WisDOT contract 20260113026 bid tabulation

Wisconsin Rapids - Plover; 26th Street North to CTH B (STH 054, Portage County Wisconsin Rapids - Plover). Let by Wisconsin DOT on January 13, 2026, Portage. 4 bids received; low bid $7,526,564 by Michels Road & Stone, Inc..

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
109
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Michels Road & Stone, Inc.$7,526,564Low
2Chippewa Concrete Services, Inc.$7,620,029+1.0%
3Zignego Company, Inc.$8,147,429+8.0%
4Vinton Construction Company$8,480,911+13%
WisDOT contract 20260113026: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Michels Road & Stone, Inc.2. Chippewa Concrete Services, Inc.3. Zignego Company, Inc.4. Vinton Construction Company
1Removing asphaltic surface (204.0110)SY3,930$22.00$6.57$5.18$13.50
2Removing asphaltic surface butt joints (204.0115)SY1,350$1.00$5.93$6.57$6.57
3Removing asphaltic surface milling (204.0120)SY116,750$2.62$2.61$3.60$3.60
4Removing curb & gutter (204.0150)LF3,785$11.00$18.10$5.18$21.03
5Removing concrete sidewalk (204.0155)SY1,190$11.00$22.24$7.18$20.90
6Removing (item description) 01. apron endwalls (204.9060.S)EACH4$600.00$758.25$500.00$340.00
7Prepare foundation for asphaltic paving (project) 01. 1520-01-60 (211.0101)EACH1$75,000$90,176$89,195$89,195
8Finishing roadway (project) 01. 1520-01-60 (213.0100)EACH1$5,000.00$5,055.00$1,000.00$10,000
9Base aggregate dense 3/4-inch (305.0110)TON8,200$26.00$25.02$30.93$33.00
10Base aggregate dense 1 1/4-inch (305.0120)TON1,710$27.00$18.15$30.69$0.01
11Concrete pavement 9-inch (415.0090)SY38$135.00$140.11$200.00$98.00
12Rout and seal (415.6000.S)LF190,000$0.65$0.66$0.65$0.66
13Drilled tie bars (416.0610)EACH4,040$13.00$10.92$15.00$10.00
14Drilled dowel bars (416.0620)EACH11,640$17.00$13.85$20.00$17.50
15Concrete pavement repair (416.1710)SY5,960$94.00$107.94$108.00$115.89
16Concrete pavement repair shes (416.1715)SY20$107.00$112.68$500.00$185.00
17Concrete pavement replacement (416.1720)SY9,790$95.00$107.94$108.00$120.89
18Concrete pavement replacement shes (416.1725)SY310$107.00$112.68$200.00$190.00
19Continuous diamond grinding concrete pavement (420.1000)SY276,400$3.66$3.69$3.45$3.65
20Tack coat (455.0605)GAL7,940$5.24$5.30$5.24$5.24
21Incentive density HMA pavement (460.2000)DOL7,330$1.00$1.00$1.00$1.00
22HMA pavement 4 LT 58-28 S (460.5224)TON11,400$104.47$105.62$104.47$104.47
23Asphaltic surface (465.0105)TON1,200$182.04$184.41$182.04$182.04
24Asphaltic rumble strips, shoulder divided roadway (465.0510)LF190,000$0.13$0.13$0.13$0.13
25Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH2$4,500.00$3,164.43$1,764.00$1,980.00
26Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624)EACH2$4,000.00$3,942.90$2,594.00$1,635.00
27Concrete curb & gutter 18-inch type A (601.0405)LF410$45.00$66.03$93.00$64.00
28Concrete curb & gutter 30-inch type A (601.0409)LF3,010$48.00$68.20$93.00$66.50
29Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF100$51.00$69.79$95.00$68.00
30Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF72$51.00$69.79$95.00$68.00
