WisDOT contract 20260113032 bid tabulation
STH 49 - Winnebago Co Line; Willow Creek Bridge B-69-0055 (CTH D, Waushara County STH 49 - Winnebago Co Line). Let by Wisconsin DOT on January 13, 2026, Waushara. 5 bids received; low bid $1,486,124 by Radtke Contractors Inc..
- Owner
- Wisconsin DOT
- Letting
- 13 JAN 2026
- Pay items
- 69
- Data through
- 10 NOV 2026
4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Radtke Contractors Inc. | $1,486,124 | Low |
| 2 | Sheet Piling Services LLC | $1,557,347 | +5.0% |
| 4 | Lunda Construction Company | $1,867,282 | +26% |
| 5 | Zenith Tech., Inc. - Waukesha | $2,284,550 | +54% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Radtke Contractors Inc. | 2. Sheet Piling Services LLC | 3. Lunda Construction Company | 4. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|
| 1 | Removing structure over waterway minimal debris (structure) 01. B-69- 0973 (203.0260) | EACH | 1 | $86,595 | $100,000 | $505,000 | $128,489 |
| 2 | Removing asphaltic surface (204.0110) | SY | 444 | $3.13 | $12.00 | $3.13 | $4.00 |
| 3 | Removing guardrail (204.0165) | LF | 471 | $3.00 | $3.00 | $3.00 | $3.50 |
| 4 | Excavation common (205.0100) | CY | 1,100 | $21.75 | $17.50 | $21.75 | $25.67 |
| 5 | Excavation, hauling, and disposal of creosote contaminated soil (205.0506.S) | TON | 150 | $81.78 | $115.00 | $30.00 | $91.53 |
| 6 | Excavation for structures bridges (structure) 01. B-69-0055 (206.1001) | EACH | 1 | $52,151 | $127,500 | $25,000 | $54,955 |
| 7 | Cofferdams (structure) 01. B-69- 0055 (206.5001) | EACH | 1 | $142,034 | $75,000 | $105,000 | $308,246 |
| 8 | Backfill structure type A (210.1500) | TON | 255 | $24.43 | $24.75 | $30.33 | $43.00 |
| 9 | Finishing roadway (project) 01. 6911-00-72 (213.0100) | EACH | 1 | $500.00 | $0.01 | $2,000.00 | $1,000.00 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 184 | $29.00 | $30.50 | $29.00 | $54.00 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 790 | $19.63 | $23.25 | $19.63 | $17.86 |
| 12 | Select crushed material (312.0110) | TON | 1,010 | $22.83 | $22.50 | $22.83 | $19.67 |
| 13 | Tack coat (455.0605) | GAL | 102 | $7.54 | $7.54 | $7.54 | $7.54 |
| 14 | Asphaltic surface (465.0105) | TON | 336 | $112.50 | $112.50 | $112.50 | $112.50 |
| 15 | Concrete masonry bridges (502.0100) | CY | 510 | $711.15 | $850.00 | $750.00 | $1,253.64 |
| 16 | Protective surface treatment (502.3200) | SY | 790 | $3.69 | $2.50 | $3.00 | $3.96 |
| 17 | Underwater substructure inspection (structure) 01. B-69-0055 (502.9000.S) | EACH | 1 | $3,500.00 | $4,500.00 | $12,000 | $5,400.00 |
| 18 | Bar steel reinforcement HS structures (505.0400) | LB | 9,330 | $1.35 | $1.25 | $0.99 | $1.17 |
| 19 | Bar steel reinforcement HS coated structures (505.0600) | LB | 87,540 | $1.35 | $1.35 | $1.03 | $1.25 |
| 20 | Railing tubular type M (513.4061) | LF | 366 | $244.56 | $250.00 | $250.00 | $268.38 |
| 21 | Rubberized membrane waterproofing (516.0500) | SY | 14 | $64.32 | $18.00 | $25.00 | $65.95 |
| 22 | Pile redriving (550.0600) | EACH | 5 | $678.73 | $0.01 | $1,675.00 | $3,485.50 |
| 23 | Piling cip concrete 12 3/4 X 0.375- inch (550.2126) | LF | 3,040 | $58.08 | $60.00 | $64.26 | $111.55 |
| 24 | Riprap heavy (606.0300) | CY | 130 | $92.36 | $72.50 | $96.00 | $124.00 |
| 25 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 160 | $4.26 | $6.15 | $4.00 | $10.00 |
| 26 | MGS guardrail 3 (614.2300) | LF | 200 | $26.93 | $26.93 | $26.93 | $28.00 |
| 27 | MGS thrie beam transition (614.2500) | LF | 157.60 | $90.00 | $90.00 | $90.00 | $92.00 |
| 28 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,433.00 | $3,433.00 | $3,433.00 | $3,800.00 |
| 29 | Mobilization (619.1000) | EACH | 1 | $186,966 | $142,590 | $184,694 | $285,000 |
