9180-17-71. Let by Wisconsin DOT on January 13, 2026, Shawano. 1 bid received; low bid $8,896,489 by Northeast Asphalt, Inc.
- Owner
- Wisconsin DOT
- Letting
- 13 JAN 2026
- Pay items
- 155
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northeast Asphalt, Inc | $8,896,489 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northeast Asphalt, Inc |
|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 40 | $0.01 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 19 | $782.00 |
| 3 | Abatement of asbestos containing material (structure) 01. C-58-27 (203.0211.S) | EACH | 1 | $4,333.33 |
| 4 | Removing structure (structure) 01. sta 496+81 cattle pass (203.0220) | EACH | 1 | $4,274.00 |
| 5 | Removing structure (structure) 02. sta 590+47 cattle pass (203.0220) | EACH | 1 | $6,520.00 |
| 6 | Removing concrete pavement (204.0100) | SY | 120 | $6.50 |
| 7 | Removing asphaltic surface (204.0110) | SY | 8,610 | $5.04 |
| 8 | Removing asphaltic surface butt joints (204.0115) | SY | 1,610 | $5.60 |
| 9 | Removing asphaltic surface milling (204.0120) | SY | 222,000 | $2.40 |
| 10 | Removing curb & gutter (204.0150) | LF | 300 | $12.00 |
| 11 | Removing guardrail (204.0165) | LF | 3,730 | $2.00 |
| 12 | Excavation common (205.0100) | CY | 12,322 | $16.54 |
| 13 | Borrow (208.0100) | CY | 3,991 | $0.01 |
| 14 | Temporary lane shift during culvert work (208.1500.S) | EACH | 26 | $0.01 |
| 15 | Prepare foundation for asphaltic paving (project) 01. 9180-17-71 (211.0101) | EACH | 1 | $30,260 |
| 16 | Prepare foundation for asphaltic paving (project) 02. 9180-17-72 (211.0101) | EACH | 1 | $69,780 |
| 17 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 346 | $106.28 |
| 18 | Prepare foundation for cir base layer (project) 01. 9180-17-71 (211.0700.S) | EACH | 1 | $5,200.00 |
| 19 | Prepare foundation for cir base layer (project) 02. 9180-17-72 (211.0700.S) | EACH | 1 | $5,200.00 |
| 20 | Base repair for cir layer (211.0800.S) | CY | 1,000 | $110.70 |
| 21 | Finishing roadway (project) 01. 9180-17-71 (213.0100) | EACH | 1 | $1,900.00 |
| 22 | Finishing roadway (project) 02. 9180-17-72 (213.0100) | EACH | 1 | $1,900.00 |
| 23 | Base aggregate dense 3/4-inch (305.0110) | TON | 9,250 | $23.95 |
| 24 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 8,710 | $16.04 |
| 25 | Shaping shoulders (305.0500) | STA | 21 | $430.00 |
| 26 | Cir asphaltic base layer (327.1000.S) | SY | 144,360 | $4.70 |
| 27 | Drilled tie bars (416.0610) | EACH | 32 | $20.00 |
| 28 | HMA cold weather paving (450.4000) | TON | 2,100 | $2.65 |
| 29 | Tack coat (455.0605) | GAL | 34,486 | $3.00 |
| 30 | Asphalt stabilizing agent (455.0770.S) | TON | 1,010 | $250.00 |
| 31 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $3,400.00 |
| 32 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 3 | $4,320.00 |
| 33 | Incentive density PWL HMA pavement (460.2005) | DOL | 27,830 | $1.00 |
| 34 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 24,200 | $1.00 |
| 35 | Incentive air voids HMA pavement (460.2010) | DOL | 43,200 | $1.00 |
| 36 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 1,400 | $81.20 |
| 37 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 24,700 | $76.40 |
| 38 | HMA pavement 5 MT 58-34 S (460.6245) | TON | 17,100 | $83.70 |
| 39 | Asphaltic surface (465.0105) | TON | 2,400 | $98.10 |
| 40 | Asphaltic surface driveways and field entrances (465.0120) | TON | 240 | $234.00 |
| 41 | Asphaltic flumes (465.0315) | SY | 36 | $52.00 |
| 42 | Asphaltic rumble strips, centerline (465.0560) | LF | 39,584 | $0.45 |
| 43 | Treated lumber and timber (507.0200) | MBM | 0.10 | $63,959 |
| 44 | Preparation decks type 1 (509.0301) | SY | 16 | $406.00 |
| 45 | Preparation decks type 2 (509.0302) | SY | 8 | $450.00 |
| 46 | Sawing pavement deck preparation areas (509.0310.S) | LF | 160 | $12.00 |
| 47 | Curb repair (509.1200) | LF | 25 | $275.00 |
| 48 | Concrete surface repair (509.1500) | SF | 34 | $275.00 |
| 49 | Concrete masonry deck repair (509.2100.S) | CY | 2 | $4,500.00 |
| 50 | Removing asphaltic concrete deck overlay (structure) 01. C-58-27 (509.9010.S) | SY | 78 | $62.00 |
| 51 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 6 | $518.00 |
| 52 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 6 | $652.00 |
| 53 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 8 | $1,003.00 |
| 54 | Apron endwalls for culvert pipe 36- inch (520.1036) | EACH | 4 | $1,427.00 |
| 55 | Culvert pipe class III-B non-metal 18-inch (520.3618) | LF | 160 | $118.50 |
| 56 | Culvert pipe class III-B non-metal 24-inch (520.3624) | LF | 276 | $145.80 |
| 57 | Culvert pipe class III-B non-metal 30-inch (520.3630) | LF | 272 | $183.65 |
| 58 | Culvert pipe class III-B non-metal 36-inch (520.3636) | LF | 272 | $187.40 |
| 59 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 136 | $143.40 |
| 60 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 142 | $220.35 |
| 61 | Culvert pipe reinforced concrete class IV 54-inch (522.0454) | LF | 112 | $448.74 |
| 62 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 4 | $1,714.00 |
| 63 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 4 | $2,759.50 |
| 64 | Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054) | EACH | 2 | $4,116.75 |
| 65 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429) | LF | 208 | $294.95 |
| 66 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (522.2434) | LF | 216 | $335.65 |
| 67 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 6 | $2,773.00 |
| 68 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634) | EACH | 4 | $3,589.00 |
| 69 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 160 | $75.00 |
| 70 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 281 | $29.00 |
| 71 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 152 | $75.00 |
| 72 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 80 | $75.00 |
| 73 | Concrete curb pedestrian (601.0600) | LF | 25 | $70.00 |
| 74 | Concrete sidewalk 4-inch (602.0405) | SF | 205 | $8.75 |
| 75 | Concrete sidewalk 6-inch (602.0415) | SF | 150 | $9.00 |
| 76 | Curb ramp detectable warning field yellow (602.0505) | SF | 20 | $35.00 |
| 77 | Concrete surface drains (602.3010) | CY | 12 | $850.00 |
| 78 | Riprap medium (606.0200) | CY | 40 | $150.00 |
| 79 | Riprap heavy (606.0300) | CY | 14 | $150.00 |
| 80 | Adjusting inlet covers (611.8115) | EACH | 18 | $850.00 |
| 81 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 2 | $4,000.00 |
| 82 | MGS guardrail 3 (614.2300) | LF | 1,900 | $26.00 |
| 83 | MGS guardrail 3 L (614.2340) | LF | 225 | $32.50 |
| 84 | MGS guardrail short radius (614.2350) | LF | 25.50 | $32.00 |
| 85 | MGS thrie beam transition (614.2500) | LF | 158.40 | $92.00 |
| 86 | MGS guardrail terminal eat (614.2610) | EACH | 12 | $3,800.00 |
| 87 | MGS guardrail short radius terminal (614.2630) | EACH | 2 | $2,200.00 |
| 88 | Maintenance and repair of haul roads (project) 01. 9180-17-71 (618.0100) | EACH | 1 | $100.00 |
| 89 | Maintenance and repair of haul roads (project) 02. 9180-17-72 (618.0100) | EACH | 1 | $100.00 |
| 90 | Mobilization (619.1000) | EACH | 1 | $838,640 |
| 91 | Water (624.0100) | MGAL | 100 | $44.40 |
| 92 | Topsoil (625.0100) | SY | 43,300 | $0.01 |
| 93 | Mulching (627.0200) | SY | 33,000 | $0.30 |
| 94 | Silt fence (628.1504) | LF | 13,200 | $1.92 |
| 95 | Silt fence maintenance (628.1520) | LF | 26,400 | $0.01 |
| 96 | Mobilizations erosion control (628.1905) | EACH | 12 | $200.00 |
| 97 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $150.00 |
| 98 | Erosion mat urban class I type B (628.2008) | SY | 1,200 | $1.90 |
| 99 | Erosion mat class II type C (628.2027) | SY | 9,500 | $2.90 |
| 100 | Turbidity barriers (628.6005) | SY | 70 | $60.00 |
| 101 | Inlet protection type A (628.7005) | EACH | 18 | $25.00 |
| 102 | Inlet protection type C (628.7015) | EACH | 18 | $72.00 |
| 103 | Temporary ditch checks (628.7504) | LF | 1,150 | $7.65 |
| 104 | Culvert pipe checks (628.7555) | EACH | 204 | $15.00 |
| 105 | Fertilizer type B (629.0210) | CWT | 32 | $95.00 |
| 106 | Seeding mixture no. 20 (630.0120) | LB | 810 | $6.65 |
| 107 | Seed water (630.0500) | MGAL | 1,000 | $5.00 |
| 108 | Markers culvert end (633.5200) | EACH | 38 | $70.00 |
| 109 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 15 | $82.00 |
| 110 | Moving signs type II (638.2102) | EACH | 15 | $100.00 |
| 111 | Field office type B (642.5001) | EACH | 1 | $11,870 |
| 112 | Traffic control drums (643.0300) | DAY | 14,460 | $0.50 |
| 113 | Traffic control barricades type III (643.0420) | DAY | 3,482 | $0.70 |
| 114 | Traffic control warning lights type A (643.0705) | DAY | 6,406 | $0.10 |
| 115 | Traffic control signs (643.0900) | DAY | 17,685 | $0.85 |
| 116 | Traffic control covering signs type II (643.0920) | EACH | 12 | $20.00 |
| 117 | Traffic control signs fixed message (643.1000) | SF | 72 | $9.40 |
| 118 | Temporary marking line paint 6- inch (643.3165) | LF | 166,960 | $0.35 |
| 119 | Temporary marking line paint 10- inch (643.3265) | LF | 1,690 | $0.80 |
| 120 | Traffic control (643.5000) | EACH | 1 | $4,565.00 |
| 121 | Temporary pedestrian barricade (644.1810) | LF | 24 | $3.00 |
| 122 | Geotextile type HR (645.0120) | SY | 170 | $5.00 |
| 123 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 166,960 | $1.20 |
| 124 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,690 | $2.30 |
| 125 | Marking arrow epoxy (646.5020) | EACH | 6 | $250.00 |
| 126 | Marking word epoxy (646.5120) | EACH | 2 | $350.00 |
| 127 | Cold weather marking epoxy 6-inch (646.6466) | LF | 166,960 | $0.32 |
| 128 | Marking diagonal epoxy 12-inch (646.7120) | LF | 700 | $12.00 |
| 129 | Marking chevron epoxy 12-inch (646.7320) | LF | 145 | $12.00 |
| 130 | Locating no-passing zones (648.0100) | MI | 0.99 | $3,500.00 |
| 131 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 441 | $0.69 |
| 132 | Construction staking pipe culverts (650.6000) | EACH | 22 | $112.55 |
| 133 | Construction staking structure layout (structure) 01. C-58-27 (650.6501) | EACH | 1 | $500.00 |
| 134 | Construction staking resurfacing reference (650.8000) | LF | 60,870 | $0.09 |
| 135 | Construction staking curb ramps (650.9000) | EACH | 2 | $93.05 |
| 136 | Construction staking sidewalk (project) 01. 9180-17-72 (650.9500) | EACH | 1 | $48.99 |
| 137 | Construction staking supplemental control (project) 01. 9180-17-71 (650.9911) | EACH | 1 | $446.98 |
| 138 | Construction staking supplemental control (project) 02. 9180-17-72 (650.9911) | EACH | 1 | $446.98 |
| 139 | Construction staking slope stakes (650.9920) | LF | 27,035 | $0.90 |
| 140 | Public land reference monument verify and reset (680.0100) | EACH | 6 | $619.04 |
| 141 | Sawing asphalt (690.0150) | LF | 10,290 | $1.35 |
| 142 | Sawing concrete (690.0250) | LF | 220 | $2.25 |
| 143 | Incentive strength concrete structures (715.0502) | DOL | 500 | $1.00 |
| 144 | Incentive iri ride (740.0440) | DOL | 45,826 | $1.00 |
| 145 | Installing and maintaining bird deterrent system (station) 01. 295+30 (999.2000.S) | EACH | 1 | $5,368.00 |
| 146 | Maintaining climbing turtle exclusion fence (999.2105.S) | LF | 33,100 | $0.50 |
| 147 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 |
| 148 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,800 | $5.00 |
| 149 | Special 01. base repair for base stabilization process (SPV.0035) | CY | 200 | $150.00 |
| 150 | Special 02. polyjacking bridge approaches B-58-0116 (SPV.0060) | EACH | 1 | $14,774 |
| 151 | Special 01. removing bridge railing C-58-27 (SPV.0090) | LF | 44 | $65.00 |
| 152 | Special 01. protective thermoplastic coating at snowmobile crossing (SPV.0180) | SY | 405 | $139.40 |
| 153 | Special 02. stabilized base reclamation (SPV.0180) | SY | 14,160 | $9.00 |
| 154 | Special 03. spray applied membrane waterproofing for asphaltic overlays (SPV.0180) | SY | 78 | $262.83 |
| 155 | Special 01. asphalt stabilizing agent for base (SPV.0195) | TON | 220 | $350.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.