WisDOT contract 20260113041 bid tabulation
Thorp - Abbottsford; CTH D to STH 13 (STH 029, Clark County Thorp - Abbotsford). Let by Wisconsin DOT on January 13, 2026, Clark. 2 bids received; low bid $17,367,813 by Rock Road Companies, Inc..
- Owner
- Wisconsin DOT
- Letting
- 13 JAN 2026
- Pay items
- 130
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rock Road Companies, Inc. | $17,367,813 | Low |
| 2 | American Asphalt of Wisconsin | $18,271,566 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rock Road Companies, Inc. | 2. American Asphalt of Wisconsin |
|---|---|---|---|---|---|
| 1 | Removing concrete pavement butt joints (204.0105) | SY | 8,465 | $5.66 | $5.68 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 3,076 | $7.74 | $5.09 |
| 3 | Removing asphaltic surface milling (204.0120) | SY | 134,420 | $3.30 | $2.44 |
| 4 | Removing curb & gutter (204.0150) | LF | 208 | $18.55 | $12.50 |
| 5 | Removing guardrail (204.0165) | LF | 6,244 | $2.90 | $1.75 |
| 6 | Removing surface drains (204.0190) | EACH | 10 | $745.00 | $1,500.00 |
| 7 | Removing storm sewer (size) 01. 24-inch (204.0245) | LF | 75 | $46.50 | $275.00 |
| 8 | Removing (item description) 01. apron endwalls 18-inch (204.9060.S) | EACH | 1 | $500.00 | $250.00 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 1050-01-74 (211.0101) | EACH | 1 | $14,814 | $194,765 |
| 10 | Finishing roadway (project) 01. 1050-01-74 (213.0100) | EACH | 1 | $4,589.70 | $6,850.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 29,185 | $19.90 | $20.02 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 500 | $29.00 | $25.00 |
| 13 | Drilled tie bars (416.0610) | EACH | 1,600 | $9.53 | $9.63 |
| 14 | Drilled dowel bars (416.0620) | EACH | 9,225 | $12.80 | $12.93 |
| 15 | HMA cold weather paving (450.4000) | TON | 5,000 | $2.00 | $0.10 |
| 16 | Tack coat (455.0605) | GAL | 64,445 | $3.40 | $3.50 |
| 17 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $3,500.00 | $3,500.00 |
| 18 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,500.00 | $3,500.00 |
| 19 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 1 | $3,500.00 | $3,500.00 |
| 20 | HMA pavement test strip density (460.0120.S) | EACH | 1 | $3,500.00 | $3,500.00 |
| 21 | Incentive density HMA pavement (460.2000) | DOL | 37,330 | $1.00 | $1.00 |
| 22 | Incentive density PWL HMA pavement (460.2005) | DOL | 33,180 | $1.00 | $1.00 |
| 23 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 25,250 | $1.00 | $1.00 |
| 24 | Incentive air voids HMA pavement (460.2010) | DOL | 46,390 | $1.00 | $1.00 |
| 25 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 31,734 | $85.66 | $93.66 |
| 26 | HMA pavement 4 MT 58-34 V (460.6644) | TON | 41,982 | $84.81 | $93.66 |
| 27 | HMA pavement 5 MT 58-34 V (460.6645) | TON | 5,280 | $93.58 | $93.66 |
| 28 | HMA pavement 4 SMA 58-34 V (460.8644) | TON | 47,979 | $91.64 | $93.66 |
| 29 | Material transfer vehicle (460.9000.S) | EACH | 1 | $0.01 | $40,000 |
| 30 | Asphaltic surface (465.0105) | TON | 1,000 | $107.43 | $137.40 |
| 31 | Asphaltic surface patching (465.0110) | TON | 300 | $107.43 | $149.15 |
| 32 | Asphaltic surface driveways and field entrances (465.0120) | TON | 30 | $133.55 | $202.20 |
| 33 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 237,980 | $0.13 | $0.24 |
| 34 | Resin binder high friction surface treatment (490.0100.S) | SY | 22,245 | $19.06 | $19.06 |
| 35 | Preparation decks type 1 (509.0301) | SY | 99 | $354.30 | $354.30 |
| 36 | Preparation decks type 2 (509.0302) | SY | 39 | $376.00 | $752.00 |
| 37 | Sawing pavement deck preparation areas (509.0310.S) | LF | 990 | $8.50 | $8.50 |
| 38 | Concrete surface repair (509.1500) | SF | 4 | $225.00 | $450.00 |
| 39 | Concrete masonry deck repair (509.2100.S) | CY | 8 | $1,812.50 | $3,625.00 |
| 40 | Polymer overlay (509.5100.S) | SY | 2,813 | $36.39 | $36.49 |
| 41 | Concrete collars for pipe (520.8000) | EACH | 8 | $1,100.00 | $750.00 |
| 42 | Cleaning culvert pipes (520.8700) | EACH | 32 | $1,485.00 | $503.00 |
| 43 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 1 | $765.00 | $450.00 |
| 44 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $2,600.00 | $1,500.00 |
| 45 | Culvert pipe salvaged 18-inch (524.0118) | LF | 88 | $116.00 | $60.00 |
| 46 | Apron endwalls for culvert pipe salvaged 18-inch (524.0618) | EACH | 6 | $560.00 | $400.00 |
| 47 | Culvert pipe corrugated polyethylene 24-inch (530.0124) | LF | 75 | $80.65 | $65.00 |
| 48 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 148 | $39.97 | $40.37 |
| 49 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 560 | $39.97 | $40.37 |
| 50 | Concrete surface drains (602.3010) | CY | 33.80 | $1,136.46 | $1,147.82 |
| 51 | Concrete barrier temporary precast delivered (603.8000) | LF | 5,000 | $12.04 | $12.16 |
| 52 | Concrete barrier temporary precast installed (603.8125) | LF | 7,400 | $4.95 | $5.00 |
| 53 | Riprap medium (606.0200) | CY | 32 | $139.00 | $115.00 |
| 54 | Barrier system grading shaping finishing (614.0010) | EACH | 21 | $7,424.00 | $5,533.00 |
| 55 | Steel thrie beam bullnose terminal (614.0220) | EACH | 5 | $17,500 | $13,000 |
| 56 | Steel thrie beam (614.0230) | LF | 400 | $41.20 | $34.00 |
| 57 | Crash cushions temporary (614.0905) | EACH | 4 | $4,400.00 | $4,797.50 |
| 58 | MGS guardrail 3 (614.2300) | LF | 3,967 | $23.50 | $26.03 |
| 59 | MGS thrie beam transition (614.2500) | LF | 709.20 | $93.55 | $87.00 |
| 60 | MGS guardrail terminal eat (614.2610) | EACH | 15 | $3,575.00 | $3,233.00 |
| 61 | MGS guardrail terminal type 2 (614.2620) | EACH | 5 | $2,990.00 | $2,433.00 |
| 62 | Maintenance and repair of haul roads (project) 01. 1050-01-74 (618.0100) | EACH | 1 | $0.01 | $1.00 |
| 63 | Mobilization (619.1000) | EACH | 1 | $125,000 | $251,652 |
| 64 | Water (624.0100) | MGAL | 457 | $50.00 | $50.00 |
| 65 | Topsoil (625.0100) | SY | 100 | $8.00 | $6.00 |
| 66 | Silt fence (628.1504) | LF | 8,060 | $1.85 | $1.60 |
| 67 | Silt fence maintenance (628.1520) | LF | 8,060 | $0.01 | $0.03 |
| 68 | Mobilizations erosion control (628.1905) | EACH | 12 | $685.00 | $130.00 |
| 69 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $1.00 | $153.00 |
| 70 | Erosion mat urban class I type B (628.2008) | SY | 6,050 | $1.75 | $1.60 |
| 71 | Inlet protection type A (628.7005) | EACH | 5 | $190.00 | $100.00 |
| 72 | Temporary ditch checks (628.7504) | LF | 250 | $8.00 | $8.00 |
| 73 | Culvert pipe checks (628.7555) | EACH | 27 | $16.00 | $20.00 |
| 74 | Fertilizer type B (629.0210) | CWT | 4.28 | $150.00 | $105.00 |
| 75 | Seeding mixture no. 20 (630.0120) | LB | 276.20 | $11.70 | $9.00 |
| 76 | Seed water (630.0500) | MGAL | 142 | $1.00 | $5.00 |
| 77 | Sign supports replacing base connection bolts (635.0300) | EACH | 16 | $390.00 | $75.00 |
| 78 | Signs type I reflective SH (637.1220) | SF | 2,230.50 | $33.10 | $27.00 |
| 79 | Removing signs type I (638.2601) | EACH | 26 | $285.00 | $333.00 |
| 80 | Field office type D (642.5401) | EACH | 1 | $13,050 | $18,775 |
| 81 | Traffic control drums (643.0300) | DAY | 58,040 | $0.38 | $0.38 |
| 82 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 582 | $226.37 | $226.37 |
| 83 | Traffic control barricades type III (643.0420) | DAY | 14,070 | $0.73 | $0.73 |
| 84 | Traffic control warning lights type A (643.0705) | DAY | 27,880 | $0.16 | $0.16 |
| 85 | Traffic control warning lights type C (643.0715) | DAY | 5,920 | $0.19 | $0.19 |
| 86 | Traffic control connected arrow boards (643.0810) | DAY | 1,214 | $18.26 | $18.26 |
| 87 | Traffic control signs (643.0900) | DAY | 30,240 | $0.47 | $0.47 |
| 88 | Traffic control covering signs type I (643.0910) | EACH | 25 | $201.13 | $201.13 |
| 89 | Traffic control covering signs type II (643.0920) | EACH | 45 | $89.48 | $89.48 |
| 90 | Traffic control signs fixed message (643.1000) | SF | 180 | $34.33 | $34.33 |
| 91 | Traffic control signs PCMS (643.1050) | DAY | 306 | $65.04 | $65.04 |
| 92 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 582 | $7.84 | $7.48 |
| 93 | Temporary marking line epoxy 6- inch (643.3170) | LF | 554,626 | $0.52 | $0.52 |
| 94 | Temporary marking line removable tape 6-inch (643.3180) | LF | 33,120 | $3.00 | $3.00 |
| 95 | Temporary marking line removable tape 10-inch (643.3280) | LF | 3,600 | $5.58 | $5.58 |
| 96 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 3,140 | $3.46 | $3.46 |
| 97 | Traffic control (643.5000) | EACH | 1 | $35,514 | $35,514 |
| 98 | Geotextile type HR (645.0120) | SY | 88 | $7.00 | $5.95 |
| 99 | Geotextile type R (645.0130) | SY | 259 | $5.00 | $5.00 |
| 100 | Marking line epoxy 6-inch (646.2020) | LF | 9,171 | $0.65 | $1.30 |
| 101 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 31,928 | $0.70 | $0.70 |
| 102 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 269,590 | $1.20 | $1.20 |
| 103 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 31,928 | $7.25 | $7.25 |
| 104 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 12,658 | $11.50 | $11.50 |
| 105 | Marking aerial enforcement bar epoxy (646.5420) | EACH | 30 | $180.00 | $180.00 |
| 106 | Marking stop line epoxy 18-inch (646.6120) | LF | 205 | $25.00 | $25.00 |
| 107 | Cold weather marking epoxy 6-inch (646.6466) | LF | 66,500 | $0.32 | $0.32 |
| 108 | Marking chevron epoxy 24-inch (646.7220) | LF | 702 | $10.00 | $10.00 |
| 109 | Marking curb epoxy (646.8120) | LF | 100 | $11.00 | $11.00 |
| 110 | Marking island nose epoxy (646.8220) | EACH | 8 | $350.00 | $350.00 |
| 111 | Marking removal line 6-inch (646.9002) | LF | 1,320 | $1.30 | $1.30 |
| 112 | Marking removal plowable raised pavement markers (646.9400) | EACH | 1,274 | $65.00 | $37.71 |
| 113 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 560 | $1.50 | $1.50 |
| 114 | Construction staking resurfacing reference (650.8000) | LF | 127,710 | $0.08 | $0.08 |
| 115 | Construction staking supplemental control (project) 01. 1050-01-74 (650.9911) | EACH | 1 | $992.20 | $992.20 |
| 116 | Public land reference monument verify and reset (680.0100) | EACH | 7 | $400.00 | $400.00 |
| 117 | Sawing asphalt (690.0150) | LF | 68 | $1.75 | $9.13 |
| 118 | Sawing concrete (690.0250) | LF | 25,439 | $2.35 | $2.29 |
| 119 | Incentive iri ride (740.0440) | DOL | 47,995 | $1.00 | $1.00 |
| 120 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 2,210 | $5.20 | $4.00 |
| 121 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 |
| 122 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,400 | $5.00 | $5.00 |
| 123 | Special 01. foam void filling (SPV.0060) | EACH | 1 | $15,368 | $15,368 |
| 124 | Special 02. reconstruct inlets with vane drains (SPV.0060) | EACH | 12 | $3,000.00 | $2,500.00 |
| 125 | Special 01. remove and reinstall four strand HT cable barrier (SPV.0090) | LF | 1,000 | $41.65 | $5.33 |
| 126 | Special 02. ditch cleaning (SPV.0090) | LF | 3,025 | $7.50 | $12.50 |
| 127 | Special 03. remove and replace concrete barrier wall (SPV.0090) | LF | 84 | $359.74 | $363.34 |
| 128 | Special 01. concrete pavement repair doweled (SPV.0180) | SY | 5,302 | $93.87 | $97.00 |
| 129 | Special 02. concrete pavement replacement doweled (SPV.0180) | SY | 3,414 | $93.87 | $97.00 |
| 130 | Special 03. 30-inch concrete centerline repair (SPV.0180) | SY | 159 | $122.38 | $123.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.