, A Div. of Mathy Co$5,066,838+6.0%
WisDOT contract 20260113012: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Payne and Dolan, Inc2. Rock Road Companies, Inc.3. Iverson Construction, A Div. of Mathy Co
1Grubbing (201.0220)ID176$25.00$19.85$19.85
2Removing concrete pavement (204.0100)SY1,238$6.15$6.15$10.50
3Removing asphaltic surface (204.0110)SY760$7.98$7.98$10.50
4Removing asphaltic surface butt joints (204.0115)SY514$0.52$6.63$10.50
5Removing asphaltic surface milling (204.0120)SY112,480$0.52$0.50$1.64
6Removing curb & gutter (204.0150)LF5,381$6.15$6.15$7.50
7Removing concrete sidewalk (204.0155)SY2,220$9.75$9.75$13.00
8Removing guardrail (204.0165)LF1,636$2.45$2.45$2.45
9Removing manholes (204.0210)EACH10$850.00$850.00$750.00
10Removing inlets (204.0220)EACH22$525.00$525.00$750.00
11Removing storm sewer (size) 01. 15-inch (204.0245)LF1,838$13.25$13.25$16.00
12Removing storm sewer (size) 02. 12-inch (204.0245)LF332$13.25$13.25$25.00
13Excavation common (205.0100)CY13,221$13.55$13.55$17.60
14Prepare foundation for asphaltic paving (project) 01. 5590-05-71 (211.0101)EACH1$100.00$0.01$5,963.93
15Prepare foundation for asphaltic shoulders (211.0400)STA19$50.00$159.99$148.15
16Finishing roadway (project) 01. 5590-05-71 (213.0100)EACH1$0.01$5,124.89$100.00
17Base aggregate dense 3/4-inch (305.0110)TON5,920$25.00$26.01$22.00
18Base aggregate dense 1 1/4-inch (305.0120)TON9,080$21.84$21.84$21.00
19Breaker run (311.0110)TON130$21.84$21.84$25.00
20Select crushed material (312.0110)TON11,940$21.84$21.84$20.50
21Tack coat (455.0605)GAL14,280$0.01$3.19$2.25
22HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$100.00$3,500.00$1,400.00
23HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$100.00$3,500.00$1,400.00
24Incentive density HMA pavement (460.2000)DOL4,360$1.00$1.00$1.00
25Incentive density PWL HMA pavement (460.2005)DOL13,800$1.00$1.00$1.00
26Incentive density HMA pavement longitudinal joints (460.2007)DOL5,230$1.00$1.00$1.00
27Incentive air voids HMA pavement (460.2010)DOL18,870$1.00$1.00$1.00
28HMA pavement 4 LT 58-28 S (460.5224)TON18,870$77.45$70.97$69.00
29HMA pavement 4 MT 58-28 S (460.6224)TON6,800$79.65$77.19$69.85
30Asphaltic surface (465.0105)TON240$90.00$86.07$83.00
31Asphaltic surface patching (465.0110)TON60$100.00$153.46$104.00
32Asphaltic surface driveways and field entrances (465.0120)TON140$150.00$160.65$93.00
33Asphaltic flumes (465.0315)SY49$45.00$62.82$31.00
34Asphaltic rumble strips, shoulder (465.0520)LF974$0.30$1.00$0.50
35Asphaltic rumble strips, centerline (465.0560)LF24,022$0.30$0.29$0.50
36Protective surface treatment (502.3200)SY23$10.00$10.00$15.00
37Pigmented surface sealer (502.3210)SY1$100.00$100.00$18.00
38Preparation decks type 1 (509.0301)SY23$250.00$250.00$665.00
39Preparation decks type 2 (509.0302)SY9$440.00$440.00$785.00
40Sawing pavement deck preparation areas (509.0310.S)LF230$9.00$9.00$16.00
41Concrete surface repair (509.1500)SF21$300.00$300.00$435.00
42Concrete masonry deck repair (509.2100.S)CY2$5,000.00$5,000.00$2,865.00
43Epoxy crack sealing (509.9020.S)LF1,100$2.50$2.50$6.00
44Concrete collars for pipe (520.8000)EACH5$1,075.00$1,075.00$750.00
45Concrete curb & gutter 30-inch type D (601.0411)LF5,436$20.20$20.00$20.00
