WisDOT contract 20260113028 bid tabulation

C Green Lake, Mill Street; Puchyan River Bridge, B-24-0046 (LOC STR, Green Lake County C Green Lake, Mill Street). Let by Wisconsin DOT on January 13, 2026, Green Lake. 3 bids received; low bid $788,512 by Radtke Contractors Inc..

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
81
Data through
10 NOV 2026

2 of the 3 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Radtke Contractors Inc.$788,512Low
3Lunda Construction Company$1,014,736+29%
WisDOT contract 20260113028: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Radtke Contractors Inc.2. Lunda Construction Company
1Removing structure over waterway remove debris (structure) 01. B-24- 437 (203.0250)EACH1$56,406$275,000
2Removing concrete pavement (204.0100)SY720$8.55$6.57
3Removing asphaltic surface (204.0110)SY38$20.27$7.23
4Removing concrete sidewalk (204.0155)SY119$16.31$7.70
5Removing guardrail (204.0165)LF28$15.00$10.00
6Removing inlets (204.0220)EACH2$565.00$705.00
7Removing storm sewer (size) 01. 12-inch (204.0245)LF19$29.75$15.00
8Removing storm sewer (size) 02. 18-inch (204.0245)LF61$27.80$18.00
9Excavation common (205.0100)CY306$38.00$17.33
10Excavation for structures bridges (structure) 01. B-24-46 (206.1001)EACH1$48,731$10,000
11Backfill structure type A (210.1500)TON560$29.63$25.50
12Finishing roadway (project) 01. 6626-01-70 (213.0100)EACH1$500.00$2,000.00
13Base aggregate dense 1 1/4-inch (305.0120)TON479$23.00$25.15
14Tack coat (455.0605)GAL37$12.50$12.50
15Asphaltic surface (465.0105)TON148$189.20$189.20
16Asphaltic surface driveways and field entrances (465.0120)TON9$285.50$285.50
17Concrete masonry bridges (502.0100)CY309$639.65$750.00
18Protective surface treatment (502.3200)SY286$3.69$3.00
19Pigmented surface sealer (502.3210)SY57$10.50$6.00
20Bar steel reinforcement HS structures (505.0400)LB7,200$1.31$1.06
21Bar steel reinforcement HS coated structures (505.0600)LB46,340$1.33$1.17
22Railing steel pedestrian type C4 (513.8021)LF48$382.65$375.00
23Rubberized membrane waterproofing (516.0500)SY23$64.32$25.00
24Pre-boring rock or consolidated materials (550.0020)LF240$244.80$290.00
25Piling steel HP 10-inch X 42 LB (550.1100)LF300$35.21$50.37
26Concrete sidewalk 4-inch (602.0405)SF1,040$9.00$11.85
27Concrete driveway 6-inch (602.0810)SY35$90.00$115.65
28Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF51$93.45$123.00
29Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF40$119.25$155.00
30Inlet covers type H-S (611.0639)EACH2$1,000.00$915.00
31Inlets 4-FT diameter (611.3004)EACH1$5,500.00$4,000.00
32Inlets 2X3-FT (611.3230)EACH1$4,000.00$2,700.00
33Cover plates temporary (611.8120.S)EACH2$1,000.00$360.00
34Pipe underdrain wrapped 6-inch (612.0406)LF200$4.26$10.50
35Maintenance and repair of haul roads (project) 01. 6626-01-70 (618.0100)EACH1$500.00$250.00
36Mobilization (619.1000)EACH1$87,301$90,849
37Water (624.0100)MGAL12.40$158.07$50.50
38Salvaged topsoil (625.0500)SY100$30.65$8.50
39Silt fence (628.1504)LF190$3.00$5.00
40Silt fence maintenance (628.1520)LF300$0.01$0.05
41Mobilizations erosion control (628.1905)EACH5$125.00$200.00
42Mobilizations emergency erosion control (628.1910)EACH4$10.00$100.00
43Erosion mat urban class I type B (628.2008)SY100$1.80$3.00
44Turbidity barriers (628.6005)SY175$38.00$48.00
45Inlet protection type C (628.7015)EACH6$60.00$60.00
46Fertilizer type B (629.0210)CWT0.10$100.00$1,000.00
47Seeding mixture no. 40 (630.0140)LB10$15.00$50.00
48Seeding temporary (630.0200)LB10$3.00$50.00
49Seed water (630.0500)MGAL3.90$55.00$100.00
50Markers row (633.5100)EACH3$50.00$100.00
51Field office type B (642.5001)EACH1$1,919.36$3,000.00
52Traffic control drums (643.0300)DAY555$0.50$0.50
53Traffic control barricades type III (643.0420)DAY2,619$0.50$0.50
54Traffic control warning lights type A (643.0705)DAY5,238$0.10$0.10
55Traffic control signs (643.0900)DAY16,005$0.40$0.40
56Traffic control covering signs type II (643.0920)EACH25$35.00$35.00
57Traffic control signs PCMS (643.1050)DAY14$85.00$85.00
58Traffic control (643.5000)EACH1$2,800.00$2,800.00
59Geotextile type DF schedule A (645.0111)SY104$4.71$6.00
60Geotextile type HR (645.0120)SY301$5.10$3.90
61Construction staking storm sewer (650.4000)EACH2$115.00$45.14
62Construction staking subgrade (650.4500)LF114$0.01$0.01
63Construction staking base (650.5000)LF114$1.00$4.00
64Construction staking curb gutter and curb & gutter (650.5500)LF198$1.50$2.00
65Construction staking structure layout (structure) 01. B-24-0046 (650.6501)EACH1$2,000.00$2,606.76
66Construction staking electrical installations (project) 01. 6626-01- 70 (650.8501)EACH1$600.00$202.30
67Construction staking sidewalk (project) 01. 6626-01-70 (650.9500)EACH1$1,300.00$416.00
68Construction staking supplemental control (project) 01. 6626-01-70 (650.9911)EACH1$1,000.00$460.39
69Construction staking slope stakes (650.9920)LF114$1.00$1.25
70Conduit rigid metallic 2-inch (652.0125)LF8$100.00$75.00
71Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF67$15.00$10.00
72Pull boxes steel 12X24-inch (653.0105)EACH2$450.00$1,800.00
73Public land reference monument verify and reset (680.0100)EACH1$750.00$756.18
74Sawing asphalt (690.0150)LF66$5.00$1.95
75Sawing concrete (690.0250)LF120$5.00$2.35
76Incentive strength concrete structures (715.0502)DOL1,854$1.00$1.00
77On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00
78On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00
79Special 01. rounded river rock (SPV.0035)CY170$144.79$112.50
80Special 01. concrete curb & gutter 24-inch type D (SPV.0090)LF198$50.00$59.95
81Special 02. parapet concrete type "TX" (SPV.0090)LF105$323.39$435.00
WisDOT contract 20260113028: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy