| 1 | Clearing (201.0105) | STA | 6 | $650.00 | $650.00 |
| 2 | Grubbing (201.0205) | STA | 6 | $190.00 | $190.00 |
| 3 | Removing structure over waterway remove debris (structure) 01. B-54- 408 (203.0250) | EACH | 1 | $265,500 | $85,000 |
| 4 | Removing concrete pavement (204.0100) | SY | 1,444 | $17.80 | $17.80 |
| 5 | Excavation common (205.0100) | CY | 2,027 | $10.40 | $10.40 |
| 6 | Excavation for structures bridges (structure) 01. B-54-131 (206.1001) | EACH | 1 | $142,000 | $60,000 |
| 7 | Borrow (208.0100) | CY | 4,544 | $18.50 | $18.50 |
| 8 | Backfill structure type A (210.1500) | TON | 338 | $24.00 | $24.00 |
| 9 | Finishing roadway (project) 01. 1580-00-70 (213.0100) | EACH | 1 | $750.00 | $750.00 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 309 | $31.40 | $31.40 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 4,380 | $18.45 | $18.45 |
| 12 | Select crushed material (312.0110) | TON | 106 | $41.00 | $41.00 |
| 13 | Concrete pavement approach slab (415.0410) | SY | 80 | $309.71 | $309.71 |
| 14 | Tack coat (455.0605) | GAL | 241 | $6.03 | $6.03 |
| 15 | Asphaltic surface (465.0105) | TON | 854 | $142.29 | $142.29 |
| 16 | Asphaltic surface temporary (465.0125) | TON | 202 | $140.91 | $140.91 |
| 17 | Concrete masonry bridges (502.0100) | CY | 402 | $800.00 | $900.00 |
| 18 | Protective surface treatment (502.3200) | SY | 578 | $3.00 | $4.00 |
| 19 | Pigmented surface sealer (502.3210) | SY | 112 | $5.00 | $10.00 |
| 20 | Prestressed girder type I 36W-inch (503.0137) | LF | 426 | $300.00 | $320.00 |
| 21 | Bar steel reinforcement HS structures (505.0400) | LB | 7,260 | $1.31 | $1.51 |
| 22 | Bar steel reinforcement HS coated structures (505.0600) | LB | 52,280 | $1.46 | $1.67 |
| 23 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 1,640 | $3.64 | $3.83 |
| 24 | Bar couplers no. 8 (505.0908) | EACH | 24 | $110.00 | $120.00 |
| 25 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 12 | $100.00 | $140.00 |
| 26 | Steel diaphragms (structure) 01. B- 54-131 (506.4000) | EACH | 5 | $1,000.00 | $1,500.00 |
| 27 | Temporary shoring (structure) 01. B-54-131 (511.1200) | SF | 1,700 | $50.00 | $83.00 |
| 28 | Rubberized membrane waterproofing (516.0500) | SY | 30 | $25.00 | $60.00 |
| 29 | Piling cip concrete 10 3/4 X 0.365- inch (550.2106) | LF | 1,320 | $55.00 | $55.00 |
| 30 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 53 | $65.31 | $65.31 |
| 31 | Concrete surface drains (602.3010) | CY | 2.60 | $1,251.35 | $1,251.35 |
| 32 | Concrete barrier temporary precast delivered (603.8000) | LF | 1,890 | $12.30 | $12.30 |
| 33 | Concrete barrier temporary precast installed (603.8125) | LF | 1,890 | $7.46 | $7.46 |
| 34 | Riprap light (606.0100) | CY | 3 | $172.00 | $172.00 |
| 35 | Riprap heavy (606.0300) | CY | 545 | $64.00 | $64.00 |
| 36 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 180 | $8.00 | $8.00 |
| 37 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $200.00 | $450.00 |
| 38 | Crash cushions temporary (614.0905) | EACH | 2 | $4,750.00 | $4,435.00 |
| 39 | MGS guardrail 3 (614.2300) | LF | 125 | $24.85 | $24.85 |
| 40 | MGS thrie beam transition (614.2500) | LF | 157.60 | $95.20 | $95.20 |
| 41 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,640.00 | $3,640.00 |
| 42 | Maintenance and repair of haul roads (project) 01. 1580-00-70 (618.0100) | EACH | 1 | $0.01 | $500.00 |
| 43 | Mobilization (619.1000) | EACH | 1 | $285,800 | $450,000 |
| 44 | Water (624.0100) | MGAL | 130 | $1.00 | $1.00 |
| 45 | Salvaged topsoil (625.0500) | SY | 7,426 | $2.00 | $2.00 |
| 46 | Mulching (627.0200) | SY | 9,280 | $0.35 | $0.35 |
| 47 | Silt fence (628.1504) | LF | 1,350 | $1.90 | $1.90 |
| 48 | Silt fence maintenance (628.1520) | LF | 1,350 | $0.01 | $0.01 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 8 | $725.00 | $725.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $15.00 | $15.00 |
| 51 | Erosion mat class II type C (628.2027) | SY | 2,045 | $4.55 | $4.55 |
| 52 | Turbidity barriers (628.6005) | SY | 200 | $40.00 | $40.00 |
| 53 | Temporary ditch checks (628.7504) | LF | 20 | $10.00 | $10.00 |
| 54 | Fertilizer type B (629.0210) | CWT | 6 | $150.00 | $150.00 |
| 55 | Seeding mixture no. 20 (630.0120) | LB | 420 | $15.00 | $15.00 |
| 56 | Seeding temporary (630.0200) | LB | 200 | $3.00 | $3.00 |
| 57 | Seed water (630.0500) | MGAL | 170 | $1.00 | $1.00 |
| 58 | Delineators temporary (633.1100) | EACH | 80 | $21.00 | $21.00 |
| 59 | Field office type C (642.5201) | EACH | 1 | $4,500.00 | $8,000.00 |
| 60 | Traffic control drums (643.0300) | DAY | 6,700 | $0.13 | $0.13 |
| 61 | Traffic control barricades type III (643.0420) | DAY | 125 | $0.45 | $0.45 |
| 62 | Traffic control warning lights type A (643.0705) | DAY | 225 | $0.10 | $0.10 |
| 63 | Traffic control warning lights type C (643.0715) | DAY | 3,050 | $0.09 | $0.09 |
| 64 | Traffic control signs (643.0900) | DAY | 3,150 | $0.15 | $0.15 |
| 65 | Temporary marking line paint 6- inch (643.3165) | LF | 3,748 | $0.60 | $0.60 |
| 66 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 24 | $7.00 | $7.00 |
| 67 | Traffic control (643.5000) | EACH | 1 | $15,220 | $15,220 |
| 68 | Geotextile type DF schedule A (645.0111) | SY | 94 | $5.00 | $5.00 |
| 69 | Geotextile type HR (645.0120) | SY | 840 | $5.00 | $5.00 |
| 70 | Geotextile type R (645.0130) | SY | 11 | $5.00 | $5.00 |
| 71 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 4,520 | $1.74 | $1.74 |
| 72 | Marking removal line 4-inch (646.9000) | LF | 1,938 | $0.90 | $0.90 |
| 73 | Construction staking subgrade (650.4500) | LF | 850 | $0.01 | $0.01 |
| 74 | Construction staking base (650.5000) | LF | 850 | $1.00 | $0.01 |
| 75 | Construction staking structure layout (structure) 01. B-54-131 (650.6501) | EACH | 1 | $3,800.00 | $3,876.00 |
| 76 | Construction staking supplemental control (project) 01. 1580-00-70 (650.9911) | EACH | 1 | $1,000.00 | $442.00 |
| 77 | Construction staking slope stakes (650.9920) | LF | 850 | $1.00 | $0.90 |
| 78 | Temporary traffic signals for bridges (structure) 01. B-54-131 (661.0101) | EACH | 1 | $5,975.00 | $5,975.00 |
| 79 | Sawing asphalt (690.0150) | LF | 1,260 | $1.95 | $1.95 |
| 80 | Sawing concrete (690.0250) | LF | 698 | $2.55 | $2.55 |
| 81 | Incentive strength concrete structures (715.0502) | DOL | 2,424 | $1.00 | $1.00 |
| 82 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 |
| 83 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 |
| 84 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 |
| 85 | Special 01. temporary bypass sta 675+84 (SPV.0060) | EACH | 1 | $22,250 | $22,250 |