31Concrete curb pedestrian (601.0600)LF335$55.00$42.00$93.00$55.00
32Concrete sidewalk 4-inch (602.0405)SF3,940$11.00$14.61$11.00$15.25
33Concrete sidewalk 6-inch (602.0415)SF6,465$12.00$15.50$12.00$16.00
34Curb ramp detectable warning field natural patina (602.0515)SF540$35.00$61.18$45.00$35.00
35Curb ramp detectable warning field radial natural patina (602.0615)SF496$47.00$68.59$75.00$60.00
36Concrete safety islands (602.2400)SF250$13.00$16.42$20.00$18.00
37Reconstructing inlets (611.0430)EACH17$6,200.00$1,415.40$2,525.00$1,500.00
38Inlet covers type H (611.0624)EACH3$1,400.00$1,627.71$1,100.00$776.00
39Inlet covers type HM (611.0627)EACH4$1,300.00$1,627.71$1,100.00$776.00
40Adjusting inlet covers (611.8115)EACH200$650.00$945.29$1,200.00$790.00
41Maintenance and repair of haul roads (project) 01. 1520-01-60 (618.0100)EACH1$0.01$1.01$1.00$0.01
42Mobilization (619.1000)EACH1$474,168$322,826$510,000$840,000
43Water (624.0100)MGAL140$50.00$1.01$45.00$50.00
44Topsoil (625.0100)SY1,920$10.00$10.62$12.00$9.50
45Silt fence (628.1504)LF600$2.50$2.53$2.50$3.00
46Silt fence maintenance (628.1520)LF300$0.01$0.01$0.01$0.01
47Mobilizations erosion control (628.1905)EACH4$200.00$202.20$200.00$450.00
48Mobilizations emergency erosion control (628.1910)EACH2$100.00$101.10$100.00$1.00
49Erosion mat urban class I type A (628.2006)SY1,920$1.80$1.82$1.80$3.00
50Inlet protection type B (628.7010)EACH2$60.00$60.66$60.00$75.00
51Inlet protection type C (628.7015)EACH217$60.00$60.66$60.00$85.00
52Temporary ditch checks (628.7504)LF60$9.00$9.10$9.00$10.00
53Culvert pipe checks (628.7555)EACH12$20.00$20.22$20.00$10.00
54Seeding mixture no. 40 (630.0140)LB52$15.00$15.17$15.00$15.00
55Seed water (630.0500)MGAL49$80.00$80.88$80.00$1.00
56Posts wood 4X6-inch X 16-FT (634.0616)EACH11$125.00$126.38$125.00$165.00
57Signs type II reflective H (637.2210)SF50$32.00$32.35$32.00$40.00
58Signs type II reflective F (637.2230)SF9$32.00$32.35$32.00$40.00
59Field office type C (642.5201)EACH1$25,000$7,582.50$20,000$12,000
60Traffic control drums (643.0300)DAY105,000$0.15$0.15$0.15$0.15
61Digital speed reduction system (DSRS) (643.0370.S)DAY362$95.00$96.05$95.00$95.00
62Traffic control barricades type III (643.0420)DAY13,110$0.50$0.51$0.50$0.50
63Traffic control flexible tubular marker posts (643.0500)EACH10$50.00$50.55$50.00$50.00
64Traffic control flexible tubular marker bases (643.0600)EACH10$20.00$20.22$20.00$20.00
65Traffic control warning lights type A (643.0705)DAY13,110$0.25$0.25$0.25$0.25
66Traffic control warning lights type C (643.0715)DAY6,720$0.20$0.20$0.20$0.20
67Traffic control connected arrow boards (643.0810)DAY120$35.00$35.39$35.00$35.00
68Traffic control signs (643.0900)DAY15,900$0.35$0.35$0.35$0.35
69Traffic control signs fixed message (643.1000)SF44$15.00$15.17$15.00$15.00
70Traffic control signs PCMS (643.1050)DAY350$15.00$15.17$15.00$15.00
71Traffic control connected work zone start and end location markers (643.1220)DAY120$20.00$20.22$20.00$20.00
72Temporary marking line removable tape 4-inch (643.3150)LF1,350$1.75$1.77$1.75$1.75
73Temporary marking line removable tape 6-inch (643.3180)LF535$2.00$2.02$2.00$2.00
74Temporary marking crosswalk removable tape 6-inch (643.3350)LF6,800$2.00$2.02$2.00$2.00
75Temporary marking stop line removable tape 18-inch (643.3850)LF24$6.50$6.57$6.50$6.50
76Traffic control (643.5000)EACH1$79,250$80,122$79,250$79,250
77Temporary pedestrian surface matting (644.1440)SF2,860$3.00$3.03$3.00$3.00
78Temporary pedestrian curb ramp (644.1601)DAY210$33.75$34.12$33.75$33.75
79Temporary pedestrian detectable warning field (644.1605)SF495$3.10$3.13$3.10$3.10
80Temporary pedestrian barricade (644.1810)LF4,200$4.25$4.30$4.25$4.25
81Temporary audible message devices (644.1900.S)DAY115$11.50$11.63$11.50$11.50
82Marking line grooved black epoxy 6-inch (646.2025)LF34,500$0.74$0.75$0.74$0.74
83Marking line grooved wet ref epoxy 6-inch (646.2040)LF299,500$1.26$1.27$1.26$1.26
84Marking line grooved wet ref epoxy 10-inch (646.4040)LF19,000$2.71$2.74$2.71$2.71
85Marking arrow epoxy (646.5020)EACH113$249.18$251.92$249.18$249.18
86Marking word epoxy (646.5120)EACH34$372.18$376.27$372.18$372.18
87Marking railroad crossing epoxy (646.5320)EACH10$3,607.31$3,646.99$3,607.31$3,607.31
88Marking stop line epoxy 18-inch (646.6120)LF725$15.42$15.59$15.42$15.42
89Marking yield line epoxy 18-inch (646.6220)EACH32$36.83$37.24$36.83$36.83
90Marking diagonal epoxy 12-inch (646.7120)LF175$15.02$15.19$15.02$15.02
91Marking chevron epoxy 12-inch (646.7320)LF2,200$15.02$15.19$15.02$15.02
92Marking crosswalk epoxy transverse line 6-inch (646.7420)LF4,030$10.56$10.68$10.56$10.56
93Marking curb epoxy (646.8120)LF3,500$7.38$7.46$7.38$7.38
94Marking island nose epoxy (646.8220)EACH110$277.32$280.37$277.32$277.32
95Marking removal line 6-inch (646.9002)LF1,750$2.00$2.02$2.00$2.00
96Construction staking resurfacing reference (650.8000)LF190,000$0.07$0.07$0.07$0.09
97Construction staking curb ramps (650.9000)EACH68$117.65$118.94$117.65$129.00
98Construction staking sidewalk (project) 01. 1520-01-60 (650.9500)EACH1$1,500.00$1,516.50$1,500.00$1,350.00
99Construction staking supplemental control (project) 01. 1520-01-60 (650.9911)EACH1$5,000.00$5,055.00$5,000.00$460.92
100Sawing asphalt (690.0150)LF4,905$0.90$1.77$1.39$1.39
101Sawing concrete (690.0250)LF35,810$2.50$2.38$4.25$2.25
102Incentive compressive strength concrete pavement (715.0720)DOL150$1.00$1.00$1.00$1.00
103Incentive iri ride (740.0440)DOL72,610$1.00$1.00$1.00$1.00
104On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00
105On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,760$5.00$5.00$5.00$5.00
106Special 01. fertilizer for lawn type turf (SPV.0030)CWT1.22$100.00$101.10$100.00$500.00
107Special 01. repair and regrout structures (SPV.0060)EACH8$4,500.00$2,022.00$1,150.00$1,625.00
108Special 02. reconstructing sanitary manholes (SPV.0060)EACH2$6,500.00$6,379.41$3,500.00$7,560.00
109Special 01. preparing topsoil for lawn type turf (SPV.0180)SY1,920$0.80$0.81$0.80$2.00
WisDOT contract 20260113026: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy