WisDOT contract 20260113028 bid tabulation
C Green Lake, Mill Street; Puchyan River Bridge, B-24-0046 (LOC STR, Green Lake County C Green Lake, Mill Street). Let by Wisconsin DOT on January 13, 2026, Green Lake. 3 bids received; low bid $788,512 by Radtke Contractors Inc..
- Owner
- Wisconsin DOT
- Letting
- 13 JAN 2026
- Pay items
- 81
- Data through
- 10 NOV 2026
2 of the 3 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Radtke Contractors Inc. | $788,512 | Low |
| 3 | Lunda Construction Company | $1,014,736 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Radtke Contractors Inc. | 2. Lunda Construction Company |
|---|---|---|---|---|---|
| 1 | Removing structure over waterway remove debris (structure) 01. B-24- 437 (203.0250) | EACH | 1 | $56,406 | $275,000 |
| 2 | Removing concrete pavement (204.0100) | SY | 720 | $8.55 | $6.57 |
| 3 | Removing asphaltic surface (204.0110) | SY | 38 | $20.27 | $7.23 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 119 | $16.31 | $7.70 |
| 5 | Removing guardrail (204.0165) | LF | 28 | $15.00 | $10.00 |
| 6 | Removing inlets (204.0220) | EACH | 2 | $565.00 | $705.00 |
| 7 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 19 | $29.75 | $15.00 |
| 8 | Removing storm sewer (size) 02. 18-inch (204.0245) | LF | 61 | $27.80 | $18.00 |
| 9 | Excavation common (205.0100) | CY | 306 | $38.00 | $17.33 |
| 10 | Excavation for structures bridges (structure) 01. B-24-46 (206.1001) | EACH | 1 | $48,731 | $10,000 |
| 11 | Backfill structure type A (210.1500) | TON | 560 | $29.63 | $25.50 |
| 12 | Finishing roadway (project) 01. 6626-01-70 (213.0100) | EACH | 1 | $500.00 | $2,000.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 479 | $23.00 | $25.15 |
| 14 | Tack coat (455.0605) | GAL | 37 | $12.50 | $12.50 |
| 15 | Asphaltic surface (465.0105) | TON | 148 | $189.20 | $189.20 |
| 16 | Asphaltic surface driveways and field entrances (465.0120) | TON | 9 | $285.50 | $285.50 |
| 17 | Concrete masonry bridges (502.0100) | CY | 309 | $639.65 | $750.00 |
| 18 | Protective surface treatment (502.3200) | SY | 286 | $3.69 | $3.00 |
| 19 | Pigmented surface sealer (502.3210) | SY | 57 | $10.50 | $6.00 |
| 20 | Bar steel reinforcement HS structures (505.0400) | LB | 7,200 | $1.31 | $1.06 |
| 21 | Bar steel reinforcement HS coated structures (505.0600) | LB | 46,340 | $1.33 | $1.17 |
| 22 | Railing steel pedestrian type C4 (513.8021) | LF | 48 | $382.65 | $375.00 |
| 23 | Rubberized membrane waterproofing (516.0500) | SY | 23 | $64.32 | $25.00 |
| 24 | Pre-boring rock or consolidated materials (550.0020) | LF | 240 | $244.80 | $290.00 |
| 25 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 300 | $35.21 | $50.37 |
| 26 | Concrete sidewalk 4-inch (602.0405) | SF | 1,040 | $9.00 | $11.85 |
| 27 | Concrete driveway 6-inch (602.0810) | SY | 35 | $90.00 | $115.65 |
| 28 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 51 | $93.45 | $123.00 |
| 29 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 40 | $119.25 | $155.00 |
| 30 | Inlet covers type H-S (611.0639) | EACH | 2 | $1,000.00 | $915.00 |
| 31 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $5,500.00 | $4,000.00 |
| 32 | Inlets 2X3-FT (611.3230) | EACH | 1 | $4,000.00 | $2,700.00 |
| 33 | Cover plates temporary (611.8120.S) | EACH | 2 | $1,000.00 | $360.00 |
| 34 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 200 | $4.26 | $10.50 |
| 35 | Maintenance and repair of haul roads (project) 01. 6626-01-70 (618.0100) | EACH | 1 | $500.00 | $250.00 |
| 36 | Mobilization (619.1000) | EACH | 1 | $87,301 | $90,849 |
| 37 | Water (624.0100) | MGAL | 12.40 | $158.07 | $50.50 |
| 38 | Salvaged topsoil (625.0500) | SY | 100 | $30.65 | $8.50 |
| 39 | Silt fence (628.1504) | LF | 190 | $3.00 | $5.00 |
| 40 | Silt fence maintenance (628.1520) | LF | 300 | $0.01 | $0.05 |
| 41 | Mobilizations erosion control (628.1905) | EACH | 5 | $125.00 | $200.00 |
| 42 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $10.00 | $100.00 |
| 43 | Erosion mat urban class I type B (628.2008) | SY | 100 | $1.80 | $3.00 |
| 44 | Turbidity barriers (628.6005) | SY | 175 | $38.00 | $48.00 |
| 45 | Inlet protection type C (628.7015) | EACH | 6 | $60.00 | $60.00 |
| 46 | Fertilizer type B (629.0210) | CWT | 0.10 | $100.00 | $1,000.00 |
| 47 | Seeding mixture no. 40 (630.0140) | LB | 10 | $15.00 | $50.00 |
| 48 | Seeding temporary (630.0200) | LB | 10 | $3.00 | $50.00 |
| 49 | Seed water (630.0500) | MGAL | 3.90 | $55.00 | $100.00 |
| 50 | Markers row (633.5100) | EACH | 3 | $50.00 | $100.00 |
| 51 | Field office type B (642.5001) | EACH | 1 | $1,919.36 | $3,000.00 |
| 52 | Traffic control drums (643.0300) | DAY | 555 | $0.50 | $0.50 |
| 53 | Traffic control barricades type III (643.0420) | DAY | 2,619 | $0.50 | $0.50 |
| 54 | Traffic control warning lights type A (643.0705) | DAY | 5,238 | $0.10 | $0.10 |
| 55 | Traffic control signs (643.0900) | DAY | 16,005 | $0.40 | $0.40 |
| 56 | Traffic control covering signs type II (643.0920) | EACH | 25 | $35.00 | $35.00 |
| 57 | Traffic control signs PCMS (643.1050) | DAY | 14 | $85.00 | $85.00 |
| 58 | Traffic control (643.5000) | EACH | 1 | $2,800.00 | $2,800.00 |
| 59 | Geotextile type DF schedule A (645.0111) | SY | 104 | $4.71 | $6.00 |
| 60 | Geotextile type HR (645.0120) | SY | 301 | $5.10 | $3.90 |
| 61 | Construction staking storm sewer (650.4000) | EACH | 2 | $115.00 | $45.14 |
| 62 | Construction staking subgrade (650.4500) | LF | 114 | $0.01 | $0.01 |
| 63 | Construction staking base (650.5000) | LF | 114 | $1.00 | $4.00 |
| 64 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 198 | $1.50 | $2.00 |
| 65 | Construction staking structure layout (structure) 01. B-24-0046 (650.6501) | EACH | 1 | $2,000.00 | $2,606.76 |
| 66 | Construction staking electrical installations (project) 01. 6626-01- 70 (650.8501) | EACH | 1 | $600.00 | $202.30 |
| 67 | Construction staking sidewalk (project) 01. 6626-01-70 (650.9500) | EACH | 1 | $1,300.00 | $416.00 |
| 68 | Construction staking supplemental control (project) 01. 6626-01-70 (650.9911) | EACH | 1 | $1,000.00 | $460.39 |
| 69 | Construction staking slope stakes (650.9920) | LF | 114 | $1.00 | $1.25 |
| 70 | Conduit rigid metallic 2-inch (652.0125) | LF | 8 | $100.00 | $75.00 |
| 71 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 67 | $15.00 | $10.00 |
| 72 | Pull boxes steel 12X24-inch (653.0105) | EACH | 2 | $450.00 | $1,800.00 |
| 73 | Public land reference monument verify and reset (680.0100) | EACH | 1 | $750.00 | $756.18 |
| 74 | Sawing asphalt (690.0150) | LF | 66 | $5.00 | $1.95 |
| 75 | Sawing concrete (690.0250) | LF | 120 | $5.00 | $2.35 |
| 76 | Incentive strength concrete structures (715.0502) | DOL | 1,854 | $1.00 | $1.00 |
| 77 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 |
| 78 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 79 | Special 01. rounded river rock (SPV.0035) | CY | 170 | $144.79 | $112.50 |
| 80 | Special 01. concrete curb & gutter 24-inch type D (SPV.0090) | LF | 198 | $50.00 | $59.95 |
| 81 | Special 02. parapet concrete type "TX" (SPV.0090) | LF | 105 | $323.39 | $435.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.