46Concrete curb pedestrian (601.0600)LF206$70.71$70.00$70.00
47Concrete sidewalk 5-inch (602.0410)SF22,042$5.56$5.50$5.50
48Curb ramp detectable warning field yellow (602.0505)SF400$70.71$70.00$70.00
49Curb ramp detectable warning field radial yellow (602.0605)SF108$75.76$75.00$75.00
50Concrete driveway 6-inch (602.0810)SY236$60.61$60.00$60.00
51Concrete steps (602.1500)SF16$70.71$70.00$70.00
52Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF576$89.00$89.00$95.00
53Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF76$93.00$93.00$114.00
54Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF103$98.00$98.00$107.00
55Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF2,070$109.00$109.00$125.00
56Manhole covers type J (611.0530)EACH16$1,025.00$1,025.00$850.00
57Inlet covers type H (611.0624)EACH31$1,100.00$1,100.00$1,095.00
58Manholes 4-FT diameter (611.2004)EACH14$3,975.00$3,975.00$3,110.00
59Manholes 5-FT diameter (611.2005)EACH1$5,875.00$5,875.00$4,250.00
60Manholes 8-FT diameter (611.2008)EACH1$10,500$10,500$8,625.00
61Inlets 4-FT diameter (611.3004)EACH7$4,125.00$4,125.00$2,700.00
62Inlets 2X3-FT (611.3230)EACH24$2,725.00$2,725.00$2,250.00
63Adjusting manhole covers (611.8110)EACH6$1,050.00$1,050.00$1,175.00
64Adjusting inlet covers (611.8115)EACH2$1,125.00$1,125.00$1,420.00
65Pipe underdrain 6-inch (612.0106)LF4,400$10.68$10.68$10.00
66Barrier system grading shaping finishing (614.0010)EACH5$7,085.00$2,441.32$3,450.00
67MGS guardrail 3 (614.2300)LF1,163$28.00$28.00$28.00
68MGS guardrail 3 K (614.2330)LF150$38.00$38.00$38.00
69MGS thrie beam transition (614.2500)LF200$88.00$88.00$88.00
70MGS guardrail terminal eat (614.2610)EACH7$3,750.00$3,750.00$3,750.00
71Maintenance and repair of haul roads (project) 01. 5590-05-71 (618.0100)EACH1$0.01$0.01$1.00
72Mobilization (619.1000)EACH1$20,000$308,221$275,440
73Water (624.0100)MGAL226$0.01$0.01$25.00
74Topsoil (625.0100)SY3,960$4.95$4.95$10.85
75Silt fence (628.1504)LF1,812$2.10$2.10$2.10
76Silt fence maintenance (628.1520)LF1,812$0.01$0.01$0.01
77Mobilizations erosion control (628.1905)EACH2$100.00$100.00$100.00
78Mobilizations emergency erosion control (628.1910)EACH2$100.00$100.00$100.00
79Erosion mat urban class I type B (628.2008)SY2,370$1.90$1.90$1.90
80Inlet protection type A (628.7005)EACH30$80.00$80.00$80.00
81Inlet protection type C (628.7015)EACH37$75.00$75.00$75.00
82Fertilizer type B (629.0210)CWT3.50$150.00$150.00$150.00
83Seeding mixture no. 40 (630.0140)LB113$15.00$15.00$15.00
84Seed water (630.0500)MGAL52$20.00$20.00$20.00
85Sod water (631.0300)MGAL60$100.00$100.00$100.00
86Sod lawn (631.1000)SY1,590$9.00$9.00$9.00
87Posts wood 4X6-inch X 14-FT (634.0614)EACH2$100.00$100.00$100.00
88Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH6$200.00$200.00$200.00
89Moving signs type II (638.2102)EACH96$150.00$150.00$150.00
90Removing signs type II (638.2602)EACH1$45.00$45.00$45.00
91Field office type B (642.5001)EACH1$5,000.00$7,800.00$13,000
92Traffic control drums (643.0300)DAY1,950$0.64$1.00$0.64
93Traffic control barricades type III (643.0420)DAY10,220$0.73$0.35$0.73
94Traffic control warning lights type A (643.0705)DAY20,430$0.16$0.10$0.16
95Traffic control signs (643.0900)DAY59,240$0.30$0.25$0.30
96Traffic control covering signs type II (643.0920)EACH3$65.28$25.00$65.28