| 30 | Water (624.0100) | MGAL | 40 | $0.01 | $50.00 | $0.01 | $0.01 |
| 31 | Topsoil (625.0100) | SY | 440 | $4.73 | $5.95 | $4.73 | $6.50 |
| 32 | Silt fence (628.1504) | LF | 1,000 | $2.50 | $2.50 | $2.50 | $2.50 |
| 33 | Silt fence maintenance (628.1520) | LF | 2,000 | $0.03 | $0.03 | $0.03 | $0.05 |
| 34 | Mobilizations erosion control (628.1905) | EACH | 5 | $253.00 | $253.00 | $253.00 | $200.00 |
| 35 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $393.00 | $393.00 | $393.00 | $100.00 |
| 36 | Erosion mat urban class I type B (628.2008) | SY | 440 | $3.00 | $3.00 | $3.00 | $2.50 |
| 37 | Turbidity barriers (628.6005) | SY | 210 | $42.00 | $42.00 | $42.00 | $63.00 |
| 38 | Rock bags (628.7570) | EACH | 75 | $9.00 | $9.00 | $9.00 | $17.00 |
| 39 | Fertilizer type B (629.0210) | CWT | 1 | $125.00 | $125.00 | $125.00 | $90.00 |
| 40 | Seeding mixture no. 20 (630.0120) | LB | 45 | $11.00 | $11.00 | $11.00 | $18.00 |
| 41 | Seed water (630.0500) | MGAL | 21 | $35.00 | $35.00 | $35.00 | $75.00 |
| 42 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $125.00 | $125.00 | $125.00 | $75.00 |
| 43 | Signs type II reflective F (637.2230) | SF | 12 | $50.00 | $50.00 | $50.00 | $32.00 |
| 44 | Moving signs type II (638.2102) | EACH | 3 | $125.00 | $125.00 | $125.00 | $75.00 |
| 45 | Removing signs type II (638.2602) | EACH | 6 | $50.00 | $50.00 | $50.00 | $35.00 |
| 46 | Removing small sign supports (638.3000) | EACH | 6 | $50.00 | $50.00 | $50.00 | $35.00 |
| 47 | Moving small sign supports (638.4000) | EACH | 3 | $125.00 | $125.00 | $125.00 | $75.00 |
| 48 | Field office type B (642.5001) | EACH | 1 | $1,719.36 | $5,000.00 | $4,500.00 | $11,446 |
| 49 | Traffic control barricades type III (643.0420) | DAY | 2,520 | $0.40 | $0.40 | $0.40 | $0.40 |
| 50 | Traffic control warning lights type A (643.0705) | DAY | 3,920 | $0.10 | $0.10 | $0.10 | $0.10 |
| 51 | Traffic control signs (643.0900) | DAY | 14,560 | $0.08 | $0.08 | $0.08 | $0.08 |
| 52 | Traffic control covering signs type II (643.0920) | EACH | 5 | $125.00 | $125.00 | $125.00 | $125.00 |
| 53 | Traffic control signs fixed message (643.1000) | SF | 28 | $15.00 | $15.00 | $15.00 | $15.00 |
| 54 | Traffic control signs PCMS (643.1050) | DAY | 14 | $35.00 | $35.00 | $35.00 | $35.00 |
| 55 | Traffic control (643.5000) | EACH | 1 | $7,765.18 | $7,765.18 | $7,765.18 | $7,765.18 |
| 56 | Geotextile type DF schedule A (645.0111) | SY | 110 | $4.71 | $5.00 | $3.50 | $5.00 |
| 57 | Geotextile type HR (645.0120) | SY | 250 | $5.10 | $5.95 | $5.00 | $14.51 |
| 58 | Marking line epoxy 4-inch (646.1020) | LF | 2,510 | $1.94 | $2.30 | $2.30 | $2.30 |
| 59 | Construction staking subgrade (650.4500) | LF | 548 | $0.01 | $0.01 | $0.01 | $0.01 |
| 60 | Construction staking base (650.5000) | LF | 548 | $1.00 | $2.00 | $2.00 | $1.00 |
| 61 | Construction staking structure layout (structure) 01. B-69-0055 (650.6501) | EACH | 1 | $2,000.00 | $9,227.04 | $9,227.04 | $2,000.00 |
| 62 | Construction staking supplemental control (project) 01. 6911-00-72 (650.9911) | EACH | 1 | $750.00 | $460.39 | $460.39 | $750.00 |
| 63 | Construction staking slope stakes (650.9920) | LF | 548 | $1.00 | $2.00 | $2.00 | $1.00 |
| 64 | Sawing asphalt (690.0150) | LF | 45 | $3.00 | $2.95 | $3.00 | $2.95 |
| 65 | Incentive strength concrete structures (715.0502) | DOL | 3,066 | $1.00 | $1.00 | $1.00 | $1.00 |
| 66 | Maintaining bird deterrent system (station) 01. 10+00 (999.2005.S) | EACH | 1 | $0.01 | $0.01 | $2,000.00 | $1.00 |
| 67 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,260 | $5.00 | $5.00 | $5.00 | $5.00 |
| 68 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 |
| 69 | Special 01. temporary portage path (SPV.0090) | LF | 270 | $32.02 | $35.00 | $26.00 | $29.93 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.