97Traffic control signs PCMS (643.1050)DAY14$60.93$99.00$60.93
98Temporary marking line paint 6- inch (643.3165)LF115,920$0.19$0.19$0.19
99Temporary marking line epoxy 6- inch (643.3170)LF45,510$0.80$0.80$0.80
100Temporary marking crosswalk epoxy 6-inch (643.3320)LF662$8.50$8.50$8.50
101Traffic control (643.5000)EACH1$26,071$5,500.00$26,071
102Temporary pedestrian surface matting (644.1440)SF8,715$1.95$6.00$1.95
103Temporary pedestrian curb ramp (644.1601)DAY560$16.52$10.00$16.52
104Temporary pedestrian detectable warning field (644.1605)SF360$7.99$5.00$7.99
105Temporary pedestrian barricade (644.1810)LF6,016$5.07$4.35$5.07
106Temporary audible message devices (644.1900.S)DAY380$4.31$8.00$4.31
107Geotextile type DF schedule A (645.0111)SY2,460$2.95$2.95$2.50
108Marking line grooved wet ref epoxy 6-inch (646.2040)LF110,050$1.20$1.20$1.20
109Marking line grooved wet ref epoxy 10-inch (646.4040)LF650$2.15$2.15$2.15
110Marking stop line epoxy 18-inch (646.6120)LF283$16.00$16.00$16.00
111Marking crosswalk epoxy transverse line 6-inch (646.7420)LF830$13.00$13.00$13.00
112Marking parking stall epoxy (646.8320)LF226$22.50$22.50$22.50
113Locating no-passing zones (648.0100)MI5.79$700.00$700.00$700.00
114Construction staking storm sewer (650.4000)EACH47$300.00$300.00$300.00
115Construction staking subgrade (650.4500)LF2,529$0.02$0.02$0.02
116Construction staking base (650.5000)LF2,529$0.50$0.50$0.50
117Construction staking curb gutter and curb & gutter (650.5500)LF5,436$1.00$1.00$1.00
118Construction staking resurfacing reference (650.8000)LF30,749$0.20$0.20$0.20
119Construction staking curb ramps (650.9000)EACH47$300.00$300.00$300.00
120Construction staking sidewalk (project) 01.5590-05-71 (650.9500)EACH1$2,000.00$2,000.00$2,000.00
121Construction staking supplemental control (project) 01. 5590-05-71 (650.9911)EACH1$100.00$100.00$100.00
122Construction staking slope stakes (650.9920)LF2,479$1.00$1.00$1.00
123Sawing asphalt (690.0150)LF1,276$1.68$1.55$1.49
124Sawing concrete (690.0250)LF2,571$2.58$2.19$2.25
125Incentive iri ride (740.0440)DOL28,000$1.00$1.00$1.00
126Installing and maintaining bird deterrent system (station) 01. 741+00 (999.2000.S)EACH1$1.00$1.00$22,325
127On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00
128On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,160$5.00$5.00$5.00
129Special 01. adjusting water valve box (SPV.0060)EACH64$478.00$478.00$725.00
130Special 02. embedded galvanic anodes (SPV.0060)EACH80$45.00$45.00$65.00
131Special 03. V-loc post anchor VS3 (SPV.0060)EACH8$150.00$150.00$150.00
132Special 04. temporary mailbox station (SPV.0060)EACH2$1,500.00$1,054.20$75.00
133Special 05. adjusting sanitary manhole castings with internal chimney seals (SPV.0060)EACH25$1,850.00$1,850.00$1,200.00
134Special 01. removing existing wood timbers (SPV.0090)LF26$42.00$42.00$57.00
135Special 01. removing distressed pavement milling (SPV.0180)SY1,450$5.00$7.07$3.50
136Special 01. exc, hauling, and disposal of petroleum-contaminate soil (bioremediation) (SPV.0195)TON150$87.00$87.00$150.00
137Special 02. exc, hauling, and disposal of solid waste (direct landfill) (SPV.0195)TON50$87.00$87.00$250.00
WisDOT contract 20260113012: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy